R/2025/0651/CD

Planning Application Details - Official Consultation has expired.

Location
JUNCTION OF SOTHERBY ROAD AND SKIPPERS LANE AND ALLOTMENTS AT SKIPPERS LANE SOUTH BANK
Proposal
Discharge of conditions 3 (Highway details), 4 (Method of Works Statement), 5 (LLFA1), 6(LLFA2), 7 (LLFA3), 8 (Dust) and 9 (BNG)of planning permission R/2025/0086/FFM for new access spine road via a new roundabout and associated landscaping for further development, including utility diversions
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
Redcar and Cleveland Council
Applicant's Address
Redcar and Cleveland House Kirkletham Street Redcar TS10 1RT
Agent
cohesion consult ltd
Agent's Address
Mr stuart Ainsley Lytchett House Wareham Road Poole Dorset BH16 6FA
Agent's work phone
Agent's email
Case Officer
Mrs C Griffiths
Case Officer Telephone
01287 612629
Case Officer Email
claire.griffiths@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
07/10/2025
Date Valid
09/10/2025
Expiry
04/12/2025
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
05/02/2026
Decision Level
-

Conditions table
# Condition Details
1 Fully detailed drawings illustrating the design and materials of roads, footpaths and other adoptable open spaces shall be submitted to and approved in writing by the Local Planning Authority prior to the start of construction on site, extents of prospective highway should be established and mechanisms for adoption agreed. The development shall be carried out in accordance with the approved details. REASON; To ensure a satisfactory form of development and in the interests of highway safety having regard for Local Plan Policy and sections 9 and 12 of the NPPF.
2 The development hereby approved shall not be commenced until a detailed method of works statement has been submitted to and approved in writing by the Local Planning Authority. Such statement shall include at least the following details; a) Routing of construction traffic, including signage where appropriate; b) Arrangements for site compound and contractor parking; c) Measures to prevent the egress of mud and other detritus onto the public highway; d) A jointly undertaken dilapidation survey of the adjacent highway; e) Program of works; and, f) Details of any road/footpath closures as may be required. The development must be carried out in accordance with the approved details. REASON: To ensure that the development can be carried out in a manner that will not be to the detriment of amenity of local residents, free flow of traffic or safety of highway users having regard for Local Plan policy.
3 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
4 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
5 Prior to the commencement of construction details of a dust mitigation strategy for the construction phase of the development shall be submitted to the Local Planning Authority for approval in writing. The approved strategy shall be implemented in its entirety and maintained throughout the period of construction. REASON: In the interests of neighbour amenity.
6 Development may not be begun unless: a biodiversity gain plan has been submitted to the planning authority; and the planning authority has approved the plan. The biodiversity gain plan must include : - information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat; - the pre-development biodiversity value of the onsite habitat; - the post-development biodiversity value of the onsite habitat; - any registered offsite biodiversity gain allocated to the development and the biodiversity and the biodiversity value of that gain in relation to the development; - any biodiversity credits purchased for the development; and - any such other matters as the Secretary of State may by regulations specify. Reason: To enhance biodiversity in accordance with the National Planning Policy Framework. Reason for pre commencement condition: To ensure the statutorily required Biodiversity Net Gain is achieved and in accordance with paragraph 13 of Schedule 7A of the Town and Country Planning Act 1990 Article 35 of the Town and Country Planning (Development Management Procedure) (England) Order 2015.
7 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form - kb 07/10/2025
Consultee Responses
Consultee response - Environmental Protection (Nuisance) - kb 14/10/2025
Consultee response - Northumbrian Water - kb 21/10/2025
Consultee response - Engineers (Local Lead Flood Authority) - kb 10/12/2025
Consultee response - Engineering Team (Highways) - kb 17/12/2025
Consultee response - LLFA - kb 07/01/2026
Consultee response - (JBA) Engineers (Local Lead Flood Authority) - kb 09/01/2026
Consultee response - Engineering Team (Highways) - kb 29/01/2026
Decision
Compliance Decision Notice - kb 05/02/2026
Officer Report
Compliance Officer Report - kb 05/02/2026
Supporting Documentation
Condition No.3 - Stage 2 Road Safety Audit - kb 07/10/2025
