R/2024/0271/ESM

Planning Application Details - Official Consultation has expired.

Location
Land at the Foundry Site (Foundry Central), Teesworks, other land at Teesworks and land in the vicinity of and at Wilton International site and Lackenby
Proposal
Construction of an electrolytic low carbon hydrogen production facility, hydrogen export pipeline network, electricity and water connections, including water supply and effluent discharge, above ground installations, construction and laydown areas, and ancillary development
Application Type
Env Statement Major
Status
Withdrawn
Parish(es)
Applicant
BP Alternative Energy Investments
Applicant's Address
Anna-Maria Sexton Chertsey Road Sunbury-on-Thames Surrey TW167BP
Agent
DWD
Agent's Address
Mr Geoff Bullock 69 Carter Lane London EC4V 5EQ
Agent's work phone
Agent's email
Case Officer
Mr A Miller
Case Officer Telephone
01287 612454
Case Officer Email
Adrian.Miller@redcar-cleveland.gov.uk
Consultation Start
24/04/2024
Weekly List Expiry Date
-
Date Received
22/04/2024
Date Valid
22/04/2024
Expiry
26/09/2025
Consultation Expiry
31/05/2024
associated_bldreg
-
Decision
WITHDRAWN
Decision Date
19/09/2025
Decision Level
-

No Conditions Found For This Application

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form - kb 22/04/2024
Covering Letter - kb 22/04/2024
Application Form - CIL Form - kb 22/04/2024
Consultee Responses
Consultee response - Sabic Pipeline Operator (TPEP) - kb 25/04/2024
Consultee response - Northern Gas Network Map 1 - kb 30/04/2024
Consultee response - Northern Gas Network Map 2 - kb 30/04/2024
Consultee response - Northern Gas Network Map 3 - kb 30/04/2024
Consultee response - Northern Gas Network Map 4 - kb 30/04/2024
Consultee response - Northern Gas Network Map 5 - kb 30/04/2024
Consultee response - Northern Gas Network Map 6 - kb 30/04/2024
Consultee response - Strategic Planning (Policy) - kb 08/05/2024
Consultee response - Environmental Protection (Contaminated Land) - kb 13/05/2024
Consultee response - Health & Safety Executive LUP team - kb 15/05/2024
Consultee response - Environmental Protection (Nuisance) - kb 16/05/2024
Consultee response - Cleveland Police - kb 17/05/2024
Consultee Response - North East Archaeological Research Limited - kb 21/05/2024
Consultee response - Wood Group CATS Pipeline - kb 22/05/2024
Consultee response - Northumbrian Water - kb 22/05/2024
Consultee response - National Highways - kb 24/05/2024
Consultee response - Natural England - kb 28/05/2024
Consultee response - Environment Agency - kb 31/05/2024
Consultee Response - Network Rail - kb 14/06/2024
Consultee response - Engineers (Local Lead Flood Authority) - kb 17/09/2024
Consultee response - Natural England - kb 18/11/2024
Consultee response - Engineering Team (Highways) - kb 16/12/2024
Consultee response - Natural England - kb 19/12/2024
Consultee response - Natural England - kb 01/05/2025
Location Plan
Location Plan (Sheet 1 of 23) - kb 23/04/2024
Location Plan Page 4 of 23 - kb 23/04/2024
Location Plan Page 5 of 23 - kb 23/04/2024
Location Plan Page 6 of 23 - kb 23/04/2024
Location Plan Page 7 of 23 - kb 23/04/2024
Location Plan Page 8 of 23 - kb 23/04/2024
Location Plan Page 9 of 23 - kb 23/04/2024
Location Plan Page 10 of 23 - kb 23/04/2024
Location Plan Page 11 of 23 - kb 23/04/2024
Location Plan Page 12 of 23 - kb 23/04/2024
Location Plan Page 13 of 23 - kb 23/04/2024
Location Plan Page 14 of 23 - kb 23/04/2024
Location Plan Page 15 of 23 - kb 23/04/2024
Location Plan Page 16 of 23 - kb 23/04/2024
Location Plan Page 17 of 23 - kb 23/04/2024
Location Plan Page 18 of 23 - kb 23/04/2024
Location Plan Page 19 of 23 - kb 23/04/2024
Location Plan Page 20 of 23 - kb 23/04/2024
