R/2025/0459/CD

Planning Application Details - Official Consultation has expired.

Location
LAND AT AND IN THE VICINITY OF THE FORMER REDCAR STEEL WORKS SITE REDCAR AND STOCKTON ON TEES TEESSIDE
Proposal
Partial Discharge of Requirement 3(4) (Detailed Design) for works no. 3B (substation works) of reference number EN010103 for The Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and Net Zero pursuant to section 114 ‘Grant or ...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
Net Zero Teesside Power Limited
Applicant's Address
c/o Agent (DWD Ltd) 69 Carter Lane London EC4V 5EQ
Agent
DWD Ltd
Agent's Address
MR ROBERT BOOTH 69 Carter Lane London EC4V 5EQ
Agent's work phone
Agent's email
Case Officer
Mr A Miller
Case Officer Telephone
01287 612454
Case Officer Email
Adrian.Miller@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
09/07/2025
Date Valid
09/07/2025
Expiry
03/09/2025
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
06/08/2025
Decision Level
-

Conditions table
# Condition Details
1 (4) “No part of the authorised development comprised in Work No. 3 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)— (a) the route and method of installation of the 275 kilovolt electrical cables and control system cables running from Work No. 1 to the existing substation at Tod Point; (b) the connections within the existing substation at Tod Point, including electrical cables, connections to the existing busbars and new, upgraded or replacement equipment; and (c) works involving trenchless technologies including their location.”

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 409 kb 09/07/2025
Decision
Compliance Decision Notice 176 kb 06/08/2025
Officer Report
Compliance Officer Report 162 kb 06/08/2025
Supporting Documentation
Requirement 3(4) - Covering Letter 251 kb 09/07/2025
Requirement 3(4) - Plant Layout B2480001 Jac Zz Xx Dr E 0102 Layout2 585 kb 09/07/2025
Requirement 3(4) - Plant Elevation Ns051 El Lay 257 B61 33002 001 1309 kb 09/07/2025
Requirement 3(4) - Work Plan (Work No. 3) 1729 kb 09/07/2025
Consultee Name Date Letter Sent Consultation Expiry Date
- 10/07/2025 -
- 10/07/2025 -