Condition No.3 - General Arrangement - kb 07/10/2025
Condition No.3 - Fencing Arrangement - kb 07/10/2025
Condition No.3 - Typical Cross Sections - kb 07/10/2025
Condition No.3 - Highway Standard Details Sheet 1 of 2 - kb 07/10/2025
Condition No.3 - Highway Standard Details Sheet 2 of 2 - kb 07/10/2025
Condition No.3 - Earthworks Plan - kb 07/10/2025
Condition No.3 - Kerbs and Footways - kb 07/10/2025
Condition No.3 - Road Markings - kb 07/10/2025
Condition No.3 - Alignment Details Sheet 1 of 7 - kb 07/10/2025
Condition No.3 - Alignment Details Sheet 2 of 7 - kb 07/10/2025
Condition No.3 - Alignment Details Sheet 3 of 7 - kb 07/10/2025
Condition No.3 - Alignment Details Sheet 4 of 7 - kb 07/10/2025
Condition No.3 - Alignment Details Sheet 5 of 7 - kb 07/10/2025
Condition No.3 - Alignment Details Sheet 6 of 7 - kb 07/10/2025
Condition No.3 - Alignment Details Sheet 7 of 7 - kb 07/10/2025
Condition No.3 - Pavements Plan - kb 07/10/2025
Condition No.3 - Site Clearance - kb 07/10/2025
Condition No.3 - Traffic Signs Layout - kb 07/10/2025
Condition No.3 - Traffic Signs Schedule - kb 07/10/2025
Condition No.3 - Contour Plan - kb 07/10/2025
Condition No.3 - Soft Landscape General Arrangements and Planting Plan - kb 07/10/2025
Condition No.3 - Swept Paths Analysis Sheet 1 of 2 - kb 07/10/2025
Condition No.3 - Swept Paths Analysis Sheet 2 of 2 - kb 07/10/2025
Condition No.3 - Existing and Proposed Utilities - kb 07/10/2025
Conditions No.5 & 6 - Proposed Drainage Layout - kb 07/10/2025
Conditions No.5 & 6 - Proposed Drainage Longsection - kb 07/10/2025
Conditions No.5 & 6 - Drainage Details Sheet 1 of 2 - kb 07/10/2025
Conditions No.5 & 6 - Drainage Details Sheet 2 of 2 - kb 07/10/2025
Conditions No.5 & 6 - Drainage Schedules - kb 07/10/2025
Condition No.4 - Letter Construction Method Statement - kb 07/10/2025
Condition No.4 - Method Statement - kb 07/10/2025
Condition No.4 - MS001 Construction Programme - kb 07/10/2025
Condition No.4 - MS001 Routing Of Construction Traffic - kb 07/10/2025
Condition No.4 - MS001 Skippers Lane Compound Layout - kb 07/10/2025
Condition No.4 - MS001 Skippers Lane Phasing - kb 07/10/2025
Condition No.4 - MS001 Traffic Management Plans - kb 07/10/2025
Conditions No.5 & 6 - Greenfield Runoff Rate Estimation - kb 07/10/2025
Conditions No.5 & 6 - Proposed Drainage - kb 07/10/2025
Condition No.3 - Management and Maintenance Information Sheet - kb 08/10/2025
Conditions No.5 & 6 - Drainage Flowpaths - kb 07/10/2025
Condition No.8 - Letter Dust Action Plan - kb 07/10/2025
Condition No.8 - Dust Action Plan - kb 07/10/2025
Condition No.9 - Biodiversity Gain Plan - kb 07/10/2025
Condition No.9 - Biodiversity Gain Assessment - kb 07/10/2025
Condition No.9 - Biodiversity Metric Condition Assessments - kb 07/10/2025
Condition No.9 - Ecological Impact Assessment - kb 07/10/2025
Condition No. 6 - Silt Action Plan - kb 15/10/2025
Condition No. 6 - Proposed Drainage Layout - kb 15/10/2025
DRAINAGE FLOW PATHS - kb 23/12/2025
Proposed Drainage - kb 23/12/2025
PROPOSED DRAINAGE LAYO - kb 23/12/2025
DRAINAGE CATCHMENT PL - kb 23/12/2025
Adoption Plan - kb 23/12/2025
Designer’s Response to Stage 2 Road Safety Audit - kb 23/12/2025
Condition No. 3 - Drainage Schedules - kb 29/01/2026
Condition No. 3 - Existing Drainage Longsection - kb 29/01/2026
Condition No. 3 - Drainage Gully Catchment Plan - kb 29/01/2026
Condition No. 3 - General Arrangement - kb 29/01/2026
Condition No. 3 - Adoption Plan - kb 29/01/2026
Condition No. 3 - Fencing Arrangement - kb 29/01/2026
Condition No. 3 - Highway Standard Details (Sheet 1 of 2) - kb 29/01/2026
Condition No. 3 - Highway Standard Details (Sheet 2 of 2) - kb 29/01/2026
Condition No. 3 - Earthworks Plan - kb 29/01/2026
Condition No. 3 - Kerbs and Footways - kb 29/01/2026
Condition No. 3 - Road Markings - kb 29/01/2026
Condition No. 3 - Pavements Plan - kb 29/01/2026
Condition No. 3 - Site Clearance - kb 29/01/2026
Condition No. 3 - Traffic Signs Layout - kb 29/01/2026
Condition No. 3 - Traffic Signs Schedule - kb 29/01/2026
Condition No. 3 - Soft Landscape General Arrangements and Planting Plan - kb 29/01/2026
Condition No. 3 - Swept Path Analysis (Sheet 1 of 2) - kb 29/01/2026
Condition No. 3 - Swept Path Analysis (Sheet 2 of 2) - kb 29/01/2026
Condition No. 3 - Proposed Drainage Layout - kb 29/01/2026
Condition No. 3 - Proposed Drainage Longsection - kb 29/01/2026
Condition No. 3 - Drainage Details (Sheet 1 of 2) - kb 29/01/2026
Condition No. 3 - Drainage Details (Sheet 2 of 2) - kb 29/01/2026
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor I Attwood (SOUTH BANK) 13/10/2025 -
Councillor N Bendelow (SOUTH BANK) 13/10/2025 -
Engineering Team (Highways) 23/12/2025 -
Engineering Team (Highways) 13/10/2025 -
Engineering Team (Highways) 29/01/2026 -
Engineers (Local Lead Flood Authority) 13/10/2025 -
Engineers (Local Lead Flood Authority) 23/12/2025 -
Environmental Protection Team 13/10/2025 -
Northumbrian Water Ltd 13/10/2025 -