Location Plan Page 21 of 23 - kb 23/04/2024
Location Plan Page 22 of 23 - kb 23/04/2024
Location Plan Page 23 of 23 - kb 23/04/2024
Location Plan Page 2 of 23 - kb 23/04/2024
Location Plan Page 3 of 23 - kb 23/04/2024
Representations
Neighbour Comments - INEOS UK SNS Limited - kb 24/04/2024
Neighbour Comments - Lichfields on Behalf of Anglo American - kb 08/05/2024
Neighbour Comments - British Steel - kb 09/05/2024
Neighbour Comments - Mishcon de Reya LLP on behalf of Redcar Bulk Terminal - kb 09/05/2024
Neighbour Comments - Cartman B - kb 31/05/2024
Superseded
Environmental Statement Appendix 11 A Baseline Appendix Ornithology Redacted Optimized - kb 22/04/2024
Plans
Plan View And Isometric View - kb 22/04/2024
Pipelines And Infrastructure Drawing Overall Layout - kb 22/04/2024
Connection Cable Routing - kb 22/04/2024
Overall Foundation Layout - kb 22/04/2024
Plot Plan For Hygreen At Foundry - kb 22/04/2024
Plot Plan Layout For Hygreen At Foundry - kb 22/04/2024
AGI General Arrangment Plant End Of Line Sheet 1 - kb 22/04/2024
Access Plan For Hygreen - kb 22/04/2024
Access South - kb 22/04/2024
Access North - kb 22/04/2024
Figure 1 Outline Landscape And Management Plan - kb 22/04/2024
Drainage Layout - kb 22/04/2024
Elevation And Section Views Sections A And B - kb 22/04/2024
Elevation And Section Views Looking South And West - kb 22/04/2024
Elevation And Section Views Looking North And East - kb 22/04/2024
Construction Area Yard Layout 1 of 5 - kb 22/04/2024
Construction Area Yard Layout 2 of 5 - kb 22/04/2024
Construction Area Yard Layout 3 of 5 - kb 22/04/2024
Construction Area Yard Layout 4 of 5 - kb 22/04/2024
Construction Area Yard Layout 5 of 5 - kb 22/04/2024
Typical Construction Right of Way Buried Open Cut Sheet 1 of 3 - kb 22/04/2024
Typical Construction Right of Way above ground pipe corridor Sheet 2 of 3 - kb 22/04/2024
Typical Construction Right of Way Pipe Racking and Pipe Bridges Sheet 3 of 3 - kb 22/04/2024
AGI General Arrangement NGN End of Line Sheet 2 - kb 22/04/2024
Pipelines and Infrastructure Plant Approach 1 of 5 - kb 22/04/2024
Pipelines and Infrastructure Plant Approach 2 of 5 - kb 22/04/2024
Pipelines and Infrastructure Plant Approach 3 of 5 - kb 22/04/2024
Pipelines and Infrastructure Plant Approach 4 of 5 - kb 22/04/2024
Pipelines and Infrastructure Plant Approach 5 of 5 - kb 22/04/2024
Pipelines and Infrastructure Overall AGI Layout Sheet 1 of 4 - kb 22/04/2024
Pipelines and Infrastructure Overall AGI Layout Sheet 2 of 4 - kb 22/04/2024
Pipelines and Infrastructure Overall AGI Layout Sheet 3 of 4 - kb 22/04/2024
Pipelines and Infrastructure Overall AGI Layout Sheet 4 of 4 - kb 22/04/2024
Figure 1 Planning Application Site Boundary Sheet 3 of 8 - kb 22/04/2024
Figure 1 Planning Application Site Boundary Sheet 2 of 8 - kb 22/04/2024
Figure 1 Planning Application Site Boundary Sheet 1 of 8 - kb 22/04/2024
Figure 1 Planning Application Site Boundary Sheet 8 of 8 - kb 22/04/2024
Figure 1 Planning Application Site Boundary Sheet 7 of 8 - kb 22/04/2024
Figure 1 Planning Application Site Boundary Sheet 6 of 8 - kb 22/04/2024
Figure 1 Planning Application Site Boundary Sheet 5 of 8 - kb 22/04/2024
Figure 1 Planning Application Site Boundary Sheet 4 of 8 - kb 22/04/2024
Supporting Documentation
Environmental Statement Report - Chapter 1 Introduction Final - kb 22/04/2024
Environmental Statement Report - Chapter 11 Ornithology Redacted - kb 22/04/2024
Environmental Statement Report - Chapter 7 Planning Policy Context Final - kb 22/04/2024
Environmental Statement Report - Chapter 8 Water Environment Final - kb 22/04/2024
Environmental Statement Report - Chapter 9 Geology Final - kb 22/04/2024
