R/2025/0229/FFM

Planning Application Details - Official Consultation has expired.

Location
FORMER GUISBOROUGH GENERAL HOSPITAL NORTHGATE GUISBOROUGH TS14 6HZ
Proposal
Change of use and conversion of the former Guisborough Hospital into 34 dwellings with associated parking
Application Type
Major Application
Status
Approved
Parish(es)
Guisborough CP
Applicant
Mr David Walton
Applicant's Address
Overbeck South Stokesley Road Stokesley Guisborough TS14 8DL
Agent
P+HS Architects
Agent's Address
Mr Mark Heron The Old Station Station Road Stokesley Middlesbrough TS9 7AB
Agent's work phone
Agent's email
Case Officer
Mr K Robinson
Case Officer Telephone
01287 612445
Case Officer Email
kevin.robinson@redcar-cleveland.gov.uk
Consultation Start
08/04/2025
Weekly List Expiry Date
-
Date Received
31/03/2025
Date Valid
31/03/2025
Expiry
20/10/2025
Consultation Expiry
09/05/2025
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
20/10/2025
Decision Level
-

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Proposed Site Plan (ref GHC- PHS- XX-XX-DR-A-90002 REV P4) received by the Local Planning Authority on 11.09.2025 Ashwood Building Proposed Floor Plans (ref GHC-PHS-AB-XX-DR-A-20001 Rev P2) received by the Local Planning Authority on 31.03.2025 Ashwood Building Proposed Elevations (ref GHC-PHS-AB-XX-DR-A-21001 Rev P2) received by the Local Planning Authority on 31.03.2025 Ashwood Building Proposed Roof Plan (ref GHC-PHS-AB-XX-DR-A-27000 Rev P1) received by the Local Planning Authority on 31.03.2025 Main Hospital Existing and Proposed Roof Plans (ref GHC-PHS-MH-XX-DR-A-27020 Rev P1) received by the Local Planning Authority on 31.03.2025 Main Hospital Proposed Floor Plans (ref GHC-PHS-MH-XX-DR-A-20021 Rev P1P3) received by the Local Planning Authority on 31.03.2025 Main Hospital Proposed GA Ground Floor Plan Sheet 1 of 2 (ref GHC-PHS-MH-XX-DR-A-20022 Rev P2) received by the Local Planning Authority on 25.06.2025 Main Hospital Proposed GA Ground Floor Plan Sheet 2 of 2 (ref GHC-PHS-MH-XX-DR-A-2002220023 Rev P1P2) received by the Local Planning Authority on 31.03.2025 Main Hospital Proposed GA First Floor Plan (ref GHC-PHS-MH-XX-DR-A-20024 Rev P2) received by the Local Planning Authority on 25.06.2025 Main Hospital Proposed Elevations Sheet 1 of 2 (ref GHC-PHS-MH-XX-DR-A-21022 Rev P4) received by the Local Planning Authority on 08.08.2025 Main Hospital Proposed Elevations Sheet 2 of 2 (ref GHC-PHS-MH-XX-DR-A-21023 Rev P4) received by the Local Planning Authority on 08.08.2025 The Mews Proposed Floor Plans (ref GHC-PHS-TM-XX-DR-A-20041 Rev P3) received by the Local Planning Authority on 25.06.2025 The Mews Proposed GA Ground Floor Plan (ref GHC-PHS-TM-XX-DR-A-20042 Rev P1) received by the Local Planning Authority on 31.03.2025 The Mews Proposed GA First Floor Plan (ref GHC-PHS-TM-XX-DR-A-20043 Rev P2) received by the Local Planning Authority on 08.08.2025 The Mews Proposed Elevations (ref GHC-PHS-TM-XX-DR-A-21041 Rev P4) received by the Local Planning Authority on 08.08.2025 The Mews Existing and Proposed Roof Plan (ref GHC-PHS-TM-XX-DR-A-27040 Rev P1) received by the Local Planning Authority on 31.03.2025 Separating Floor Detailing (ref GHC-PHS-XX-XX-DR-A-22000 Rev P1) received by the Local Planning Authority on 31.03.2025 Strip Section (ref GHC-PHS-XX-XX-DR-A-22001 Rev P2) received by the Local Planning Authority on 25.06.2025 Proposed Bin Store (ref GHC-PHS-XX-XX-DR-A-90003 Rev P2) received by the Local Planning Authority on 31.03.2025 Proposed Cycle Store (ref GHC-PHS-XX-XX-DR-A-90004 Rev P2) received by the Local Planning Authority on 31.03.2025 Proposed Drainage Philosophy (ref 246130BGP 00 00 D C 00130 REV P2) received by the Local Planning Authority on 19.09.2025 Microdrainage Impermeable Areas (ref 246130BGP 00 00 D C 00900 REV P2) received by the Local Planning Authority on 19.09.2025 Flood Exceedance Plan (ref 246130BGP 00 00 D C 00136 REV P2) received by the Local Planning Authority on 19.09.2025 Details Sheet (ref 246130BGP 00 00 D C 00137 REV P1) received by the Local Planning Authority on 19.09.2025 SUDS Management Plan (ref (ref 246130BGP 00 00 D C 00150 REV P1) received by the Local Planning Authority on 19.09.2025 REASON: To accord with the terms of the planning application.
