R/2024/0867/CD

Planning Application Details - Official Consultation has expired.

Location
LAND TO EAST FORMER STEEL HOUSE AND NORTH OF A1085 TRUNK ROAD REDCAR
Proposal
Discharge of conditions 4 (Landscaping), 8 (LLFA1), 14 (Lighting strategy), 16 (Highways) and 17 (Levels) of planning approval R/2022/0816/FFM Formation of Hardstanding, Buildings, Access Roads from A1085 Trunk Road, Associated Facilities and Landscaping Works in association with the creation of a P...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
South Tees Developments Ltd
Applicant's Address
C/o Agent
Agent
Lichfields
Agent's Address
Miss Anna Maw St Nicholas Building St Nicholas' St Newcastle upon Tyne NE1 1TH
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
24/12/2024
Date Valid
24/12/2024
Expiry
29/04/2025
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
29/04/2025
Decision Level
-

Conditions table
# Condition Details
1 Notwithstanding the details illustrated on the illustrative Landscape Plan (Dwg No. STDC_HWY-ATK-LDC-SHPR-DR-CH-000045) received by the Local Planning Authority on 17/02/23, a detailed landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority prior to the development hereby approved becoming operational. The details shall include size, type, species, a programme of works. As part of the submitted details a management plan for the long-term maintenance of the landscaped areas shall be submitted to ensure the development would result in biodiversity net gain. The development shall be completed in accordance with the approved details. REASON: To ensure that the development would respect the site and the surroundings and deliver the bio diversity enhancements at the site in accordance with policy SD4 of the Local Plan.
2 Prior to the commencement of the development (with the exception of any works associated with remediation works and/or any works associated with site set up), or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
3 Prior to the installation of any permanent lighting infrastructure, a Lighting Strategy will be submitted to approved in writing by the Local Planning Authority. Thereafter development will be implemented in accordance with the approved details, unless otherwise agreed in writing. REASON: To ensure the satisfactory implementation of the approved scheme in the interests of the visual amenity of the locality and the appearance of the development.
4 Prior to the commencement of works relating to the proposed access of the A1085, details showing works or alterations to the adopted highway shall be submitted to and approved by the Local Planning Authority. The submission shall include details of the traffic signal phasing that will be included within the design to ensure limited disruption to the cycle crossing arrangements on to A1085. The scheme shall be approved in writing by the Local Planning Authority and completed in accordance with the approved details. REASON: To ensure suitable access to the site in relation to highways safety in accordance with policy SD4 of the Local Plan.
5 Prior to the commencement of the development (with the exception of any works associated with remediation works and/or any works associated with site set up) plans showing the existing and proposed ground levels over the site together with finished site levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form - kb 24/12/2024
Consultee Responses
Consultee response - Environmental Protection (Nuisance) - kb 16/01/2025
Consultee response - Engineers (Local Lead Flood Authority) - kb 28/02/2025
Consultee response - Engineering Team (Highways) - kb 28/04/2025
Decision
Decision Notice - kb 29/04/2025
Officer Report
Officer Report - kb 29/04/2025
Superseded
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Road Markings – 1 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Road Markings – 3 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Road Markings – 2 of 7 - kb 24/12/2024
Condition 16 - Steel House P&R Phase 1 Road Markings Schedules - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Road Pavements Layout – 2 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Traffic Signs – 2 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Traffic Signs – 1 of 7 - kb 24/12/2024
Condition 16 - Steel House P&R Phase 1 Traffic Signs & Bollards Schedules - kb 24/12/2024
Condition 16 - Steel House P&R (Phase 1) Specification Appendices – Series 1200 (HTS) - kb 24/12/2024
Supporting Documentation
Cover Letter - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 & 2 Street Furniture & Landscape Ancillary Details - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 & 2 Street Furniture & Landscape Ancillary Details (Bench: BH1 & BIN: BN1) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 & 2 Landscape Planting Details - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 2 Landscape Planting Schedules - kb 24/12/2024