Environmental Statement Report - Chapter 10 Ecology And Nature Conservation Final - kb 22/04/2024
Environmental Statement Report - Chapter 2 Assessment Methodology Final - kb 22/04/2024
Environmental Statement Report - Chapter 3 Description Of The Existing Environment Final - kb 22/04/2024
Environmental Statement Report - Chapter 4 Proposed Development Final - kb 22/04/2024
Environmental Statement Report - Chapter 5 Construction Final - kb 22/04/2024
Environmental Statement Report - Chapter 6 Alternatives And Design Evolution Final - kb 22/04/2024
Environmental Statement Report - Chapter 17 Socio Economics And Land Use Final - kb 22/04/2024
Environmental Statement Report - Chapter 18 Major Accidents And Disasters Final - kb 22/04/2024
Environmental Statement Report - Chapter 19 Materials And Waste Final - kb 22/04/2024
Environmental Statement Report - Chapter 20 Human Health Final - kb 22/04/2024
Environmental Statement Report - Chapter 21 Climate Change Final - kb 22/04/2024
Environmental Statement Report - Chapter 23 Summary Of Significant Effects Final - kb 22/04/2024
Environmental Statement Report - Chapter 12 Landscape And Visual Amenity Final - kb 22/04/2024
Environmental Statement Report - Chapter 13 Cultural Heritage Final - kb 22/04/2024
Environmental Statement Report - Chapter 14 Traffic And Transportation Final - kb 22/04/2024
Environmental Statement Report - Chapter 15 Air Quality Final - kb 22/04/2024
Environmental Statement Report - Chapter 16 Noise And Vibration Final - kb 22/04/2024
Environmental Statement Figure 1 1 The Proposed Development Site - kb 22/04/2024
Environmental Statement Figure 3 1 Areas Of The Proposed Development Site - kb 22/04/2024
Environmental Statement Figure 4 2 Electricity Connection Corridor - kb 22/04/2024
Environmental Statement Figure 4 3 Water Connection Corridor - kb 22/04/2024
Environmental Statement Figure 4 5 Water Process Schematic - kb 22/04/2024
Environmental Statement Figure 4 6 Indicative Plot Layout (main Site) - kb 22/04/2024
Environmental Statement Figure 4 1 Hydrogen Export Pipeline Corridor - kb 22/04/2024
Environmental Statement Figure 5 2 Indicative Pipeline Routings And Construction Methodologies - kb 22/04/2024
Environmental Statement Figure 5 1 Construction Compound And Laydown Areas - kb 22/04/2024
Environmental Statement Figure 8 2 Groundwater Features And Their Attributes - kb 22/04/2024
Environmental Statement Figure 8 3 Fluvial Flood Risk - kb 22/04/2024
Environmental Statement Figure 8 4 Surface Water Flood Risk - kb 22/04/2024
Environmental Statement Figure 8 1 Surface Water Features And Their Attributes - kb 22/04/2024
Environmental Statement Figure 9 16 Groundwater Abstraction - kb 22/04/2024
Environmental Statement Figure 9 17 Surface Water Abstraction - kb 22/04/2024
Environmental Statement Figure 9 18a Natural Ground Subsidence Collapsible Deposits - kb 22/04/2024
Environmental Statement Figure 9 18b Natural Ground Subsidence Compressible Deposits - kb 22/04/2024
Environmental Statement Figure 9 18c Natural Ground Subsidence Ground Dissolution Of Soluble Rocks - kb 22/04/2024
Environmental Statement Figure 9 18d Natural Ground Subsidence Landslides - kb 22/04/2024
Environmental Statement Figure 9 18e Natural Ground Subsidence Running Sand - kb 22/04/2024
Environmental Statement Figure 9 18f Natural Ground Subsidence Shrink Swell Clays - kb 22/04/2024
Environmental Statement Figure 9 19a Agricultural Land Classification Main Site - kb 22/04/2024
Environmental Statement Figure 9 19b Agricultural Land Classification Water And Wastewater Connection Works - kb 22/04/2024
Environmental Statement Figure 9 19c Agricultural Land Classification Electrical Connection Works - kb 22/04/2024