3 The development hereby permitted shall not come into use or be occupied until the highway works detailed below for vehicular accesses to the site has been carried out in accordance with drawings which are subsequently submitted to and approved in writing by the Local Planning Authority. Those drawings should show: a) Formalised dropped vehicle crossing point on to Bolckow Street b) Formalised dropped vehicle crossing on to the junction between Walkers Row and Northgate c) Each dropped crossing arrangement will have a flat channel kerb to demarcate the threshold between highway and the private parking area; d) Each dropped crossing arrangement will have a new bull nose kerb line to run between the carriageway and footway; e) Road lining should be installed as required; And, f) The footways at the point of each dropped vehicle crossing shall be fully reformed to highway design standards, including the removal of any existing radii kerbs or tactile paving arrangements as directed; REASON: In the interests of providing a safe means of access to the site by all modes of transport and to, minimise disruptions to the free flow of traffic having regard for policies DC1 and CS5 of the Local plan and sections 9 and 12 of the NPPF.
4 No part of the development hereby approved shall be occupied until the areas shown on the approved plans ‘GHC-PHS-XX-XX-DR-A-90002 Proposed Site Plan’ and ‘GHC-PHS-XX-XX-DR-A-90004 Proposed Cycle Store’ for cycle storage have been constructed and laid out in accordance with the approved plans, and thereafter such areas shall be retained solely for such purposes. REASON: To ensure a satisfactory form of development and in the interests of highway safety having regard for Local Plan Policy and sections 9 and 12 of the NPPF.
5 The development hereby approved shall not be occupied until the areas for vehicle parking have been constructed and laid out in accordance with the approved drawing ‘GHC-PHS-XX-XX-DR-A-90002 Proposed Site Plan’, or such plans which are subsequently submitted to and approved in writing by the Local Planning Authority, those plans should create parking bays with a width of 2.8m. Such areas shall thereafter be retained in perpetuity for the sole purpose of parking vehicles. REASON: To ensure a satisfactory form of development and in the interests of highway safety having regard for Local Plan Policy and sections 9 and 12 of the NPPF.
6 Openings over the highway No gate/door/window shall be fitted to open outwards over the adjacent public highway. Reason: In the interests of highway safety and to prevent inconvenience and obstruction to other highway users having regard for Local Plan Policy and sections 9 and 12 of the NPPF.
