R/2023/0858/CD

Planning Application Details - Official Consultation has expired.

Location
LAND OFF NIGHTINGALE ROAD GALLEY HILL GUISBOROUGH
Proposal
DISCHARGE OF CONDITION 6 (GROUND LEVELS), 7 (MATERIALS EXTERNAL), 8 (MATERIALS HARD SURFACE), 9 (FOUL AND SURFACE WATER), 10 (PEDESTRIAN LINK), 13 (EARTHWORK BOUNDARY), AND 16 (CONSTRUCTION METHOD STATEMENT) OF OUTLINE PLANNING PERMISSION R/2018/0621/OOM FOR ERECTION OF UP TO 60 RESIDENTIAL DWELLING...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Guisborough CP
Applicant
STONEBRIDGE HOMES LTD
Applicant's Address
KATIE PURDAM FEATHERBANK COURT HORSFORTH LS18 4QF
Agent
ELG Planning
Agent's Address
MR STEVEN LONGSTAFF GATEWAY HOUSE 55 CONISCLIFFE ROAD DARLINGTON DL3 7EH
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
12/12/2023
Date Valid
12/12/2023
Expiry
06/02/2024
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
18/04/2024
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of development plans showing the existing and proposed ground levels over the site together with finished floor levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as construction activity and site preparation can change existing levels resulting in increased ground levels which the authority needs to consider.
2 Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission (including samples) shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
3 Prior to the construction of the final surface treatment, for any hard surfaced areas, details of the materials to be used shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
4 Development shall not commence until a detailed scheme for the disposal of foul and surface water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as the information relates to construction activity and site preparation.
5 The reserved matters submitted pursuant to condition (1) above shall include the following: The pedestrian link to the development shall be improved by constructing a new footway along the southern side of Middlesbrough Road, linking the site with the pedestrian crossing with the Whinchat footway, in accordance with details to be first submitted to and agreed in writing with the Local Planning Authority. The footway shall be completed on site, in accordance with the approved details, prior to the occupation of the 30th dwelling on the site. REASON: In the interests of highway safety in accordance with policies SD4, H3 (part d) and TA1 of the Redcar and Cleveland Local Plan.
6 No site works that cut through or otherwise disturb the earthwork boundary running along parts of the southern boundary of the site shall take place until a written scheme for an archaeological watching brief of such works has been submitted to and approved by the local planning authority. Such site works shall then be carried out in accordance with such written scheme. REASON: To conserve a feature of archaeological interest in accordance with policy HE3 of the Redcar and Cleveland Local Plan.
7 Prior to the commencement of development details of : a) a construction traffic management plan, b) contractors car parking, c) material storage and d) a noise and dust mitigation strategy for the constuction phase of the development should be submitted to the Local Planning Authority for approval in wirting. The approved details shall be implemented in its entirety and maintained throughout the period of construction. REASON: in the interests of neighbour amenity in accordance with policy SD4 (part n) of the Redcar and Cleveland Local Plan and Highway Safety. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as the information relates to construction activity and site preparation