Environmental Statement Figure 9 19d Agricultural Land Classification Hydrogen Distribution Network - kb 22/04/2024
Environmental Statement Figure 9 20 Brit Pits - kb 22/04/2024
Environmental Statement Figure 9 21 Non Coal Minings - kb 22/04/2024
Environmental Statement Figure 9 22 Surface Ground Workings - kb 22/04/2024
Environmental Statement Figure 9 23 Underground Workings - kb 22/04/2024
Environmental Statement Figure 9 11 Discharge Consents - kb 22/04/2024
Environmental Statement Figure 9 12a Superficial Aquifers Main Site - kb 22/04/2024
Environmental Statement Figure 9 12b Superficial Aquifers Water And Wastewater Connection Works - kb 22/04/2024
Environmental Statement Figure 9 12c Superficial Aquifers Electrical Connection Works - kb 22/04/2024
Environmental Statement Figure 9 12d Superficial Aquifers Hydrogen Distribution Network - kb 22/04/2024
Environmental Statement Figure 9 13a Bedrock Aquifers Main Site - kb 22/04/2024
Environmental Statement Figure 9 13b Bedrock Aquifers Water And Wastewater Connection Works - kb 22/04/2024
Environmental Statement Figure 9 13c Bedrock Aquifers Electrical Connection Works - kb 22/04/2024
Environmental Statement Figure 9 13d Bedrock Aquifers Hydrogen Distribution Network - kb 22/04/2024
Environmental Statement Figure 9 14a Groundwater Vulnerability Main Site - kb 22/04/2024
Environmental Statement Figure 9 14b Groundwater Vulnerability Water And Wastewater Connection Works - kb 22/04/2024
Environmental Statement Figure 9 14c Groundwater Vulnerability Electrical Connection Works - kb 22/04/2024
Environmental Statement Figure 9 14d Groundwater Vulnerability Hydrogen Distribution Network - kb 22/04/2024
Environmental Statement Figure 9 15 Groundwater Source Protection Zones - kb 22/04/2024
Environmental Statement Figure 9 5 Faults And Linear Features - kb 22/04/2024
Environmental StatementFigure 9 6 Waste And Landfills - kb 22/04/2024
Environmental Statement Figure 9 7 Hazardous Sites - kb 22/04/2024
Environmental Statement Figure 9 8a Historical Industrial Landuses - kb 22/04/2024
Environmental Statement Figure 9 8b Historical Industrial Landuses - kb 22/04/2024
Environmental Statement Figure 9 8c Historical Industrial Landuses - kb 22/04/2024
Environmental Statement Figure 9 8d Historical Industrial Landuses - kb 22/04/2024
Environmental Statement Figure 9 8e Historical Industrial Landuses - kb 22/04/2024
Environmental Statement Figure 9 9 Historical Tanks - kb 22/04/2024
Environmental Statement Figure 9 10a Ecological Designations Main Site - kb 22/04/2024
Environmental Statement Figure 9 10b Ecological Designations Water And Wastewater Connection Works - kb 22/04/2024
Environmental Statement Figure 9 10c Ecological Designations Electrical Connection Works - kb 22/04/2024
Environmental Statement Figure 9 10d Ecological Designations Hydrogen Distribution Network - kb 22/04/2024
Environmental Statement Figure 9 2d Superficial Geology Hydrogen Distribution Network - kb 22/04/2024
Environmental Statement Figure 9 3a Bedrock Geology Main Site - kb 22/04/2024
Environmental Statement Figure 9 3b Bedrock Geology Water And Wastewater Connection Works - kb 22/04/2024
Environmental Statement Figure 9 3c Bedrock Geology Electrical Connection Works - kb 22/04/2024
Environmental Statement Figure 9 3d Bedrock Geology Hydrogen Distribution Network - kb 22/04/2024
Environmental Statement Figure 9 4 Bgs Boreholes - kb 22/04/2024
Environmental Statement Figure 9 1a Artificial Geology Main Site - kb 22/04/2024
Environmental Statement Figure 9 1b Artificial Geology Water And Wastewater Connection Works - kb 22/04/2024