7 Method of Works / Construction Environmental Management Plan Before the development hereby permitted is commenced, a Construction Environmental Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; a) Routing of construction traffic, including signage where appropriate; b) Any temporary access arrangements; c) Arrangements for site compound and contractor parking; d) Loading and unloading of plant and materials; e) Storage of plant and materials used in constructing the development; f) The erection and maintenance of security hoarding including decorative displays; g) Wheel washing facilities; Measures to prevent the egress of mud and other detritus onto the public highway; h) Methods of demolition; i) Measures to control the emission of noise dust and vibration during the construction period; j) A jointly undertaken dilapidation survey of the adjacent highway; k) Program of works; l) Details of any road/footpath closures as may be required, and m) The working hours for all construction activities on this site are limited to between 0800 and 1800 Mondays to Friday and 0800 to 1300 Saturdays and not at all on a Sunday or Public Holiday. The development must be carried out in accordance with the approved details. Reason: To ensure that the development can be carried out in a manner that will not be to the detriment of amenity of local residents, free flow of traffic or safety of highway users having regard for Local Plan policy. Informative Works to Highway - S278 The proposal will require alterations to the existing highway and as such will require an Agreement under Section 278 of the 1980 Highways Act The applicant is urged to consult early with the Highway Authority (tel: 01642 455 600) to discuss these proposals. This agreement must be completed and in place before work commences. Dilapidation Survey Applicants/Developers are reminded that great care should be taken to ensure that no damage to the surface or structure of the public highway is caused. Under the terms of the 1980 Highways Act Redcar & Cleveland Council will seek to recover any expenses incurred in repairing or making good such damage. The applicants are therefore strongly advised to carry out a joint dilapidation survey with the authority prior to and upon completion of, works on site. (01642 455 600) Deliveries to Site It should be ensured that, during construction, deliveries to the site do not obstruct the highway. If deliveries are to be made which may cause an obstruction then early discussion should be had with the Highway Authority on the timing of these deliveries and measures that may be required so as to mitigate the effect of the obstruction to the general public. Cleaning of Highway The applicant is reminded that it is the responsibility of anybody carrying out building work to ensure that mud, debris or other deleterious material is not deposited from the site onto the highway and, if it is, it shall be cleared by that person. In the case of mud being deposited on the highway wheel washing facilities should be installed at the exit of the development.
8 Prior to the commencement of the development hereby approved details of a build programme to include the necessary activities and the sequence in which they should be undertaken, along with a plan for how surface water will be managed during the construction phase shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be implemented in accordance with the approved details. Reason In the interest of safe development o fthe site and to ensure that suitable drainage is provided in accordance with Policy SD4 of the Local Plan.
9 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted did not meet with the local policies and guidance. Following discussions with the applicant / agent a satisfactory scheme has been negotiated.