Condition 4 - Documents Reference Phases 1-3 Typical Details • Detailed Design of Steel House P&R Phase 1 Landscape Planting SchedulesStdc Hwy - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Street Furniture & Landscape Ancillary Details (Bus Shelter: SH2) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Street Furniture & Landscape Ancillary Details (Cycle Shelter: CS2), - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Street Furniture & Landscape Ancillary Details (Bench: BH1 & BIN: BN1), - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Planting Details - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Planting Schedules Sheet 2 of 2 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Planting Schedules Sheet 1 0f 2 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 & 2 Street Furniture & Landscape Ancillary Details (Raised Planter: RP2), - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 & 2 Street Furniture & Landscape Ancillary Details (Raised Planter: RP1), - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Soiling Plan Sheet 16 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Soiling Plan Sheet 15 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Layout Sheet 20 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Soiling Plan Sheet 20 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Soiling Plan Sheet 19 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Soiling Plan Sheet 18 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Soiling Plan Sheet 17 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Layout Sheet 16 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Planting Schedules Sheet 1 0f 2 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 2 Landscape Soiling Plan Sheet 10 of 11 (RBT2) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Layout Sheet 19 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Layout Sheet 18 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 3 Landscape Layout Sheet 17 of 20 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Soiling Plan Sheet 4 of 7 (A1085 TO RBT1) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Soiling Plan Sheet 3 of 7 (A1085 EAST) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Soiling Plan Sheet 2 of 7 (A1085 & Junction) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 2 Landscape Soiling Plan Sheet 9 of 11 (Link2) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 2 Landscape Soiling Plan Sheet 8 of 11 (RBT1 & LINK2) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Soiling Plan Sheet 6 of 7 (A1085 West) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Soiling Plan Sheet 5 of 7 9RBT1) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Soiling Plan Sheet 1 of 7 (A1085 West) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase All Tree Removal and Protection Plan - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Proposals Sheet 4 of 7 (A1085 to RBT1) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Proposals Sheet 3 of 7 9A1085 East), Stdc Hwy Atk Els Shpr Dr Ll 000003 C02 - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Proposals Sheet 2 of 7 (A1085 & Junction), - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Proposals Sheet 1 of 7 (A1085 West) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 2 Landscape Proposals Sheet 10 of 11 (RBT2) - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 2 Landscape Proposals Sheet 9 of 11 (Link2), - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 2 Landscape Proposals Sheet 8 of 11 (RBT1 & LINK2), - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Proposals Sheet 6 of 7 (A1085 West), - kb 24/12/2024
Condition 4 - Detailed Design of Steel House P&R Phase 1 Landscape Proposals Sheet 5 of 7 (RBT1 - kb 24/12/2024
Condition 4 - Steel House P&R (Phase 1&2) Landscape Management & Maintenance Plan - kb 24/12/2024
Condition 4 - Steel House P&R (Phase 3) Landscape Management & Maintenance Plan - kb 24/12/2024
Condition 4 - Steel House P&R (Phase 1&2), Specification Appendices – NBS (Landscape Hardworks) - kb 24/12/2024
Condition 4 - Steel House P&R (Phase 1&2), Specification Appendices – Series 3000 - kb 24/12/2024
Condition 4 - Steel House P&R (Phase 3), Specification Appendices – NBS (Landscape Hardworks) - kb 24/12/2024
Condition 4 - Steel House P&R (Phase 3), Specification Appendices – Series 3000 - kb 24/12/2024
Condition 8 - P&R - DD Phase 3 - MicroDrainage Calculations (PDF output) - kb 24/12/2024
Condition 8 - P&R - DD Phase 2 - MicroDrainage Calculations (PDF output) - kb 24/12/2024
Condition 8 - P&R - DD Phase 1 - MicroDrainage Calculations (PDF output) - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Details Rodding Eyes & Hydrobrake – 2 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Details Storage Tank No.2 – 1 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Water Drainage Standard Details Typical Detention Basin – 9 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Details Permeable Pavement – 9 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Details Filter Drain Detail – 8 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Details LC Sleeve Detail ADJ to Filter Drain – 7 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Details Typical Marshalls Beany – 6 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Details Gully Connections – 5 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Details Type 7 Catchpit – 4 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Surface Water Drainage Standard Water Drainage Standard Details Refurbished Exist. Chamber Cover – 3 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Details Gully Connections – 5 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Details Type 7 Catchpit – 4 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Details Refurbished Exist. Chamber Cover – 3 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Details Rodding Eyes & Hydrobrake - 2 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Details Storage Tank No.1 – 1 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Details Filter Drain Detail – 8 of 9 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Details LC Sleeve Detail ADJ to Filter Drain – 7 of - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 1&2 Surface Water Drainage Standard Details Typical Marshalls Beany – 6 of 9 - kb 24/12/2024