Environmental Statement Figure 9 1c Artificial Geology Electrical Connection Works - kb 22/04/2024
Environmental Statement Figure 9 1d Artificial Geology Hydrogen Distribution Network - kb 22/04/2024
Environmental Statement Figure 9 2a Superficial Geology Main Site - kb 22/04/2024
Environmental Statement Figure 9 2b Superficial Geology Water And Wastewater Connection Works - kb 22/04/2024
Environmental Statement Figure 9 2c Superficial Geology Electrical Connection Works - kb 22/04/2024
Environmental Statement Figure 10 2 Non Statutory Designations Sites Within 2 Km - kb 22/04/2024
Environmental Statement Figure 10 3 Habitats Of Principal Importance - kb 22/04/2024
Environmental Statement Figure 10 1 Statutory Designations Within 10 Km - kb 22/04/2024
Environmental Statement Figure 12 3 Zone Of Theoretical Visibility And Potential Viewpoint Locations - kb 22/04/2024
Environmental Statement Figure 12 4 Topography - kb 22/04/2024
Environmental Statement Figure 12 5 Zone Of Theoretical Visibility And Representative Viewpoint Locations - kb 22/04/2024
Environmental Statement Figure 12 7 Photomontages - kb 22/04/2024
Environmental Statement Figure 12 1 Landscape Context - kb 22/04/2024
Environmental Statement Figure 12 2 Landscape Character - kb 22/04/2024
Environmental Statement Figure 13 2 Location Of Non Designated Heritage Assets - kb 22/04/2024
Environmental Statement Figure 13 3 Location Of Cultural Heritage Events - kb 22/04/2024
Environmental Statement Figure 13 4 Historic Landscape Character - kb 22/04/2024
Environmental Statement Figure 13 1 Location Of Designated Heritage Assets - kb 22/04/2024
Environmental Statement Figure 14 3 Traffic Count Locations - kb 22/04/2024
Environmental Statement Figure 14 4 Traffic Routes - kb 22/04/2024
Environmental Statement Figure 14 1 Traffic Study Area - kb 22/04/2024
Environmental Statement Figure 14 2 Hgv Routes To And From Site - kb 22/04/2024
Environmental Statement Figure 15 1 Air Quality Study Area - kb 22/04/2024
Environmental Statement Figure 16 1 Noise Sensitive Receptor And Monitoring Locations - kb 22/04/2024
Environmental Statement Figure 16 2 Construction Noise Model Sound Source Layout - kb 22/04/2024
Environmental Statement Figure 16 3 Operational Noise Model Sound Source Layout - kb 22/04/2024
Environmental Statement Figure 18 1 Major Accidents And Disasters Receptors Within 5 Km Of The Proposed Development Site Boundary - kb 22/04/2024
Environmental Statement Figure 19 1 Historic And Authorised Landfills And Waste And Mineral Sites - kb 22/04/2024
Environmental Statement Figure 22 1 Zones Of Influence For Cumulative Effects Assessment (sheet 4 Of 4) - kb 22/04/2024
Environmental Statement Figure 22 2 Long List Of Other Developments (sheet 1 Of 2) - kb 22/04/2024
Environmental Statement Figure 22 2 Long List Of Other Developments (sheet 2 Of 2) - kb 22/04/2024
Environmental Statement Figure 22 3 Short List Of Other Developments (sheet 1 Of 2) - kb 22/04/2024
Environmental Statement Figure 22 3 Short List Of Other Developments (sheet 2 Of 2) - kb 22/04/2024
Environmental Statement Figure 22 1 Zones Of Influence For Cumulative Effects Assessment (sheet 1 Of 4) - kb 22/04/2024
Environmental Statement Figure 22 1 Zones Of Influence For Cumulative Effects Assessment (sheet 2 Of 4) - kb 22/04/2024
Environmental Statement Figure 22 1 Zones Of Influence For Cumulative Effects Assessment (sheet 3 Of 4) - kb 22/04/2024
Environmental Statement Volume Ii Appendix 5 A Framework CEMP Final (1) - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 D Reptiles Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 E Invertebrate Survey Report Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 G Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 C Bats Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 13 A Dba Final - kb 22/04/2024