10 Works to Highway - S278 The proposal will require alterations to the existing highway and as such will require an Agreement under Section 278 of the 1980 Highways Act The applicant is urged to consult early with the Highway Authority (tel: 01642 455 600) to discuss these proposals. This agreement must be completed and in place before work commences. Dilapidation Survey Applicants/Developers are reminded that great care should be taken to ensure that no damage to the surface or structure of the public highway is caused. Under the terms of the 1980 Highways Act Redcar & Cleveland Council will seek to recover any expenses incurred in repairing or making good such damage. The applicants are therefore strongly advised to carry out a joint dilapidation survey with the authority prior to and upon completion of, works on site. (01642 455 600) Deliveries to Site It should be ensured that, during construction, deliveries to the site do not obstruct the highway. If deliveries are to be made which may cause an obstruction then early discussion should be had with the Highway Authority on the timing of these deliveries and measures that may be required so as to mitigate the effect of the obstruction to the general public. Cleaning of Highway The applicant is reminded that it is the responsibility of anybody carrying out building work to ensure that mud, debris or other deleterious material is not deposited from the site onto the highway and, if it is, it shall be cleared by that person. In the case of mud being deposited on the highway wheel washing facilities should be installed at the exit of the development.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form - kb 31/03/2025
Consultee Responses
Consultee response - Councillor Clarke - kb 14/04/2025
Consultee response - Natural England (1) - kb 14/04/2025
Consultee response - Environmental Protection (Contaminated Land) - kb 15/04/2025
Consultee response - Environmental Protection (Nuisance) - kb 15/04/2025
Consultee response - Historic England - kb 23/04/2025
Consultee response - Housing Standards - kb 23/04/2025
Consultee response - Parish/Town Council - kb 24/04/2025
Consultee response - Strategic Planning (Policy) - kb 28/04/2025
Consultee response - Arborist - kb 30/04/2025
Consultee response - Cleveland Police (1) - kb 30/04/2025
Consultee response - Engineers (Local Lead Flood Authority) - kb 19/05/2025
Consultee response - Cleveland Police (2) - kb 26/06/2025
Consultee response - Housing Standards - kb 02/07/2025
Consultee response - Northumbrian Water - kb 03/07/2025
Consultee response - Natural England (2) - kb 07/07/2025
Consultee response - NEAR - kb 08/07/2025
Consultee response - Environmental Protection (Nuisance) - kb 15/07/2025
Consultee response - Environmental Protection (Contaminated Land) - kb 15/07/2025
Consultee response - Parish/Town Council - kb 17/07/2025
Consultee response - Strategic Planning (Conservation) - kb 22/07/2025
Consultee response - Environmental Protection (Nuisance) - kb 13/08/2025
Consultee response - Environmental Protection (Contaminated Land) - kb 13/08/2025
Consultee response - Strategic Planning (Conservation) - kb 13/08/2025
Consultee response - Engineers (Local Lead Flood Authority) - kb 15/08/2025
Consultee response - Natural England (3) - kb 20/08/2025
Consultee response - Cleveland Police (3) - kb 27/08/2025
Consultee response - Parish/Town Council(3) - kb 27/08/2025
Consultee response - Housing - kb 28/08/2025
Consultee response - Northumbrian Water - kb 09/09/2025
Consultee response - Engineering Team (Highways) - kb 11/09/2025
Consultee response - Engineers (Local Lead Flood Authority) - kb 07/10/2025
Decision
Decision Notice - kb 20/10/2025
Location Plan
Location Plan - kb 31/03/2025
Officer Report
Officer Report - kb 20/10/2025
Representations
Neighbour Comments - Hogan S - kb 13/06/2025
Superseded
Flood Exceedance Plan - kb 22/09/2025
Microdrainage Impermeable Areas - kb 31/03/2025
Main Hospital Proposed GA Ground Floor Plan Sheet 1 of 2 - kb 31/03/2025
Main Hospital Proposed GA Ground Floor Plan Sheet 2 of 2 - kb 31/03/2025
Main Hospital Proposed GA First Floor Plan - kb 31/03/2025
The Mews Proposed GA First Floor Plan - kb 31/03/2025
Proposed Site Plan - kb 31/03/2025
Proposed Drainage Philosophy - kb 31/03/2025
The Mews Proposed Elevations - kb 31/03/2025
Main Hospital Proposed Elevations Sheet 2 of 2 - kb 31/03/2025
Main Hospital Proposed Elevations Sheet 1 of 2 - kb 31/03/2025
Proposed Site Plan AS AMENDED - kb 07/05/2025
Main Hospital Proposed GA Ground Floor Plan Sheet 2 of 2 AMENDED - kb 25/06/2025
Main Hospital Proposed Elevations Sheet 1 of 2 AMENDED - kb 25/06/2025
