R/2025/0610/NM

Planning Application Details - Official Consultation has expired.

Location
NORMANBY HALL NORMANBY HALL PARK NORMANBY MIDDLESBROUGH TS6 0HH
Proposal
Non Material Amendment to planning approval R/2023/0836/FFM to amend the wording of conditions 3, 6, 7, 8, 9 & 10 from "Prior to the commencement of Development" to "Prior to the commencement of Construction to facilitate removal of the permitted trees
Application Type
Non-material amendment
Status
Approved
Parish(es)
Applicant
Eco-Executive Limited
Applicant's Address
C/O Agent Logic Architecture. Logic Architecture Bridge Street Middlesbrough TS21PA
Agent
Eco-Executive Limited
Agent's Address
Mr Tony wattis The Dairy Burton Farm Hartburn Village Stockton on Tees ts18 5dy
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
16/09/2025
Date Valid
17/09/2025
Expiry
15/10/2025
Consultation Expiry
-
associated_bldreg
-
Decision
NON MATERIAL AMENDMENT APPROVE
Decision Date
14/10/2025
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of construction plans showing the existing and proposed ground levels over the site together with finished floor levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan.
2 The construction hereby permitted shall not commence until detailed drawings have been submitted to and approved in writing by the highways authority for the alteration of Coach House Mews, as indicatively shown on the submitted drawing 2268-LAL-00-00-DR-A-00-102 - Proposed Site Plan or such plans which are subsequently submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of providing a safe means of access to the site by all modes of transport and to, minimise disruptions to the free flow of traffic having regard for Local Plan Policy SD4 and sections 9 and 12 of the NPPF.
3 The construction hereby approved hereby approved shall not be commenced until a detailed method of works statement has been submitted to and approved in writing by the Local Planning Authority. Such statement shall include at least the following details; a) Routing of construction traffic, including signage where appropriate; b) Arrangements for site compound and contractor parking; c) Measures to prevent the egress of mud and other detritus onto the public highway; d) A jointly undertaken dilapidation survey of the adjacent highway; e) Program of works; and, f) Details of any road/footpath closures as may be required. The development must be carried out in accordance with the approved details. Reason: To ensure that the development can be carried out in a manner that will not be to the detriment of amenity of local residents, free flow of traffic or safety of highway users having regard for Local Plan Policy.
4 Prior to the commencement of construction, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality.
5 Prior to the commencement of construction, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.
6 Prior to the commencement of construction, parts (a) to (c) found below need to have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until condition (e) has been complied with in relation to that contamination. (a) Site Characterisation An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to: • human health, • property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, • adjoining land, • groundwaters and surface waters, • ecological systems, • archaeological sites and ancient monuments; (iii) an appraisal of remedial options, and proposal of the preferred option(s). This must be conducted in accordance with Environment Agency’s Land Contamination Risk Management Guidance (b) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (c) Implementation of Approved Remediation Scheme The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. (d) Reporting of Unexpected Contamination In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. (e) Long Term Monitoring and Maintenance A monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation over a period of 10 years, and the provision of reports on the same must be prepared, both of which are subject to the approval in writing of the Local Planning Authority. Following completion of the measures identified in that scheme and when the remediation objectives have been achieved, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be produced, and submitted to the Local Planning Authority. This must be conducted in accordance with Environment Agency’s Land Contamination Risk Management Guidance REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 430 kb 16/09/2025
Decision
Decision Notice 154 kb 14/10/2025
Officer Report
Officer Report 213 kb 14/10/2025
Plans
Location Plan 469 kb 16/09/2025
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor C Pugh (NORMANBY) 18/09/2025 -
Councillor P McInnes (NORMANBY) 18/09/2025 -
Councillor P Salvin (NORMANBY) 18/09/2025 -