R/2025/0757/CD

Planning Application Details - Official Consultation has expired.

Location
LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE
Proposal
Partial re-discharge of Requirement 3(4) (Detailed design) Work No. 3A Electrical Connection Works of reference number EN010103 of the Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and NetZero pursuant to section 114 ‘Gra...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
Net Zero Teesside Power Limited
Applicant's Address
c/o Agent (DWD Ltd) 69 Carter Lane London EC4V 5EQ
Agent
DWD Ltd
Agent's Address
MR ROBERT BOOTH 69 Carter Lane London EC4V 5EQ
Agent's work phone
Agent's email
Case Officer
Mr A Miller
Case Officer Telephone
01287 612454
Case Officer Email
Adrian.Miller@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
14/11/2025
Date Valid
14/11/2025
Expiry
09/01/2026
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
11/12/2025
Decision Level
-

Conditions table
# Condition Details
1 Requirement 3(4) is now worded as follows, with amended text highlighted in red: (4) “No part of the authorised development comprised in Work No. 3 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)— (a) the route and method of installation of the 275 kilovolt electrical cables and control system cables running from Work No. 1 to the existing substation at Tod Point; (b) the connections within the existing substation at Tod Point, including electrical cables, connections to the existing busbars and new, upgraded or replacement equipment; and (c) works involving trenchless technologies including their location; and (d) the siting and external appearance of cable support structures.”

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 411 kb 14/11/2025
Decision
Compliance Decision Notice 182 kb 11/12/2025
Officer Report
Compliance Officer Report 190 kb 11/12/2025
Supporting Documentation
Covering Letter 260 kb 14/11/2025
Requirement 3(4) - 275 HV SCOPE BRIDGE B6A OVERALL LAYOUT1177 0360 007 68 4003 001 (003) 5693 kb 14/11/2025
Requirement 3(4) - 275 HV SCOPE BRIDGE B6A STRUCTURAL STEELWORK GENERAL ARRANGEMENT TO PAR 1,2 &31177 0360 007 68 4003 003 5216 kb 14/11/2025
Requirement 3(4) - 275 HV SCOPE BRIDGE B6A STRUCTURAL STEELWORK GENERAL ARRANGEMENT TO PAR 4,5 & 61177 0360 007 68 4003 005 5161 kb 14/11/2025
Requirement 3(4) - 275 HV SCOPE BRIDGE B6A CLADDING GENERAL ARRANGEMENT TO PAR 4, 5 & 61177 0360 007 68 4003 008 4139 kb 14/11/2025
Requirement 3(4) - 275 HV SCOPE BRIDGE B19A ACROSS NATIONAL RAIL GENERAL ARRANGEMENT 1177 0360 007 68 4001 001 4276 kb 14/11/2025
Requirement 3(4) - 275 HV SCOPE BRIDGE B19A STRUCTURAL STEELWORK GENERAL ARRANGEMENT TO PAR 02 A-C 1177 0360 007 68 4001 003 4150 kb 14/11/2025
Requirement 3(4) - Hv Alighment Sheet 1 1860 kb 14/11/2025
Requirement 3(4) - Hv Alighment Sheet 2 1834 kb 14/11/2025
Requirement 3(4) - Hv Alignment Sheet 3 1722 kb 14/11/2025
Requirement 3(4) - Hv Alignment Sheet 4 1724 kb 14/11/2025
Requirement 3(4) - Hv Alignment Sheet 5 1716 kb 14/11/2025
Requirement 3(4) - Hv Alignment Sheet 6 1541 kb 14/11/2025
Consultee Name Date Letter Sent Consultation Expiry Date
- 14/11/2025 -
South Tees Development Company 14/11/2025 -