Condition 8 - P&R - DD Phase ALL (1 to 3) - Surface Water Drainage - 1in100 Flood Paths - 1 of 4 (Overview) - kb 24/12/2024
Condition 8 - P&R - DD Phase ALL (1 to 3) - Surface Water Drainage - Catchment Plan - kb 24/12/2024
Condition 8 - P&R - DD Phase ALL (1 to 3) - Surface Water Drainage - 1in100 Flood Paths - 4 of 4 (Insets 3) - kb 24/12/2024
Condition 8 - P&R - DD Phase ALL (1 to 3) - Surface Water Drainage - 1in100 Flood Paths - 3 of 4 (Insets 2) - kb 24/12/2024
Condition 8 -P&R - DD Phase ALL (1 to 3) - Surface Water Drainage - 1in100 Flood Paths - 2 of 4 (Insets 1) - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 General Arrangement - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout Inlet Chamber - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout Block Cable Diagram - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout Single Line Diagram - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout P & ID - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout MCC Kiosk - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout Break Chamber - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Layout Well Well GA - kb 24/12/2024
Condiiton 8 - Detailed Design of Steel House Park & Ride Phase 3 Surface Water Drainage System Pumping Station 2 Site Layout - kb 24/12/2024
Condition 8 - P&R - DD Phase2 - Surface Water Drainage - Layout - 1-250 - Sheet 9 of 11 (Link2 mid) - kb 24/12/2024
Condition 8 - P&R - DD Phase2 - Surface Water Drainage - Layout - 1-250 - Sheet 8 of 11 (RBT1 & Link2 east) - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 7 of 7 (A1085 east) - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 6 of 7 (A1085 west) - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Water Drainage - Layout - 1-250 - Sheet 18 of 20 - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Water Drainage - Layout - 1-250 - Sheet 17 of 20 - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Water Drainage - Layout - 1-250 - Sheet 16 of 20 - kb 24/12/2024
Condition 8 - Detailed Design of Steel House P&R Phase 3 Landscape Layout Sheet 15 of 20 - kb 24/12/2024
Condition 8 - P&R - DD Phase2 - Surface Water Drainage - Layout - 1-250 - Sheet 11 of 11 (TSZ / Outfall) - kb 24/12/2024
Conditon 8 - P&R - DD Phase2 - Surface Water Drainage - Layout - 1-250 - Sheet 10 of 11 (RBT2) - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 1 of 7 (A1085 west) - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 5 of 7 (RBT1) - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 4 of 7 (A1085 to RBT1) - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 3 of 7 (A1085 east) - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 2 of 7 (A1085 & Junction) - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Telemetry Schedule - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - ICA Cable Schedule - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Floatation Calculation - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Water Drainage - Schedule (LCD, DIFF, GU, CH, Pipe) - kb 24/12/2024
Condition 8 - P&R - DD Phase2 - Surface Water Drainage - Schedule (CKD, GU, CH, Pipe) - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Schedule (CKD, GU, CH, Pipe) - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Power Cable Schedule - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Manhole Schedule - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Pipe Schedule - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Emergency Storage Vol Calcs - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Data Sheets - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Pump Calculations - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Load Schedule - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - 500 Specification - Surface Water Drainage - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - Surface Pumping Station No.2 - Technical Specification - kb 24/12/2024
Condition 8 - P&R - DD Phase3 - 500 Specification - Surface Water Drainage - kb 24/12/2024
Condition 8 - P&R - DD Phase2 - 500 Specification - Surface Water Drainage - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - Road Lighting - Standard Details - Sheet 2 of 4 - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - Road Lighting - Standard Details - Sheet 1 of 4 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - Standard Details - Sheet 4 of 4 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - Standard Details - Sheet 3 of 4 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - Standard Details - Sheet 2 of 4 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - Standard Details - Sheet 1 of 4 - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - Road Lighting - Standard Details - Sheet 4 of 4 - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - Road Lighting - Standard Details - Sheet 3 of 4 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - 1-250 - Sheet 15 of 20 - kb 24/12/2024