Environmental Statement Report Chapter 22 Cumulative And Combined Effects Final - kb 22/04/2024
Environmental Statement Figure 10 4 Phase 1 Habitats (reduced) - kb 22/04/2024
Environmental Statement Figure 12 6a Winter Photography Part4 - kb 22/04/2024
Environmental Statement Figure 12 6a Winter Photography Part5 - kb 22/04/2024
Environmental Statement Figure 12 6a Winter Photography Part6 - kb 22/04/2024
Environmental Statement Figure 12 6a Winter Photography Part7 - kb 22/04/2024
Environmental Statement Figure 12 6a Winter Photography Part1 - kb 22/04/2024
Environmental Statement Figure 12 6a Winter Photography Part2 - kb 22/04/2024
Environmental Statement Figure 12 6a Winter Photography Part3 - kb 22/04/2024
Environmental Statement Figure 12 6b Summer Photography Part3 - kb 22/04/2024
Environmental Statement Figure 12 6b Summer Photography Part4 - kb 22/04/2024
Environmental Statement Figure 12 6b Summer Photography Part5 - kb 22/04/2024
Environmental Statement Figure 12 6b Summer Photography Part6 - kb 22/04/2024
Environmental Statement Figure 12 6b Summer Photography Part7 - kb 22/04/2024
Environmental Statement Figure 12 6b Summer Photography Part1 - kb 22/04/2024
Environmental Statement Figure 12 6b Summer Photography Part2 - kb 22/04/2024
Outline Landscape And Biodiversity Management Plan (olbmp) Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 A Phase 1 Report Final Part 3 - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 A Phase 1 Report Final Part 4 - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 F Water Vole And Otter Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 A Phase 1 Report Final Part 1 - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 A Phase 1 Report Final Part 2 - kb 22/04/2024
Environmental Statement Report Appendix 21 A Climate Change Risk Register Final - kb 22/04/2024
Environmental Statement Report Appendix 21 B In-combination climate change impact assessment Icci Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 10 B GCN Survey Report Final - kb 22/04/2024
Environmental Statement Appendix 16 B Operational Noise Information Final - kb 22/04/2024
Environmental Statement Appendix 16 C Baseline Sound Monitoring And Survey Information Final - kb 22/04/2024
Environmental Statement Appendix 16 A Construction Noise Levels And Assumptions Final - kb 22/04/2024
Statutory Biodiversity Metric Calculation Tool Option 1 - kb 22/04/2024
Statutory Biodiversity Metric Calculation Tool Option 3 - kb 22/04/2024
Hydrogen Project Biodiversity Net Gain Report Part 1 - kb 22/04/2024
Hydrogen Project Biodiversity Net Gain Report Part 2 - kb 22/04/2024
Hydrogen Project Biodiversity Net Gain Report Part 3 - kb 22/04/2024
Hydrogen Project Biodiversity Net Gain Report Part 4 - kb 22/04/2024
Energy Reduction Statement - kb 22/04/2024
Arboricultural Impact Assessment Final Part 2 - kb 22/04/2024
Arboricultural Impact Assessment Final Part 3 - kb 22/04/2024
Arboricultural Impact Assessment Final Part 1 - kb 22/04/2024
Environmental Statement Non technical summary Final Optimized - kb 22/04/2024
Environmental Statement Volume Ii Appendix 12 B Landscape Character Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 12 C Potential Viewpoints Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 12 A Landscape And Visual Methodology Final - kb 22/04/2024
Environmental Statement Appendix 2 A Scoping Opinion Responses Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 15 A Air Quality Final - kb 22/04/2024
