Location
LAND WEST OF TUNED IN
CAR PARK AND ADJACENT LAND
MAJUBA ROAD
REDCAR
Proposal
NON-MATERIAL AMENDMENT OF PLANNING PERMISSION R/2021/0241/FFM TO AMEND THE WORDING TO DRAINAGE CONDITIONS (8 AND 9 ) TO ALLOW AN ALTERATIVE TIMEFRAME FOR THE CONDITIONS TO BE AGREED AS FOLLOWS - PRIOR TO COMMENCEMENT OF DEVELOPMENT EXCLUDING ANY WORKS REQUIRED IN ACCORDANCE WITH THE REMEDIATION STRA...
Application Type
Non-material amendment
Status
Approved
Parish(es)
Applicant
REDCAR AND CLEVELAND COUNCIL
Applicant's Address
MR MARK HOPGOOD
REDCAR AND CLEVELAND HOUSE
KIRKLETHAM STREET
REDCAR
TS10 1RT
Agent
cohesion consult ltd
Agent's Address
MR STUART AINSLEY
PRIMROSE COTTAGE, BEDFORD ROAD
BEDFORD ROAD, LITTLE HOUGHTON
CHURWELL
NORTHAMPTON
NN7 1AD
Agent's work phone
Agent's email
Case Officer
Mrs C Griffiths
Case Officer Telephone
01287 612629
Case Officer Email
claire.griffiths@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
20/11/2023
Date Valid
21/11/2023
Expiry
19/12/2023
Consultation Expiry
-
associated_bldreg
-
Decision
NON MATERIAL AMENDMENT APPROVE
Decision Date
19/12/2023
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | Prior to commencement of development excluding any works required in accordance with the remediation strategy details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation. |
| 2 | Prior to commencement of development excluding any works required in accordance with the remediation strategy details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 305 kb | 20/11/2023 | |
| Decision | |||
| Decision Notice | 322 kb | 19/12/2023 | |
| Officer Report | |||
| Officer Report | 379 kb | 19/12/2023 | |
| Supporting Documentation | |||
| Location Plan and Site Plan | 225 kb | 20/11/2023 | |
| Decision Notice R 2021 0241 FFM | 437 kb | 20/11/2023 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Councillor C W Quartermain (COATHAM) | 21/11/2023 | - |