R/2023/0799/FFM

Planning Application Details - Official Consultation has expired.

Location
A66/A1053 ROUNDABOUT TEES DOCK ROAD GRANGETOWN
Proposal
ALTERATIONS TO TEES DOCK ROUNDABOUT TO INCLUDE NEW LEG TO PROVIDE ACCESS TO LACKENBY DEVELOPMENT SITE AND WIDENING OF EXISTING HIGHWAY TO PROVIDE AN ADDITIONAL LANE ON THE EXISTING CARRIAGEWAYS
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
SOUTH TEES DEVELOPMENT CORPORATION
Applicant's Address
- REDCAR GATE TRUNK ROAD REDCAR TS10 5QW
Agent
Lichfields
Agent's Address
MRS JUSTINE MATCHETT ST NICHOLAS BUILDING ST NICHOLAS STREET NEWCASTLE UPON TYNE NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
07/12/2023
Weekly List Expiry Date
-
Date Received
28/11/2023
Date Valid
04/12/2023
Expiry
28/06/2024
Consultation Expiry
14/01/2024
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
26/06/2024
Decision Level
-

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan (Dwg No. R-SD-10.00) received by the Local Planning Authority on 28/11/23 Proposed Site Plan (Dwg No. R-SD-10.02) received by the Local Planning Authority on 28/11/23 Preliminary Layout Plan (Dwg No. 279257-ARP-15-XX-DR-CH-0101) received by the Local Planning Authority on 29/11/23 REASON: To accord with the terms of the planning application.
3 The development hereby approved shall not be commenced until a detailed method of works statement has been submitted to and approved in writing by the Local Planning Authority. Such statement shall include at least the following details; a) Routing of construction traffic, including signage where appropriate; b) Arrangements for site compound and contractor parking; c) Measures to prevent the egress of mud and other detritus onto the public highway; d) A jointly undertaken dilapidation survey of the adjacent highway; e) Program of works; f) Measures to prevent public access to the fourth leg until an appropriate time; and, g) Details of any road/footpath closures as may be required. The development must be carried out in accordance with the approved details. REASON: To ensure that the development can be carried out in a manner that will not be to the detriment of amenity of local residents, free flow of traffic or safety of highway users having regard for Local Plan Policy. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to the submission of a ‘method of works’ which need to be approved, prior to any development commencing to ensure that the development is carried out in an appropriate manner.
4 The development hereby approved, shown in principle on drawing ref: ‘1846-THE-R-SD-10.02 Rev – Site Plan Proposed’, shall not be constructed unless and until detailed design drawings have been submitted and approved in writing by the local highway authority. REASON: To ensure a satisfactory form of development and in the interests of highway safety having regard for Local Plan Policy and sections 9 and 12 of the NPPF
5 Unless otherwise agreed in writing with the Local Planning Authority, the area shown as purple hatching on drawing “23D33-SYS-HGN-TRK_Z0-DR-CH-01-P01 Options Master June-015” received by the Local Planning Authority on 14/06/24 shall not be brought into use, other than for purposes highlighted in the method of works statement. REASON: In the interests of free flow of traffic and safety of highway users having regard for Local Plan Policy and NPPF.
6 Unless otherwise agreed by the Local Planning Authority in writing, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts (a) to (c) have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until condition (d) has been complied with in relation to that contamination. (a) Site Characterisation An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to: • human health, • property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, • adjoining land, • groundwaters and surface waters, • ecological systems, • archeological sites and ancient monuments; (iii) an appraisal of remedial options, and proposal of the preferred option(s). This must be conducted in accordance with Environment Agency’s Land Contamination Risk Management Guidance (b) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (c) Implementation of Approved Remediation Scheme The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. (d) Reporting of Unexpected Contamination In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. REASON : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to land contamination details which are often the first works on site and relate to site preparation.
7 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
8 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
9 The development shall not be brought into first use until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
10 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.