Environmental Statement Volume Ii Appendix 9 A Hygreen Phase 1 Geoenvironmental Desk Study Final - kb 22/04/2024
Environmental Statement Figure 4 4 Hydrogen Production Process Schematic - kb 22/04/2024
Statement Of Community Involvement - kb 22/04/2024
Report To Inform Habitats Regulations Assessement Final Optimized 1 Of 2 - kb 22/04/2024
Report To Inform Habitats Regulations Assessement Final Optimized 2 Of 2 - kb 22/04/2024
Environmental Statement Report Volume Ii Appendices Cover Glossary And Toc - kb 22/04/2024
Environmental Statement Report Volume Iii Figures Cover And Toc - kb 22/04/2024
Environmental Statement Report Volume I Cover Glossary And Toc - kb 22/04/2024
Design Access And Planning Statement - kb 22/04/2024
Environmental Statement Volume Ii Appendix 1 A EIA Scoping Report Part 3 - kb 22/04/2024
Environmental Statement Volume Ii Appendix 1 B RCBC EIA Scoping Opinion - kb 22/04/2024
Environmental Statement Volume Ii Appendix 1 C Statement Of Competence - kb 22/04/2024
Environmental Statement Volume Ii Appendix 1 A EIA Scoping Report Part 1 - kb 22/04/2024
Environmental Statement Volume Ii Appendix 1 A EIA Scoping Report Part 2 - kb 22/04/2024
Environmental Statement Appendix 2 A Scoping Opinion Responses - kb 22/04/2024
Environmental Statement Volume Ii Appendix 8 B Water Framework Directive Assessment - kb 22/04/2024
Environmental Statement Volume Ii Appendix 8 C Nutrient Neutrality Screening - kb 22/04/2024
Environmental Statement Volume Ii Appendix 8 D Drainage Strategy Technical Note - kb 22/04/2024
Environmental Statement Volume Ii Appendix 8 A Flood Risk Assessment - kb 22/04/2024
Environmental Statement Annex B Envirocheck 285342089 Landmark 2021 Part 3 - kb 22/04/2024
Environmental Statement Annex B Gsip 2022 13154 11993 Smallscale Groundsure 2022c Part 2 - kb 22/04/2024
Environmental Statement Annex B Gsip 2022 13154 11993 Smallscale Groundsure 2022c Part 3 - kb 22/04/2024
Environmental Statement Annex B Gsip 2022 13154 11993 Smallscale Groundsure 2022c Part 4 - kb 22/04/2024
Environmental Statement Annex B Gsip 2023 13293 12624 E 1 Groundsure 2023 - kb 22/04/2024
Environmental Statement Annex B 60559231 Ctr05 002 Ec Index Landmark 2020 - kb 22/04/2024
Environmental Statement Volume Ii Appendix 9 A Hygreen Phase 1 Geoenvironmental Desk Study - kb 22/04/2024
Environmental Statement Annex B Gsip 2022 13154 11993 Smallscale Groundsure 2022c Part 1 - kb 22/04/2024
Environmental Statement Annex B Gs 9167786 Smallscale Groundsure 2022b And 2022d - kb 22/04/2024
Environmental Statement Annex B Gs 9167761 Smallscale Groundsure 2022a - kb 22/04/2024
Environmental Statement Annex B Envirocheck 285342089 Landmark 2021 Part 1 - kb 22/04/2024
Environmental Statement Annex B Envirocheck 285342089 Landmark 2021 Part 2 - kb 22/04/2024
Environmental Statement Figure 11 2 Wetland Bird Count Sectors - kb 22/04/2024
Environmental Statement Figure 11 3 Hygreen Breeding Bird Survey Areas - kb 22/04/2024
Environmental Statement Figure 11 1 Study Areas - kb 22/04/2024
Environmental Statement Figure 11 4 Net zero Teesside Breeding Bird Survey Areas - kb 22/04/2024
Environmental Statement Figure 11 5 Statutory Designated Sites - kb 22/04/2024
Environmental Statement Figure 11 6 Non Statutory Designated Sites - kb 22/04/2024
Environmental Statement Appendix 14 B Construction Worker Travel Plan - kb 22/04/2024
Environmental Statement Appendix 14 C Construction Worker Travel Plan - kb 22/04/2024
Environmental Statement Appendix 14 A Transport Assessment - kb 22/04/2024
Environmental Statement Volume Ii Appendix 15 A Air Quality - kb 22/04/2024
Environmental Statement Volume Ii Appendix 18 B Hazardous Substances Consent Flowchart - kb 22/04/2024