Condition 14 - P&R - DD Phase1 - Road Lighting Schedule - Sheet 1 of 1 - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - Road Lighting Key & Notes - Sheet 1 of 1 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - 1-250 - Sheet 20 of 20 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - 1-250 - Sheet 19 of 20 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - 1-250 - Sheet 18 of 20 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - 1-250 - Sheet 17 of 20 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting - 1-250 - Sheet 16 of 20 - kb 24/12/2024
Condition 14 - P&R - DD Phase1 - Road Lighting Duct Schedule - Sheet 1 of 1 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting Duct Schedule - Sheet 2 of 2 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting Duct Schedule - Sheet 1 of 2 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting Schedule - Sheet 1 of 1 - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Road Lighting Key & Notes - Sheet 1 of 1 - kb 24/12/2024
Condition 14 - P&R - DD Phase2 - Road Lighting Duct Schedule - Sheet 1 of 1 - kb 24/12/2024
Condition 14 - P&R - DD Phase2 - Road Lighting Schedule - Sheet 1 of 1 - kb 24/12/2024
Condition 14 - P&R - DD Phase ALL - Road Lighting - LUX Level Boundaries - kb 24/12/2024
Condition 14 - Detailed Design of Steel House P&R Phase 1 Road Lighting Schematic – 1 of 2 - kb 24/12/2024
Condition 14 - Detailed Design of Steel House P&R Phase 3 Road Lighting Schematic – 1 of 1 - kb 24/12/2024
Condition 14 - Detailed Design of Steel House P&R Phase 2 Road Lighting Schematic – 1 of 1 - kb 24/12/2024
Condition 14 - Detailed Design of Steel House P&R Phase 1 Road Lighting Schematic – 2 of 2 - kb 24/12/2024
Condition 14 - P&R - DD Phase1 - Lighting Calcs (DetDes) - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Lighting Calcs (DetDes) - kb 24/12/2024
Condition 14 - P&R - DD Phase2 - Lighting Calcs (DetDes) - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - Lighting Designers Narrative - kb 24/12/2024
Condition 14 - P&R - DD Phase ALL (1 to 3) - Road Lighting Passive Safe Risk Assessment - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - Lighting Designers Narrative - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - 500 Specification - Street Lighting - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - 1400 Specification - Street Lighting - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - 1300 Specification - Street Lighting - kb 24/12/2024
Condition 14 - P&R - DD Phase3 - 500 Specification - Street Lighting - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - 1400 Specification - Street Lighting - kb 24/12/2024
Condition 14 - P&R - DD Phase1&2 - 1300 Specification - Street Lighting - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1&2 Fencing, Gates & Bollards Standard Details - 1 of 3, - kb 24/12/2024
Condition 16 - Steel House P&R (Phase 1&2) Specification Appendices – Series 300 (HFE) - kb 24/12/2024
Condition 16 - Steel House P&R Phase 1 Fencing Gates & Bollards Schedules - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Fencing, Gates & Bollards Layout – 6 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Fencing, Gates & Bollards Layout – 3 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Fencing, Gates & Bollards Layout – 2 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Fencing, Gates & Bollards Layout – 1 0f 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1&2 Fencing, Gates & Bollards Standard Details – 2 of 3 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Kerbs, Footways & Paved Areas Insets (1 to 2B) 1 of 9 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1&2 Kerbing & Footways Standard Details – 2 of 2 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1&2 Kerbing & Footways Standard Details – 1 of 2 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Kerbs, Footways & Paved Areas Insets (16 to 19 & 28), - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Kerbs, Footways & Paved Areas Insets (6B TO 15) – 4 of 9 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Kerbs, Footways & Paved Areas Insets (6A) – 3 of 9 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Kerbs, Footways & Paved Areas Insets (3 to 5) – 2 of 9 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Kerbs, Footways & Paved Areas General Layout – 1 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Road Markings – 4 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Kerbs, Footways & Paved Areas General Layout – 3 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Kerbs, Footways & Paved Areas General Layout – 2 of 7 - kb 24/12/2024
Condition 16 - Steel House P&R (Phase 1&2) Specification Appendices – Series 1100 (HKF) - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Pavement Isopachyte & Carriageway Breakout Layout – 3 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Pavement Isopachyte & Carriageway Breakout Layout – 2 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Pavement Isopachyte & Carriageway Breakout Layout – 1 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Road Pavements Layout – 3 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Road Pavements Layout – 1 of 7 - kb 24/12/2024
Condition 16 - Steel House P&R (Phase 1&2) Specification Appendices – Series 1200 (HMK & HSN) - kb 24/12/2024
