R/2025/0026/CD

Planning Application Details - Official Consultation has expired.

Location
Land adjacent to South Bank Quay Tees Dock Road Grangetown
Proposal
Discharge of conditions 6(LLFA1), 7(LLFA2) and 8(LLFA3) of planning permission R/2023/0343/FFM for erection of an industrial unit with ancillary office space
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
South Tees Developments Limited
Applicant's Address
C/o Agent
Agent
Lichfields
Agent's Address
Mr Adrian Armstrong St Nicholas Building St Nicholas Street Newcastle upon Tyne NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
15/01/2025
Date Valid
15/01/2025
Expiry
12/03/2025
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
10/02/2025
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
2 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
3 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 405 kb 15/01/2025
Consultee Responses
Consultee response - Engineers (Local Lead Flood Authority) 50 kb 29/01/2025
Decision
Compliance Decision Notice 463 kb 10/02/2025
Officer Report
Officer Report 327 kb 10/02/2025
Supporting Documentation
Conditions No.6, 7 & 8 - Drainage Plan 2 of 2 2830 kb 15/01/2025
Conditions No.6, 7 & 8 - Drainage Area Plan 2949 kb 15/01/2025
Conditions No.6, 7 & 8 - Drainage Management and Maintenance 293 kb 15/01/2025
Conditions No.6, 7 & 8 - Overall Drainage Plan 3061 kb 15/01/2025
Conditions No.6, 7 & 8 - Drainage Plan 1 of 2 2869 kb 15/01/2025
Covering Letter 518 kb 15/01/2025
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor I Attwood (SOUTH BANK) 15/01/2025 -
Councillor N Bendelow (SOUTH BANK) 15/01/2025 -
Engineers (Local Lead Flood Authority) 15/01/2025 -