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 285 kb 12/12/2023
Consultee Responses
Consultee response - Ward Councillor 710 kb 20/12/2023
Consultee response - Environmental Protection (Nuisance) 238 kb 02/01/2024
Consultee response - Archaeological Consultant 891 kb 16/01/2024
Consultee response - Engineers (Local Lead Flood Written 48 kb 08/03/2024
Consultee response - Northumbrian Water 805 kb 21/03/2024
Consultee response - Engineering Team (Highways) 765 kb 18/04/2024
Decision
Decision Notice 461 kb 18/04/2024
Officer Report
Officer Report 360 kb 18/04/2024
Superseded
Condition 13 - Written Scheme of Investigation - Watching Brief Specification 15609 kb 12/12/2023
Condition 16 - Construction Management Plan Amended 8295 kb 05/03/2024
Supporting Documentation
Condition 16 - Construction Method Statement SUPERSED 8324 kb 12/12/2023
Condition 7 - Materials Plan 691 kb 12/12/2023
Condition 8 - Adoptable Highway Details SUPERSEDED 322 kb 12/12/2023
Condition 9 - Suds Basin Details SUPERSEDED 648 kb 12/12/2023
Condition 9 - Engineering Layout Sheet 1 SUPERSEDED 872 kb 12/12/2023
Condition 9 - Engineering Layout Sheet 2 SUPERSEDED 1287 kb 12/12/2023
Condition 9 - Adoptable Highway And Sewer Longsections Sheet 1 Rev P2 310 kb 12/12/2023
Condition 9 - Adoptable Highway And Sewer Longsections Sheet 2 Rev P4 SUPERSDED 286 kb 12/12/2023
Condition 8 and 10 - Section 38 Agreement Plan SUPERSEDED 1355 kb 12/12/2023
Condition 8 and 10 - Off Site Footpath Link Details SUPERSEDED 492 kb 12/12/2023
Condition 6 - Plotworks Finished Floor Levels / Eaves Ridge Levels SUPERSEDED 576 kb 12/12/2023
Condition 6 - External Levels Sheet 1 (rev P4) SUPERSEDED 618 kb 12/12/2023
Condition 6 - External Levels Sheet 2 (rev P4) SUPERSEDED 609 kb 12/12/2023
Condition 16 - Construction Method Statement Amended 14.12.23 8324 kb 14/12/2023
Condition 13 - Written Scheme of Investigation - Watching Brief Specification September 2023 SUPERSEDED 15617 kb 02/02/2024
Condition 7 - Materials Plan 1227 kb 05/03/2024
Condition 9 - Engineering Layout Sheet 2 (rev P7) SUPERSEDED 1283 kb 05/03/2024
Condition 9 - Engineering Layout Sheet 1 (rev P5) SUPERSEDED 904 kb 05/03/2024
Condition 9 - Suds Basin Details (rev P4) SUPERSEDED 649 kb 05/03/2024
Condition 8 & 10 - Section 38 AMENDED 1439 kb 05/03/2024
Condition 8 & 10 - Off Site Footpath Link Details (rev P2) 508 kb 05/03/2024
Condition 8 - Adoptable Highway Details (rev P2) SUPERSEDED 322 kb 05/03/2024
Condition 9 - Adoptable Highway & Sewer Longsections Sheet 2 (rev P5) SUPERSEDED 286 kb 05/03/2024
Condition 6 - External Levels Sheet 1 (rev P6) Amended 1150 kb 07/03/2024
Condition 8 - Adoptable Highway Details (rev P2)(1) Amended 322 kb 07/03/2024
Condition 6 - Plotworks FFL/ Eaves/Ridge Levels[Rev P2] AMENDED 1293 kb 07/03/2024
Condition 6 - External Levels Sheet 2 (rev P6) Amended 839 kb 07/03/2024
Condition 9 - Adoptable Highway & Sewer Longsections Sheet 2 (rev P5)(1) 286 kb 07/03/2024
Condition 9 - P9 Engineering Layout Sheet 2 Amended 1328 kb 07/03/2024
Condition 9 - Engineering Layout Sheet 1 Amended 859 kb 07/03/2024
Condition 9 - Surfacing And Kerbs Layout Sheet 2 777 kb 07/03/2024
Condition 9 - Surfacing And Kerbs Layout Sheet 1 1030 kb 07/03/2024
Condition 9 - Suds Basin Details (rev P5) Amended 991 kb 07/03/2024
Condition 9 - Suds Basin Details (rev P4)[46] Amended 649 kb 07/03/2024
Condition 13 - Written Scheme of Investigation - Watching Brief Specification Collated Revised[13] Amended 7455 kb 07/03/2024
Condition 9 - Overland Flows Pre And Post Development 2565 kb 07/03/2024
Condition 16 - Construction Management Plan Amended 7455 kb 18/04/2024
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor G Jeffery (HUTTON) 14/12/2023 -
Councillor J Hart (HUTTON) 14/12/2023 -
Councillor J Joy (HUTTON) 14/12/2023 -
Engineering Team (Highways) 14/12/2023 -
Engineers (Local Lead Flood Authority) 14/12/2023 -
Environmental Protection Team 14/12/2023 -
NEAR Ltd (Archaeological Services) 14/12/2023 -
NEAR Ltd (Archaeological Services) 02/02/2024 -
Northumbrian Water Ltd 14/12/2023 -