Condition 16 - Steel House P&R (Phase 1&2) Specification Appendices – Series 700 (HPV - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Pedestrian Guardrail General Layout – 2 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1&2 Pedestrian Guardrail Standard Details – 1 of 1 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Pedestrian Guardrail Insets (8 to 14) – 3 of 3 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Sign Details – 2 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Pedestrian Guardrail Insets (1 to 5) – 1 of 3 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Pedestrian Guardrail General Layout – 3 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Sign Details – 5 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Sign Details – 4 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Sign Details – 3 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Pedestrian Guardrail Insets (6&7) – 2 of 3 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Sign Details – 1 of 5 - kb 24/12/2024
Condition 16 - Steel House P&R (Phase 1&2) Specification Appendices – Series 400 (HRR), - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Traffic Signs – 3 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Equipment Layout – 2 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Equipment Layout - 1 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Overview Layout – 1 of 1 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Traffic Signs – 7 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Traffic Signs – 6 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Proposed Traffic Signs – 4 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Equipment Layout – 3 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Duct and Chamber Schedules – 5 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Ducts and Chambers – 4 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Ducts and Chambers – 3 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Ducts and Chambers – 2 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Ducts and Chambers – 1 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Equipment Schedules – 5 of 5 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Traffic Signals Equipment Layout - 4 of 5 - kb 24/12/2024
Condition 16 - Steel House P&R Phase 1 Foul Drainage Network, Steel House Rising Main Replacement Chamber & Pipe Schedules - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Foul Water Drainage Steel House Rising Main Replacement – 2 of 7 - kb 24/12/2024
Condition 16 - Detailed Design of Steel House P&R Phase 1 Foul Water Drainage Steel House Rising Main Replacement – 1 of 7 - kb 24/12/2024
Condition 16 - Traffic Signal Controller, Work Specification and Configuration Forms - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections A1085 (CH 0 to 110) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections Link 2 (Part) (CH 0 to 60), - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections Roundabout 1 (CH 123) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections Link 1 (CH 150 to 200) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections Link 1 (CH 50 to 140) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections Link 1 to A1085 EB (CH 0 to 229) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections A1085 EB to Link 1 (CH – 101 to 130) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections A1085 (CH 360 to 372) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections A1085 (CH 240 to 350) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections A1085 (CH 120 to 230), - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Cross Sections Link 3 (Part) (CH 0 to 70) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Cross Sections Link 5 (Train Station) (CH 0 to 40) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park and Ride Phase 2 Proposed Cross Sections Link 4 (Steel House) (CH 0 to 40) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Cross Sections Detention Basin (CH 250 to 350) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Cross Sections Roundabout 2 (CH 123) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Cross Sections Link 3 (Part) (CH 340 to 375) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Cross Sections Link 2 (CH 290 to 370) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Cross Sections Link 2 (CH 200 to 280) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Cross Sections Link 2 (CH 110 to 190) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Cross Section Link 2 (CH 0 to 100) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Cross Sections Link 3 (CH 0 to 150) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Cross Sections South Car Park Outer Spine (CH 400 to 525) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Cross Sections South Car Park Outer Spine (CH 240 to 380) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Cross Sections South Car Park Outer Spine (CH 120 to 220) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Cross Sections South Car Park Outer Spine (CH 0 to 100) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Cross Sections Link 3 (CH 280 to 360) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Cross Sections Link 3 (CH 160 to 270) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Long Sections A1085 EB, Link 1, Roundabout 1, Link 2 (Part) & Link 3 (Part) - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Long Sections South Car Park Full Site Sections - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Long Sections North Car Park Full Site Sections - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Long Sections South Car Park Aisles 6-12 - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Long Sections South Car Park Aisles 1-5 - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Long Sections North Car Park Aisles 1-3, 5-6 & 9-12 - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 3 Proposed Long Sections Link 3, Water Meter House, & South Car Park Outer Spine - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 2 Proposed Long Sections Link 2, RBT 2, Link 3, (part) Link 4, Link 5 - kb 24/12/2024
