R/2025/0066/CD

Planning Application Details - Official Consultation has expired.

Location
Land adjacent to Silverdale Gardens Cat Flatt Lane Redcar
Proposal
Discharge of Condition 3 (Construction Management Plan), Condition 4 (Adoptable Roads & Footpaths), Condition 5 (Gas Monitoring), Condition 6 (SW Drainage & Management), Condition 7 (External materials), Condition 8 (Landscape Design), Condition 9 (Hard Landscaping), Condition 10 (Boundary Treatment...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
Taylor Wimpey North Yorkshire
Applicant's Address
Rachel Winckles Taylor Wimpey House Lockheed Court Stockton on Tees TS18 3SH
Agent
Taylor Wimpey North Yorkshire
Agent's Address
Rachel Winckles Taylor Wimpey House Lockheed Court Stockton on Tees TS18 3SH
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
28/01/2025
Date Valid
28/01/2025
Expiry
25/03/2025
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
27/08/2025
Decision Level
-

Conditions table
# Condition Details
1 3) Before the development hereby permitted is commenced, a Construction Environmental Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; a) Routing of construction traffic, including signage where appropriate; b) Any temporary access arrangements; c) Arrangements for site compound and contractor parking; d) Loading and unloading of plant and materials; e) Storage of plant and materials used in constructing the development; f) The erection and maintenance of security hoarding including decorative displays; g) Wheel washing facilities; Measures to prevent the egress of mud and other detritus onto the public highway; h) Methods of demolition; i) Measures to control the emission of noise dust and vibration during the construction period. j) A scheme for recycling/disposing of waste resulting from demolition and construction works. k) A jointly undertaken dilapidation survey of the adjacent highway; l) Program of works; m) Details of any road/footpath closures as may be required, and n) The working hours for all construction activities on this site are limited to between 0800 and 1800 Mondays to Friday and 0800 to 1300 Saturdays and not at all on a Sunday or Public Holiday.
2 4) Before the development hereby permitted is commenced, detailed drawings for the design and materials of roads, footpaths and other adoptable open spaces shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.
3 5) Before the development hereby permitted is commenced, details of the full ground gas monitoring regime (as indicated within the Phase I and Phase II Geo- Environmental Site Assessment) shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.
4 6) Before the development hereby permitted is commenced, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; a) The timetable and phasing for construction of the drainage system; b) Details of any control structure(s); c) Details of surface water storage structures; d) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall be carried out in accordance with the approved Management Plan.
5 7) Before any development, above damp proof course, is commenced, details of the external materials to be used in the development shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.
6 8) Before the occupation of the first dwelling, and notwithstanding the information contained within the submitted landscaping plans, a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The details shall include size, type and species and a programme of work. The development shall be carried out in accordance with the approved details.
7 9) Before the occupation of each individual dwelling, details of hard standing areas for each dwelling shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.
8 10) Before the occupation of each individual dwelling, details of boundary treatment for each dwelling shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.
9 12) Before the development hereby approved is occupied a Management and Maintenance Plan for the surface water drainage scheme shall be submitted to and approved by the Local Planning Authority. The plan shall include details of the following: a) a plan clearly identifying the sections of surface water system that are to be adopted; b) arrangements for the short and long term maintenance of the SuDS elements of the surface water system. The development shall be carried out in accordance with the approved details.
