R/2025/0297/CD

Planning Application Details - Official Consultation has expired.

Location
Land to the north of North Cote Farm and Park Farm Dunsdale
Proposal
Discharge of Conditions 3 (LLFA 1) and 4 (LLFA 2) on planning approval R/2022/0615/FFM for renewable energy generating station comprising ground-mounted photovoltaic solar arrays with primary substation and control building compound; point of connection masts; inverter stations; cabling; access gate...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Guisborough CP
Applicant
Elgin Energy EsCo Ltd
Applicant's Address
1 Ely Place London EC1N 6RY
Agent
RPS
Agent's Address
MR Jordan Campbell Boucher Road Belfast BT12 6RZ
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
30/04/2025
Date Valid
30/04/2025
Expiry
25/06/2025
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
11/06/2025
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
2 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 406 kb 30/04/2025
Consultee Responses
Consultee response - Engineers (Local Lead Flood Authority) 754 kb 05/06/2025
Decision
Decision Notice 456 kb 11/06/2025
Officer Report
Compliance Officer Report 35 kb 11/06/2025
Supporting Documentation
Conditions 3 And 4 - Covering Letter 121 kb 30/04/2025
Conditions 3 and 4 - Construction Environmental Management Plan CEMP 4106 kb 30/04/2025
Conditions 3 and 4 - Technical Note Drainage Appendix D Surface Water Storage Calcs Part 2 7904 kb 30/04/2025
Conditions 3 and 4 - Technical Note Drainage Part 1 6825 kb 30/04/2025
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor B Clarke (GUISBOROUGH) 01/05/2025 -
Councillor B Suthers (GUISBOROUGH) 01/05/2025 -
Councillor L Belshaw (GUISBOROUGH) 01/05/2025 -
Engineers (Local Lead Flood Authority) 01/05/2025 -