Condition 17 - Detailed Design of Steel House Park & Ride Phase 1 Proposed Long Sections A1085 EB off Free Flow A1085 EB on Free Flow - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 1 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 1 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 1 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 2 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 2 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 1 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 1 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 1 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 1 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 2 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 3 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 3 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 3 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 3 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 3 Existing & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 3 Exiting & Proposed Levels - kb 24/12/2024
Condition 17 - Planning Application for Steel House Park & Ride Phase 2 Existing & Proposed Levels - kb 24/12/2024
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - kb 07/01/2025
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 5 of 7 (RBT1) - kb 07/01/2025
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 4 of 7 (A1085 to RBT1), - kb 07/01/2025
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 3 of 7 (A1085 east), - kb 07/01/2025
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 2 of 7 (A1085 & Junction), - kb 07/01/2025
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 1 of 7 (A1085 west), - kb 07/01/2025
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 4 of 7 (A1085 to RBT1), - kb 07/01/2025
Condition 8 - P&R - DD Phase3 - Surface Water Drainage - Layout - 1-250 - Sheet 17 of 20 - kb 07/01/2025
Condition 8 - P&R - DD Phase3 - Surface Water Drainage - Layout - 1-250 - Sheet 16 of 20 - kb 07/01/2025
Condition 8 - P&R - DD Phase3 - Surface Water Drainage - Layout - 1-250 - Sheet 15 of 20, - kb 07/01/2025
Condition 8 - P&R - DD Phase2 - Surface Water Drainage - Layout - 1-250 - Sheet 11 of 11 (TSZ / Outfall), - kb 07/01/2025
Condition 8 - P&R - DD Phase2 - Surface Water Drainage - Layout - 1-250 - Sheet 10 of 11 (RBT2), - kb 07/01/2025
Condition 8 - P&R - DD Phase2 - Surface Water Drainage - Layout - 1-250 - Sheet 9 of 11 (Link2 mid), - kb 07/01/2025
Condition 8 - P&R - DD Phase2 - Surface Water Drainage - Layout - 1-250 - Sheet 8 of 11 (RBT1 & Link2 east), - kb 07/01/2025
Condition 8 - P&R - DD Phase1 - Surface Water Drainage - Layout - 1-250 - Sheet 7 of 7 (A1085 east), - kb 07/01/2025
Condition 14 - P&R - DD Phase1 - Road Lighting - 1-250 - Sheet 6 of 7 (A1085 west), - kb 08/01/2025
Condition 14 - P&R - DD Phase1 - Road Lighting - 1-250 - Sheet 5 of 7 (RBT1), - kb 08/01/2025
Condition 14 - P&R - DD Phase1 - Road Lighting - 1-250 - Sheet 4 of 7 (A1085 to RBT1), - kb 08/01/2025
Condition 14 - P&R - DD Phase1 - Road Lighting - 1-250 - Sheet 3 of 7 (A1085 east) - kb 08/01/2025
Condition 14 - P&R - DD Phase1 - Road Lighting - 1-250 - Sheet 2 of 7 (A1085 & Junction), - kb 08/01/2025
Condition 14 - P&R - DD Phase1 - Road Lighting - 1-250 - Sheet 1 of 7 (A1085 west), - kb 08/01/2025
Condition 14 - P&R - DD Phase1 - Road Lighting - 1-250 - Sheet 7 of 7 (A1085 east), - kb 08/01/2025
Condition 14 - P&R - DD Phase2 - Road Lighting - 1-250 - Sheet 9 of 11 - kb 08/01/2025
Condition 14 - P&R - DD Phase2 - Road Lighting - 1-250 - Sheet 8 of 11 - kb 08/01/2025
Condition 14 - P&R - DD Phase1 - Road Lighting - 1-250 - Sheet 7 of 7 (A1085 east), - kb 08/01/2025
Condition 16 - P&R - DD Phase1 - Road Pavements - Layout - 1-250 - Sheet 2 of 7 (A1085 & Junction)nt Layouts - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Road Pavements - PSV & AAV - 1-500 (Sheet 1 of 2) - kb 26/03/2025
Condition 16 - P&R - DD Phase1&2 - 700 Specification - Road Pavements - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Traffic Signs - Detail Schedule - Sheet 4 of 5 - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Proposed Traffic Signs - 1-250 - Sheet 1 of 7 (A1085 west) - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Proposed Traffic Signs - 1-250 - Sheet 2 of 7 (A1085 & Junction) - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Traffic Signs & Bollards Schedule - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Proposed Road Marking - 1-250 - Sheet 1 of 7 (A1085 west) - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Proposed Road Marking - 1-250 - Sheet 2 of 7 (A1085 & Junction) - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Proposed Road Marking - 1-250 - Sheet 3 of 7 (A1085 east) - kb 26/03/2025
Condition 16 - P&R - DD Phase1 - Road Markings – Schedule - kb 26/03/2025
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor C Cawley (DORMANSTOWN) 08/01/2025 -
Councillor D Powlay (DORMANSTOWN) 08/01/2025 -
Councillor I Attwood (SOUTH BANK) 08/01/2025 -
Councillor N Bendelow (SOUTH BANK) 08/01/2025 -
Engineering Team (Highways) 26/03/2025 -
Engineering Team (Highways) 08/01/2025 -
Engineers (Local Lead Flood Authority) 08/01/2025 -
Environmental Protection Team 08/01/2025 -