10 15) The development hereby permitted shall not be occupied until the highway works detailed below have been carried out in accordance with plans which have been submitted to and approved in writing by the Local Planning Authority: a) 20mph speed reduction scheme; b) Bus Stop provision on Redcar Road in both directions; and, c) Rearrangement of the proposed point of vehicular access and the associated block paved area.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 410 kb 28/01/2025
Consultee Responses
Consultee response - Councillor Rider 662 kb 03/02/2025
Consultee response - Northumbrian Water 653 kb 11/02/2025
Consultee response - Environmental Protection (Nuisance) 13 kb 19/02/2025
Consultee response - Environmental Protection (Contaminated Land) 18 kb 19/02/2025
Consultee response - Engineers (Local Lead Flood Authority) 662 kb 19/03/2025
Consultee response - Engineering Team (Highways) 883 kb 21/08/2025
Decision
Compliance Decision Notice 97 kb 19/05/2025
Compliance Decision Notice 3, 4 & 15 180 kb 27/08/2025
Officer Report
Compliance Officer Report 152 kb 19/05/2025
Compliance Officer Report 166 kb 27/08/2025
Supporting Documentation
Appendix A Location Plan 424 kb 28/01/2025
Appendix B Planning Layout Rev Ab 1213 kb 28/01/2025
Appendix C Build Route Layout Rev E 1485 kb 28/01/2025
Condition 3 - Construction & Environmental Management Plan (CEMP) 1424 kb 28/01/2025
Condition 4 - Section 38 Agreement 604 kb 28/01/2025
Condition 5 - Phase 2 Geo Environmental Site Assessment Report 5365 kb 28/01/2025
Condition 6 and 12 - Drainage Strategy Report 6138 kb 28/01/2025
Flood Risk Assessment 6504 kb 28/01/2025
Condition 6 and 12 - Surface Water Managemet Plan Part1 6445 kb 28/01/2025
Condition 6 and 12 - Surface Water Managemet Plan Part2 9433 kb 28/01/2025
Condition 6 and 12 - Suds Basin Details T2 2454 kb 28/01/2025
Condition 6 and 12 - Hydrobrake Detail Sheet 1 T2 230 kb 28/01/2025
Condition 6 and 12 - Hydrobrake Detail Sheet 2 T2 233 kb 28/01/2025
Condition 6 and 12 - Engineering Layout Sheet 1 T5 748 kb 28/01/2025
Condition 6 and 12 - Engineering Layout Sheet 2 T5 720 kb 28/01/2025
Condition 6 and 12 - Engineering Layout Sheet 3 T5 618 kb 28/01/2025
Condition 6 and 12 - Drainage Alterations T3 364 kb 28/01/2025
Condition 6 and 12 - Public Drainage Longsections T3 240 kb 28/01/2025
Condition 7 - Materials Layout 829 kb 28/01/2025
Condition 8 - Landscape Design Dlp1 469 kb 28/01/2025
Condition 8 - Landscape Design Dlp2 564 kb 28/01/2025
Condition 8 - Landscape Design Dlp3 536 kb 28/01/2025
Condition 4 and 9 - Surface Finishes And Kerbing Arrangement Sheet 1 T4 1204 kb 28/01/2025
Condition 4 and 9 - Surface Finishes And Kerbing Arrangement Sheet 2 T3 1738 kb 28/01/2025
Condition 4 and 9 - Surface Finishes And Kerbing Arrangement Sheet 3 T3 1518 kb 28/01/2025
Condition 4 and 9 - Surface Treatment Layout Rev A 1791 kb 28/01/2025
Condition 10 - Boundary Treatment Layout Rev F 1139 kb 28/01/2025
Condition 6 and 12 - Section 104 Agreement P1 997 kb 28/01/2025
Condition 6 and 12 - Public Drainage Details T1 644 kb 28/01/2025
Condition 6 and 12 - Private Drainage Details T1 539 kb 28/01/2025
Condition 6 and 12 - Section 185 Agreement Plan P1 996 kb 28/01/2025
Condition 6 and 12 - Proposed Culvert Details T1 309 kb 28/01/2025
Condition 3 - Proposed Construction Access 217 kb 28/01/2025
Condition 3 - CEMP Appendix 3 revised Build Route/Compound layout 1713 kb 08/05/2025
Condition 3 - Build Route Layout Rev j 1713 kb 03/07/2025
Condition 3 - Road Conditions Survey 6018 kb 03/07/2025
Condition 3 - Demolition Plan 266 kb 03/07/2025
Condition 3 - Road Conditions Survey 6018 kb 03/07/2025
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor J Symon (WHEATLANDS) 31/01/2025 -
Councillor N Hargreaves (WHEATLANDS) 31/01/2025 -
Councillor S Crane (LONGBECK) 31/01/2025 -
Councillor Vera Rider (LONGBECK) 31/01/2025 -
Engineering Team (Highways) 31/01/2025 -
Engineers (Local Lead Flood Authority) 31/01/2025 -
Environmental Protection Team 31/01/2025 -
Northumbrian Water Ltd 31/01/2025 -
Public Rights of Way 31/01/2025 -