Location
ENSUS UK LTD
WILTON CENTRE
WILTON SITE
LAZENBY
REDCAR
TS10 4RF
Proposal
Discharge of Conditions 3 (CTMP), 4 (LLFA1), 5 (LLFA2), 6 (LLFA3) on planning approval R/2024/0148/FF for Construction of a new animal feed production facility and associated works.
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
Ensus UK Ltd.
Applicant's Address
Wilton Centre, Ensus Uk Ltd Wilton Site
Lazenby
Redcar And Cleveland
TS10 4RG
Agent
Ensus UK Ltd.
Agent's Address
Wilton Centre, Ensus Uk Ltd Wilton Site
Lazenby
Redcar And Cleveland
TS10 4RG
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
08/05/2025
Date Valid
08/05/2025
Expiry
03/07/2025
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
01/07/2025
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | No part of the development herby permitted shall commence until a Construction Traffic Management Plan has been submitted and agreed in writing by the Local Planning Authority (in consultation with National Highways). Construction of the development shall then be carried out in accordance with the agreed Construction Traffic Management Plan. Reason: To mitigate any adverse impact from the development on the A174 & A1053 in accordance with DfT Circular 01/2022. |
| 2 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation. |
| 3 | Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation. |
| 4 | The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 392 kb | 08/05/2025 | |
| Consultee Responses | |||
| Consultee response - Engineers (Local Lead Flood Authority) | 757 kb | 05/06/2025 | |
| Consultee response - Engineers (Local Lead Flood Authority) | 56 kb | 05/06/2025 | |
| Consultee response - Engineering Team (Highways) | 881 kb | 24/06/2025 | |
| Decision | |||
| Compliance Decision Notice | 81 kb | 01/07/2025 | |
| Officer Report | |||
| Compliance Officer Report | 92 kb | 01/07/2025 | |
| Supporting Documentation | |||
| Condition 4, 5 & 6 - LLFA | 13266 kb | 08/05/2025 | |
| Condition 4, 5 & 6 - LLFA | 13549 kb | 08/05/2025 | |
| Condition 3 - CTMP | 520 kb | 08/05/2025 | |
| Condition 3 - CTMP | 562 kb | 08/05/2025 | |
| Condition 3 - CTMP | 1350 kb | 08/05/2025 | |
| Condition 4, 5 & 6 - LLFA | 589 kb | 08/05/2025 | |
| Condition 3 - CTMP | 1454 kb | 08/05/2025 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Councillor C Cawley (DORMANSTOWN) | 08/05/2025 | - |
| Councillor D Powlay (DORMANSTOWN) | 08/05/2025 | - |
| Engineering Team (Highways) | 08/05/2025 | - |
| Engineers (Local Lead Flood Authority) | 08/05/2025 | - |