Main Hospital Proposed Elevations Sheet 2 of 2 AMENDED - kb 25/06/2025
Main Hospital Proposed GA Ground Floor Plan Sheet 2 of 2 AMENDED - kb 16/07/2025
Plans
Block 1 Ground Floor Plan - kb 31/03/2025
Block 1 First Floor Plan - kb 31/03/2025
Block 2 Ground Floor Plan - kb 31/03/2025
Block 2 First Floor Plan - kb 31/03/2025
Block 3 Ground Floor Plan - kb 31/03/2025
Block 3 First Floor Plan - kb 31/03/2025
Ashwood Building Existing Floor Plans - kb 31/03/2025
Ashwood Building Proposed Floor Plans - kb 31/03/2025
Ashwood Building Existing And Proposed Roof Plans - kb 31/03/2025
Main Hospital Existing Floor Plans - kb 31/03/2025
Main Hospital Proposed Floor Plans - kb 31/03/2025
Main Building Existing And Proposed Roof Plans - kb 31/03/2025
The Mews Existing Floor Plans - kb 31/03/2025
The Mews Proposed Floor Plans - kb 31/03/2025
The Mews Proposed GA Ground Floor Plan - kb 31/03/2025
The Mews Existing And Proposed Roof Plans - kb 31/03/2025
Separating Floor Detail - kb 31/03/2025
Strip Section - kb 31/03/2025
Existing Site Plan - kb 31/03/2025
Proposed Bin Store - kb 31/03/2025
Proposed Cycle Store - kb 31/03/2025
Ashwood Building Existing Elevations - kb 31/03/2025
Main Hospital Existing Elevations Sheet 1 of 2 - kb 31/03/2025
The Mews Existing Elevations - kb 31/03/2025
Masonry Survey Report Sheet 1 Of 3 - kb 31/03/2025
Main Hospital Existing Elevations Sheet 2 of 2 - kb 31/03/2025
Masonry Survey Report Sheet 3 Of 3 - kb 31/03/2025
Masonry Survey Report Sheet 2 Of 3 - kb 31/03/2025
Ashwood Building Proposed Elevations - kb 31/03/2025
Main Hospital Proposed GA Ground Floor Plan Sheet 1 of 2 AMENDED - kb 25/06/2025
Main Hospital Proposed GA First Floor Plan AMENDED - kb 25/06/2025
The Mews Proposed Floor Plans AMENDED - kb 25/06/2025
Strip Section AMENDED - kb 25/06/2025
The Mews Proposed GA First Floor Plan AMENDED - kb 08/08/2025
The Mews Proposed Elevations AMENDED - kb 08/08/2025
Main Hospital Proposed Elevations Sheet 2 of 2 AMENDED - kb 08/08/2025
Main Hospital Proposed Elevations Sheet 2 of 2 AMENDED - kb 08/08/2025
Main Hospital Proposed Elevations Sheet 1 of 2 AMENDED - kb 08/08/2025
Proposed Site Plan AS AMENDED - kb 11/09/2025
Proposed Drainage Philosophy Amended 19.09.2025 - kb 19/09/2025
Flood Exceedance Plan Amended 19.09.2025 - kb 19/09/2025
Microdrainage Impermeable Areas Amended 19.09.2025 - kb 19/09/2025
SUDS Management Plan - kb 19/09/2025
Supporting Documentation
Survey Report - kb 31/03/2025
Preliminary Ecological Appraisal - kb 31/03/2025
Drainage Philosophy - kb 31/03/2025
Biodiversity Calculations - kb 31/03/2025
Masonry Condition Report - kb 31/03/2025
Heritage Impact Assessment - kb 31/03/2025
Planning Statement - kb 31/03/2025
Statement Of Community Involvement - kb 31/03/2025
Structural Condition Report - kb 31/03/2025
Design And Access Statement - kb 31/03/2025
Phase 1 Desk Study Guisborough Hospital Compressed - kb 31/03/2025
Microdrainage Storm Sewer Design - kb 19/09/2025
SUDS Management Plan - kb 19/09/2025
Response To LLFA Comments - kb 19/09/2025
Application Documents
Details Sheet - kb 19/09/2025
Consultee Name Date Letter Sent Consultation Expiry Date
Aboricultural Officer 08/04/2025 -
Aboricultural Officer 26/06/2025 -
Aboricultural Officer 11/08/2025 -
Asset Management Team Fao Guy Allen 11/08/2025 -
Asset Management Team Fao Guy Allen 26/06/2025 -
Asset Management Team Fao Guy Allen 08/04/2025 -
Business Growth Team 08/04/2025 -
Business Growth Team 26/06/2025 -
Business Growth Team 11/08/2025 -
Cleveland Police ALO - Steve Cranston 26/06/2025 -
Cleveland Police ALO - Steve Cranston 11/08/2025 -
Cleveland Police ALO - Steve Cranston 08/04/2025 -
Councillor B Clarke (GUISBOROUGH) 26/06/2025 -
Councillor B Clarke (GUISBOROUGH) 08/04/2025 -
Councillor B Clarke (GUISBOROUGH) 11/08/2025 -
Councillor B Suthers (GUISBOROUGH) 26/06/2025 -
Councillor B Suthers (GUISBOROUGH) 11/08/2025 -
Councillor B Suthers (GUISBOROUGH) 08/04/2025 -
Councillor L Belshaw (GUISBOROUGH) 08/04/2025 -
Councillor L Belshaw (GUISBOROUGH) 11/08/2025 -
Councillor L Belshaw (GUISBOROUGH) 26/06/2025 -
Engineering Team (Highways) 11/08/2025 -
Engineering Team (Highways) 15/09/2025 -
Engineering Team (Highways) 08/04/2025 -