11 Adoption of Highway The applicant is advised that prior to the commencement of works on site they should contact the Highway Authority (07966 659 107), with a view to preparing the necessary drawings and legal work required for the formal adoption of the new highway layout. The S38 / 278 Agreement should be in place prior to the commencement of works on site.
12 Design The design of the roadworks shall include the details of fencing, barriers, and signage to restrict access to land off adopted highway.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 436 kb 28/11/2023
Cover Letter 248 kb 28/11/2023
Consultee Responses
Consultee response - Cleveland Police 752 kb 07/12/2023
Consultee response - National Highways 160 kb 11/12/2023
Consultee response - Place Investment Team 278 kb 12/12/2023
Consultee response - Ramblers Association 438 kb 14/12/2023
Consultee response - Engineers (Local Lead Flood Authority) 457 kb 20/12/2023
Consultee response - Environmental Protection (Nuisance) 237 kb 21/12/2023
Consultee response - Environmental Protection (Contaminated Land) 272 kb 21/12/2023
Consultee response - Archaeological Consultant 1070 kb 29/01/2024
Consultee response - Engineers (Local Lead Flood Authority) 879 kb 12/06/2024
Consultee response - Engineering Team (Highways) 768 kb 14/06/2024
Decision
Decision Notice 436 kb 26/06/2024
Location Plan
Location Plan 850 kb 28/11/2023
Officer Report
Officer Report 665 kb 17/06/2024
Representations
Neighbour Comments - PD Ports 1359 kb 21/02/2024
Neighbour Comments - PD Ports (2) 1398 kb 21/03/2024
Plans
Proposed Site Plan 3068 kb 28/11/2023
Existing Site Plan 1203 kb 28/11/2023
Preliminary Layout Plan 1005 kb 29/11/2023
Planning Condition Drawing 01 6637 kb 14/06/2024
Supporting Documentation
Flood Risk Assessment 724 kb 04/12/2023
Remediation Strategy 2989 kb 04/12/2023
Design and Access Statement 248 kb 04/12/2023
Agent Response to Neighbour Comments 781 kb 23/02/2024
Consultee Name Date Letter Sent Consultation Expiry Date
Asset Management Team Fao Guy Allen 07/12/2023 -
Business Growth Team 07/12/2023 -
Cleveland Police ALO - Steve Cranston 07/12/2023 -
Councillor A Brook (GRANGETOWN) 07/12/2023 -
Councillor I Attwood (SOUTH BANK) 07/12/2023 -
Councillor L Pallister (GRANGETOWN) 07/12/2023 -
Councillor N Bendelow (SOUTH BANK) 07/12/2023 -
Engineering Team (Highways) 07/12/2023 -
Engineers (Local Lead Flood Authority) 07/12/2023 -
Environment Agency 07/12/2023 -
Environmental Protection Team 07/12/2023 -
Greener Future - Climate Change 07/12/2023 -
Health and Safety Executive 07/12/2023 -
National Grid 07/12/2023 -
National Highways 07/12/2023 -
NEAR Ltd (Archaeological Services) 07/12/2023 -
Network Rail 07/12/2023 -
Northern Powergrid 07/12/2023 -
Northumbrian Water Ltd 07/12/2023 -
Place Investment Team 07/12/2023 -
Public Rights of Way 07/12/2023 -
Ramblers Association 07/12/2023 -
South Tees Development Company 07/12/2023 -
Strategic Planning Team (Policy) 07/12/2023 -
Address Date Sent Date Reconsulted Expiry Date
PD PORTS LIMITED 17-27 QUEENS SQUARE MIDDLESBROUGH TS2 1AH 07/12/2023 - 30/12/2023
137 BOLCKOW ROAD GRANGETOWN MIDDLESBROUGH TS6 7EJ 07/12/2023 - 30/12/2023
139 BOLCKOW ROAD GRANGETOWN MIDDLESBROUGH TS6 7EJ 07/12/2023 - 30/12/2023
141 BOLCKOW ROAD GRANGETOWN MIDDLESBROUGH TS6 7EJ 07/12/2023 - 30/12/2023
131 BOLCKOW ROAD GRANGETOWN MIDDLESBROUGH TS6 7EJ 07/12/2023 - 30/12/2023
135 BOLCKOW ROAD GRANGETOWN MIDDLESBROUGH TS6 7EJ 07/12/2023 - 30/12/2023
133 BOLCKOW ROAD GRANGETOWN MIDDLESBROUGH TS6 7EJ 07/12/2023 - 30/12/2023
10 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
12 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
20 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
22 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
27 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
23 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
24 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
25 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
26 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
9 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
11 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
14 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
19 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
21 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
15 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
16 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
17 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
18 CORNCROFT MEWS GRANGETOWN MIDDLESBROUGH TS6 7HJ 07/12/2023 - 30/12/2023
K W B POWER LTD TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 7AB 07/12/2023 - 30/12/2023
Site or Press Description Display Date Expiry Date
P ARTICLE 15 15/12/2023 08/01/2024
S ARTICLE 15 21/12/2023 14/01/2024