Environmental Statement Volume Ii Appendix 18 C Comah Flowchart - kb 22/04/2024
Environmental Statement Volume Ii Appendix 18 A Major Accidents And Disasters - kb 22/04/2024
Environmental Statement Volume Ii Appendix 22c Shortlist - kb 22/04/2024
Environmental Statement Volume Ii Appendix 22 D Assessment Of Cumulative Effects - kb 22/04/2024
Environmental Statement Volume Ii Appendix 22a Long List - kb 22/04/2024
Environmental Statement Volume Ii Appendix 22b Cumulative Assessment Stages 1 3 - kb 22/04/2024
Pipeline Network And Routing 20 Sheets Part1 - kb 22/04/2024
Pipeline Network And Routing 20 Sheets Part2 - kb 22/04/2024
Pipeline Network And Routing 20 Sheets Part3 - kb 22/04/2024
Environmental Statement Report - Appendix 11A Ornithology Redacted Amended 3.05.2024 - kb 03/05/2024
Additional Ecology Information Memo Final For Issue - kb 14/10/2024
Supporting Information In Response To Natural England Consultation - kb 17/02/2025
Consultee Name Date Letter Sent Consultation Expiry Date
- 21/08/2024 -
Asset Management Team Fao Guy Allen 24/04/2024 -
Business Growth Team 24/04/2024 -
Cleveland Police ALO - Steve Cranston 24/04/2024 -
Councillor C Cawley (DORMANSTOWN) 24/04/2024 -
Councillor D Powlay (DORMANSTOWN) 24/04/2024 -
Councillor I Attwood (SOUTH BANK) 24/04/2024 -
Councillor N Bendelow (SOUTH BANK) 24/04/2024 -
Engineering Team (Highways) 24/04/2024 -
Engineers (Local Lead Flood Authority) 24/04/2024 -
Environment Agency 24/04/2024 -
Environmental Protection Team 24/04/2024 -
Environmental Protection Team 25/04/2024 -
Greener Future - Climate Change 24/04/2024 -
Health & Safety-Food (Food Team) 24/04/2024 -
Health and Safety Executive 25/04/2024 -
Income and Funding Officer 24/04/2024 -
National Grid 24/04/2024 -
National Highways 24/04/2024 -
National Planning Casework Unit 24/04/2024 -
Natural England 24/04/2024 -
Natural England 22/10/2024 -
Natural England 28/02/2025 -
Natural Heritage Manager 24/04/2024 -
NEAR Ltd (Archaeological Services) 24/04/2024 -
Network Rail 24/04/2024 -
Northern Gas Network 24/04/2024 -
Northumbrian Water Ltd 24/04/2024 -
Pipeline CATS 24/04/2024 -
Pipeline CATS 24/04/2024 -
Pipeline TPEP 24/04/2024 -
Pipeline WGEP 24/04/2024 -
Place Investment Team 24/04/2024 -
RSPB 24/04/2024 -
South Tees Development Company 24/04/2024 -
Strategic Planning Team (Policy) 24/04/2024 -
Strategic Transport 24/04/2024 -
Address Date Sent Date Reconsulted Expiry Date
Lichfields on behalf of Anglo American - - -
12 Swanage Close YARM TS15 9GJ - - -
Brigg Road, Scunthorpe North Lincolnshire, DN16 1XA - - -
- - - -
On behalf of Redcar Bulk Terminal Africa House 70 Kingsway London WC2B 6AH - - -
164 BROADWAY WEST REDCAR TS10 5PJ 24/04/2024 - 24/05/2024
162 BROADWAY WEST REDCAR TS10 5PJ 24/04/2024 - 24/05/2024
75 WILTON AVENUE REDCAR TS10 5PN 24/04/2024 - 24/05/2024
79 WILTON AVENUE REDCAR TS10 5PL 24/04/2024 - 24/05/2024
77 WILTON AVENUE REDCAR TS10 5PL 24/04/2024 - 24/05/2024
81 WILTON AVENUE REDCAR TS10 5PL 24/04/2024 - 24/05/2024
65 WILTON AVENUE REDCAR TS10 5PN 24/04/2024 - 24/05/2024
67 WILTON AVENUE REDCAR TS10 5PN 24/04/2024 - 24/05/2024
69 WILTON AVENUE REDCAR TS10 5PN 24/04/2024 - 24/05/2024
71 WILTON AVENUE REDCAR TS10 5PN 24/04/2024 - 24/05/2024
73 WILTON AVENUE REDCAR TS10 5PN 24/04/2024 - 24/05/2024
54 WILTON AVENUE REDCAR TS10 5PL 24/04/2024 - 24/05/2024
56 WILTON AVENUE REDCAR TS10 5PL 24/04/2024 - 24/05/2024
83 WILTON AVENUE REDCAR TS10 5PL 24/04/2024 - 24/05/2024
85 WILTON AVENUE REDCAR TS10 5PL 24/04/2024 - 24/05/2024
87 WILTON AVENUE REDCAR TS10 5PL 24/04/2024 - 24/05/2024
Site or Press Description Display Date Expiry Date
P ENVIRONMENTAL STATEMENT 26/04/2024 26/05/2024
S ENVIRONMENTAL STATEMENT 01/05/2024 31/05/2024