Location
LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE
REDCAR
TEESSIDE
Proposal
Discharge of Requirement 16 (Construction Environmental Management Plan), Requirement 4 (Landscape and biodiversity protection management and enhancement), Requirement 5 (Public Rights of Way and Land Management), Requirement 6(1) (External lighting (Construction)), Requirement 7(1) (Highway Access)...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
Net Zero Teesside Power Limited
Applicant's Address
C/O AGENT (DWD PROPERTY AND PLANNING LIMITED)
69 CARTER LANE
LONDON
EC4V 6AB
Agent
DWD PROPERTY AND PLANNING LTD
Agent's Address
MR ROBERT BOOTH
69 CARTER LANE
LONDON
EC4V 5EQ
Agent's work phone
Agent's email
Case Officer
Mr A Miller
Case Officer Telephone
01287 612454
Case Officer Email
Adrian.Miller@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
07/11/2025
Date Valid
07/11/2025
Expiry
02/01/2026
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
23/12/2025
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | Requirement 16 (1) “No part of the authorised development may commence, save for the permitted preliminary works, until a construction environmental management plan for that part has been submitted to and, after consultation with the Environment Agency, Sembcorp and STDC, approved by the relevant planning authority. (2) The plan submitted and approved must be in accordance with the framework construction environmental management plan and the indicative landscape and biodiversity strategy and incorporate— (a) a code of construction practice, specifying measures designed to minimise the impacts of construction works; 4 (b) a scheme for the control of any emissions to air; (c) a soil management plan; (d) a sediment control plan; (e) a scheme for environmental monitoring and reporting during the construction of the authorised development, including measures for undertaking any corrective actions; (f) a scheme for the notification of any significant construction impacts on local residents and businesses for handling any complaints received relating to such impacts during the construction of the authorised development; (g) surface and foul water drainage measures that are in accordance with the surface and foul water drainage scheme submitted under requirement 11(1); (h) the measures outlined in paragraphs 15.7.4, 15.8.12 to 15.8.16, 15.8.19 and 15.9.1 in Appendix B: Ornithology in the Environmental Statement Addendum – Volume I of the ES addendum or such other measures to achieve the same maximum noise levels as are set out in paragraphs 15.8.13 to 15.8.16 of Appendix B: Ornithology in the Environmental Statement Addendum – Volume I of the ES addendum; (i) a groundwater monitoring plan that comprises monitoring of groundwater levels and chemical contaminants of concern to inform the construction design process and which must take into account the updated hydrogeological impact assessment and any further ground investigation reports and groundwater monitoring required by requirement 13(2)(f); (j) a materials management plan in accordance with paragraph 5.3.76 of Chapter 5 of the environmental statement; (k) a hazardous materials management plan in accordance with paragraph 10.5.3 in Chapter 10 of the environmental statement; and (l) any other management or mitigation plans set out in the framework construction environmental management plan. (3) All construction works associated with the authorised development must be carried out in accordance with the relevant approved construction environmental management plan unless otherwise agreed with the relevant planning authority. |
| 2 | Requirement 4 Landscape and biodiversity protection management and enhancement (1) No part of the authorised development may commence until a landscape and biodiversity protection plan for that part has been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC). (2) The plan submitted and approved pursuant to sub-paragraph (1) must include details of— (a) measures to protect existing shrub and tree planting that is to be retained; 5 (b) details of any trees and hedgerows to be removed; and (c) biodiversity and habitat mitigation and impact avoidance. (3) The plan submitted and approved pursuant to sub-paragraph (1) must be implemented as approved throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority. (4) The plans submitted and approved pursuant to sub-paragraphs (1) and (4) must be— (a) in accordance with the principles of the indicative landscape and biodiversity strategy; and (b) implemented and maintained as approved during the operation of the relevant part of the authorised development unless otherwise agreed with the relevant planning authority |
| 3 | Requirement 5 ‘Public rights of way and access land management’ states: (1) No public rights of way may be temporarily diverted or stopped up and access to any access land must not be temporarily prevented until a management plan for the relevant section of public rights of way or access land has been submitted to and approved by the relevant planning authority. (2) The plan must include details of— (a) measures to minimise the length of any sections of public rights of way and the area of any access land to be temporarily closed; and (b) advance publicity and signage in respect of any sections of public rights of way to be temporarily closed or diverted and access land to be temporarily closed. (3) The plan must be implemented as approved unless otherwise agreed with the relevant planning authority. |
| 4 | Requirement 6 ‘External lighting’ states: 6(1) No part of the authorised development may commence, save for the permitted preliminary works, until a scheme for all external lighting to be installed during construction for that part (with the exception of the aviation warning lighting required by virtue of requirement 27) has been submitted to and approved by the relevant planning authority. |