Engineering Team (Highways) 26/06/2025 -
Engineers (Local Lead Flood Authority) 08/04/2025 -
Engineers (Local Lead Flood Authority) 26/06/2025 -
Engineers (Local Lead Flood Authority) 26/06/2025 -
Engineers (Local Lead Flood Authority) 08/04/2025 -
Engineers (Local Lead Flood Authority) 22/09/2025 -
Engineers (Local Lead Flood Authority) 11/08/2025 -
Environmental Protection Team 11/08/2025 -
Environmental Protection Team 26/06/2025 -
Environmental Protection Team 08/04/2025 -
Environmental Protection Team 26/06/2025 -
Environmental Protection Team 08/04/2025 -
Guisborough Town Council 26/06/2025 -
Guisborough Town Council 08/04/2025 -
Guisborough Town Council 11/08/2025 -
Historic England 11/08/2025 -
Historic England 08/04/2025 -
Historic England 26/06/2025 -
Housing Standards 08/04/2025 -
Housing Standards 26/06/2025 -
Housing Standards 11/08/2025 -
Income and Funding Officer 11/08/2025 -
Income and Funding Officer 08/04/2025 -
Income and Funding Officer 26/06/2025 -
Natural England 26/06/2025 -
Natural England 08/04/2025 -
Natural England 11/08/2025 -
NEAR Ltd (Archaeological Services) 11/08/2025 -
NEAR Ltd (Archaeological Services) 08/04/2025 -
NEAR Ltd (Archaeological Services) 26/06/2025 -
Northumbrian Water Ltd 26/06/2025 -
Northumbrian Water Ltd 08/04/2025 -
Northumbrian Water Ltd 11/08/2025 -
Place Investment Team 11/08/2025 -
Place Investment Team 08/04/2025 -
Place Investment Team 26/06/2025 -
Strategic Planning Team (CA & LB) 26/06/2025 -
Strategic Planning Team (CA & LB) 08/04/2025 -
Strategic Planning Team (CA & LB) 11/08/2025 -
Strategic Planning Team (Policy) 11/08/2025 -
Strategic Planning Team (Policy) 08/04/2025 -
Strategic Planning Team (Policy) 26/06/2025 -
Address Date Sent Date Reconsulted Expiry Date
51A Belmangate, Guisborough, TS14 7AQ. - 11/08/2025 -
106 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
108 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
110 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
112 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
114 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
116 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
118 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
120 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
122 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
124 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
126 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
2 BOLCKOW STREET GUISBOROUGH TS14 6EN 08/04/2025 11/08/2025 01/05/2025
27 HEWITTS BUILDING GUISBOROUGH TS14 6JR 08/04/2025 11/08/2025 01/05/2025
45 AUCKLAND STREET GUISBOROUGH TS14 6HT 08/04/2025 11/08/2025 01/05/2025
47 DE BRUS WAY GUISBOROUGH TS14 6HE 08/04/2025 11/08/2025 01/05/2025
51 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
53 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
59 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
61 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
63 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
65 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
67 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
69 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
71 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
77 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
79 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
81 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
FLAT 1 81 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
FLAT 2 81 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
FLAT 3 81 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
FLAT 4 81 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
GA PAWLETTS 73-75 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
THE BUNGALOW 55 NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
THE COTTAGE NORTHGATE GUISBOROUGH TS14 6JP 08/04/2025 11/08/2025 01/05/2025
33A DE BRUS WAY GUISBOROUGH TS14 6HE 08/04/2025 11/08/2025 01/05/2025
34 DE BRUS WAY GUISBOROUGH TS14 6HE 08/04/2025 11/08/2025 01/05/2025
Site or Press Description Display Date Expiry Date
P LISTED BUILDING SEC 67 11/04/2025 04/05/2025
S LISTED BUILDING SEC 67 15/04/2025 09/05/2025
P ARTICLE 15 11/04/2025 04/05/2025
S ARTICLE 15 15/04/2025 09/05/2025