R/2024/0034/CD

Planning Application Details - Official Consultation has expired.

Location
GRIPPS FARM BROTTON ROAD BROTTON SALTBURN BY THE SEA TS12 2QU
Proposal
Discharge of condition 3 (LLFA 1) 4 (LLFA 2) 5 (LLFA 3) 6 (Vehicle Sight Lines) 9 (External Materials) 14 (External Lighting) and 15 (Asbestos) of planning permission R/2023/0409/FF for change of use and conversion of existing farm buildings to form office and granny annex including new windows, dor...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Skelton and Brotton CP
Applicant
Sid McAuley
Applicant's Address
Gripps Farm Brotton Road Brotton Redcar And Cleveland TS12 2QU
Agent
LJC Architectural Design
Agent's Address
Mr Gordon Henderson 309 Hub Two, The Innovation Centre Vienna Court Kirkleatham Business Park Redcar TS10 5SH
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
16/01/2024
Date Valid
22/01/2024
Expiry
18/03/2024
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
18/03/2024
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
2 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
3 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
4 Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission (including samples) shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
5 No external lighting shall be installed on site until plans showing the type of light appliance, the height and position of fitting, illumination levels and light spillage have been submitted to and approved in writing by the Local Planning Authority. The lighting approved shall be installed and maintained in accordance with the approved details. REASON: In the interests of the amenities of the area and to minimise unnecessary light spillage above and outside the development site in accordance with Policy SD4 of the Redcar and Cleveland Local Plan.
6 Prior to the development being brought into permitted end use, the developer must either submit evidence that the building was built post 2000 or carry out an intrusive pre-demolition asbestos survey in accordance with HSG264 and provide a mitigation plan to reduce risks to potential workers, neighbours and other offsite receptors. REASON: To ensure that risks from asbestos to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 291 kb 22/01/2024
Consultee Responses
Consultee response - Environmental Protection (Contaminated Land) 15 kb 24/01/2024
Consultee response - Environmental Protection (Nuisance) 239 kb 12/02/2024
Consultee response - Engineers (Local Lead Flood Authority) 50 kb 08/03/2024
Decision
Decision Notice 470 kb 18/03/2024
Officer Report
Officer Report 347 kb 18/03/2024
Supporting Documentation
Decision Notice R/2023/0409/FF 436 kb 16/01/2024
Condition 14 - External Lighting 643 kb 19/01/2024
Condition 15 - Asbestos Survey 6837 kb 19/01/2024
Condition No 3, 4, 5, 6, 9, 14, and 15 - Conditions Document 76 kb 22/01/2024
Work Schedule 142 kb 22/01/2024
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor B Hunt (BROTTON) 23/01/2024 -
Councillor G Cutler (BROTTON) 23/01/2024 -
Councillor M Fletcher (BROTTON) 23/01/2024 -
Engineering Team (Highways) 23/01/2024 -
Engineers (Local Lead Flood Authority) 23/01/2024 -
Environmental Protection Team 23/01/2024 -