R/2024/0859/FF

Planning Application Details - Official Consultation has expired.

Location
Land at Lackenby Works Teesworks Site
Proposal
Installation of concrete batching plant facility, associated infrastructure and boundary treatments
Application Type
Full
Status
Approved
Parish(es)
Applicant
Ashcourt Concrete Ltd
Applicant's Address
Mr Chris Yeadon Ashcourt Group Foster Street Hull England HU8 8BT
Agent
Lichfields
Agent's Address
Mr Tom Hutchinson 3rd Floor St Nicholas Building St Nicholas Street Newcastle upon Tyne NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
29/01/2025
Weekly List Expiry Date
-
Date Received
23/12/2024
Date Valid
08/01/2025
Expiry
17/03/2025
Consultation Expiry
12/03/2025
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
17/03/2025
Decision Level
-

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan (Dwg No. 1969 Tee Sd 01.01 A) received by the Local Planning Authority on 23/12/24 Proposed Site Plan (Dwg No. 1969 Tee Sd 10.01 F) received by the Local Planning Authority on 08/01/25 Proposed Site Layout (Dwg No. 1969 Tee Sd 10.02 F) received by the Local Planning Authority on 08/01/25 Welfare Cabin Proposed Plans and Elevations (Dwg No. 1969 Tee Sd 30.02 A) received by the Local Planning Authority on 23/12/24 Proposed Sections (Dwg No. 1969 Tee Sd 40.01 D) received by the Local Planning Authority on 23/12/24 Security Gate and Fence Elevations (Dwg No. 1969 Tee Sd 30.03) received by the Local Planning Authority on 08/01/25 REASON: To accord with the terms of the planning application.
3 No development shall take place until a Construction Environmental Management Plan (CEMP) for the development has been submitted to and approved in writing by the Local Planning Authority. The approved CEMP shall be adhered to throughout the construction period. The CEMP shall set out and include the following details: i The method to be used to control the emission of dust, noise and vibration from construction works, including any details of any mitigation measures required; ii Measures to control the deposit of mud and debris on adjoining public highways iii Site fencing and security iv Temporary contractors’ buildings, plant, storage of materials, lighting and parking for site operatives v The use of temporary generators vi The arrangement or turning of vehicles within the site so that they may enter and leave in forward gear vii A risk assessment of construction activities with potentially damaging effects on local ecological receptors including any measures to protect those receptors during construction viii Roles and responsibilities for the implementation of the CEMP requirements and measures. REASON: In the interest of neighbour amenity, highways safety and protection of sites of ecological value in accordance with policies SD4 and N4 of the Redcar and Cleveland Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to construction details which are often the first works on site and relate to site preparation.
4 In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken, and where remediation is necessary a remediation scheme must be prepared which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. Following completion of the development a report must be submitted confirming that unexpected contamination was not encountered during the development. Reason : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors
5 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 595 kb 23/12/2024
Consultee Responses
Consultee response - Health & Safety Executive (PADHI+) 231 kb 09/01/2025
Consultee Response - Health & Safety Team 47 kb 10/01/2025
Consultee response - Environmental Protection (Contaminated Land) 22 kb 30/01/2025
Consultee response - Environmental Protection (Nuisance) 13 kb 30/01/2025
Consultee response - Natural England 246 kb 07/02/2025
Consultee response - Network Rail 880 kb 04/03/2025
Decision
Decision Notice 422 kb 17/03/2025
Location Plan
Site Location Plan 2985 kb 23/12/2024
Representations
Neighbour Comments - British Steel 1004 kb 12/03/2025
Plans
Welfare Cabin Proposed Plans And Elevations 173 kb 23/12/2024
Proposed Sections 284 kb 23/12/2024
Existing Site Plan 992 kb 23/12/2024
MCS50 Loadings Elevation (Not to scale) 603 kb 06/01/2025
Concrete Plant Elevation And Layout Drawings 22.07.2024 364 kb 06/01/2025
MCR-5x40TAB Transport Elevations (Not to Scale) 158 kb 06/01/2025
MCM60 Loadings Elevations (Not to scale) 276 kb 06/01/2025
MCM60 Opperating Elevations (Not to Scale) 6085 kb 06/01/2025
Proposed Site Layout 1026 kb 08/01/2025
Proposed Site Plan 1488 kb 08/01/2025
Security Gate And Fence Elevations 5439 kb 08/01/2025
Supporting Documentation
Preliminary Land Quality Risk Assessment 7434 kb 23/12/2024
Transport Assessment 7699 kb 23/12/2024
Biodiversity Net Gain Assessment Ecological Report INCA 1898 kb 02/01/2025
Planning Covering Letter Including Design and Access Statement 819 kb 02/01/2025
Shadow Habitats Regulations Assessment: Stage 1 Screening 398 kb 30/01/2025
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor I Attwood (SOUTH BANK) 09/01/2025 -
Councillor N Bendelow (SOUTH BANK) 09/01/2025 -
Engineering Team (Highways) 09/01/2025 -
Environmental Protection Team 09/01/2025 -
Health & Safety-Food (Food Team) 09/01/2025 -
Health and Safety Executive 09/01/2025 -
Natural England 31/01/2025 -
Natural England 09/01/2025 -
Network Rail 09/01/2025 -
South Tees Development Company 09/01/2025 -
Address Date Sent Date Reconsulted Expiry Date
ADMINISTRATION BUILDING BRIGG ROAD SCUNTHORPE NORTH LINCOLNSHIRE DN16 1XA 19/02/2025 - 12/03/2025
Site or Press Description Display Date Expiry Date
S SITE NOTICE ONLY 29/01/2025 19/02/2025