| 5 | Requirement 7(1) ‘Highways Access’ states: 7(1) No part of the authorised development may commence, save for the permitted preliminary works, until details of the siting, design and layout (including visibility splays and construction specification) of any new or modified temporary means of access between any 6 part of the Order limits and the public highway to be used by vehicular traffic during construction, and the means of and a programme for reinstating any such means of access after construction has, for that part, been submitted to and, after consultation with the highway authority, Sembcorp and STDC, approved by the relevant planning authority. |
| 6 | Requirement 8(1): 8(1) No part of the authorised development may commence, save for the permitted preliminary works, until details of a programme for the removal of all temporary means of enclosure for any construction areas or sites associated with the authorised development have, for that part, been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC). |
| 7 | Requirement 10 ‘Fire prevention’, states: (1) No part of the authorised development may commence, save for the permitted preliminary works, until a fire prevention method statement providing details of fire detection measures, fire suppression measures and the location of accesses to all fire appliances in all of the major building structures and storage areas within the relevant part of the authorised development, including measures to contain and treat water used to suppress any fire has, for that part, been submitted to and, after consultation with the Health and Safety Executive and the Cleveland Fire Authority, approved by the relevant planning authority. (2) The authorised development must be implemented in accordance with the approved details and all relevant fire prevention, detection and suppression measures, accesses and fire appliances must be maintained to the reasonable satisfaction of the relevant planning authority at all times throughout the operation of the relevant part of the authorised development. |
| 8 | Requirement 11(1) states: (1) No part of the authorised development may commence, save for the permitted preliminary works, until details of the temporary surface and foul water drainage systems, including means of pollution control in accordance with the construction environmental management plan and a management and maintenance plan to ensure that the systems remain fully operational throughout the construction of the relevant part of the authorised development have, for that part, been submitted to, and after consultation with the Environment Agency, the lead local flood authority, the relevant internal drainage board, Sembcorp and STDC, approved by the relevant planning authority. |
| 9 | Requirement 12(1) ‘Flood risk mitigation’ states: 12(1) No part of the authorised development may commence, save for the permitted preliminary works, until a scheme for the mitigation of flood risk during construction, has, for that part, been submitted to, and after consultation with the Environment Agency and STDC, approved by the relevant planning authority. |
| 10 | Requirement 15 ‘Protected species’ states: (1) No part of the authorised development may commence until further survey work for that part has been carried out to establish whether any protected species are present on any of the land affected, or likely to be affected, by that part of the authorised development. (2) Where a protected species is shown to be present, no authorised development of that part must commence until a scheme of protection and mitigation measures has been submitted to and, following consultation with Natural England, approved by the relevant planning authority. (3) The authorised development must be carried out in accordance with the approved scheme unless otherwise agreed with the relevant planning authority. |
| 11 | Requirement 21 ‘Control of noise – construction’ states: (1) No part of the authorised development may commence, save for the permitted preliminary works, until a scheme for the monitoring and control of noise during the construction of that part of the authorised development has been submitted to and approved by the relevant planning authority, following consultation with Sembcorp. (2) The scheme submitted and approved must be in accordance with the principles set out in Chapter 11 of the environmental statement and specify— (a) each location from which noise is to be monitored; (b) the method of noise measurement; (c) the maximum permitted levels of noise at each monitoring location to be determined with reference to the ABC Assessment Method for the different working time periods, as set out in BS 5228-1:2009+A1:2014, unless otherwise agreed in writing with the relevant planning authority for specific construction activities; (d) provision as to the circumstances in which construction activities must cease as a result of a failure to comply with a maximum permitted level of noise; and (e) the noise control measures to be employed. (3) The scheme must be implemented as approved unless otherwise agreed with the relevant planning authority. |
| 12 | Requirement 24 ‘Waste Management – Construction’ states: (1) No part of the authorised development may commence, save for the permitted preliminary works, until a construction site waste management plan for that part has been submitted to and, after consultation with STDC, approved by the relevant planning authority. (2) The plan submitted under sub-paragraph (1) must be in accordance with the framework site waste management plan. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| - | 10/11/2025 | - |
| Cleveland Fire Brigade | 10/11/2025 | - |
| Engineering Team (Highways) | 10/11/2025 | - |
| Engineers (Local Lead Flood Authority) | 10/11/2025 | - |
| Environment Agency | 10/11/2025 | - |
| Environmental Protection Team | 10/11/2025 | - |
| Health and Safety Executive | 10/11/2025 | - |
| Northumbrian Water Ltd | 10/11/2025 | - |
| South Tees Development Company | 10/11/2025 | - |