R/2023/0678/CD

Planning Application Details - Official Consultation has expired.

Location
LAND WEST OF 16 WINCHESTER WAY AND REAR OF 61 HIGH STREET ESTON
Proposal
DISCHARGE OF CONDITIONS 4 (LLFA1) 5 (LLFA2) 6 (LEVELS) AND 8 (CEMP) OF PLANNING PERMISSION R/2021/0411/FF FOR CONSTRUCTION OF 4NO. BUNGALOWS
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
MR L WHITE
Applicant's Address
42 CAMBRIDGE ROAD MIDDLESBROUGH TS5 5LE
Agent
MR GARRY PHILLIPSON
Agent's Address
12 CHESTNUT AVENUE REDCAR TS10 3PB
Agent's work phone
01642 481078
Agent's email
garry.phillipson@ntlworld.com
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
13/10/2023
Date Valid
10/11/2023
Expiry
05/01/2024
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
11/10/2024
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
2 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
3 Prior to the commencement of development plans showing the existing and proposed ground levels over the site together with finished floor levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as construction activity and site preparation can change existing levels resulting in increased ground levels which the authority needs to consider.
4 Prior to commencement of construction, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) The erection and maintenance of security hoarding including decorative displays; v) Wheel washing facilities; vi) Measures to control the emission of noise dust and vibration during the construction period. vii) A scheme for recycling/disposing of waste resulting from demolition and construction works. REASON: To protect the amenity of nearby residents and in the interests of highway safety.
5 Prior to the 28/03/25 or prior to the occupation of any dwelling associated with planning approval R/2021/0411/FF which ever is sooner, the final Nutrient Credit Certificate shall be submitted to and approved in writing by the Local Planning Authority. REASON: To ensure the environmental effects of the proposed development are appropriately managed.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 581 kb 13/10/2023
Consultee Responses
Consultee response - Engineers (Local Lead Flood Authority) 454 kb 21/11/2023
Consultee response - Environmental Protection (Nuisance) 14 kb 29/11/2023
Consultee response - Natural England 181 kb 08/01/2024
Consultee response - Environmental Protection (Contaminated Land) 641 kb 08/02/2024
Consultee response - Engineers (Local Lead Flood Authority) 640 kb 08/02/2024
Decision
Compliance Decision Notice 244 kb 14/02/2024
Compliance Decision Notice 246 kb 11/10/2024
Officer Report
Compliance Officer Report 178 kb 14/02/2024
Compliance Officer Report 190 kb 11/10/2024
Supporting Documentation
Condition 6 and 8 - Proposed Site Plan 3155 kb 13/10/2023
Copy of Decision Notice R/2021/0411/FF 232 kb 13/10/2023
Conditions 4 and 5 - Drainage Design and Calculations Information 806 kb 06/11/2023
Condition 8 - Compound Plans 471 kb 08/02/2024
Conditions 4 and 5 - Drainage Layout 594 kb 08/02/2024
Condition 8 - Construction Method Statement 837 kb 08/02/2024
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor M O'Donoghue (TEESVILLE) 13/11/2023 -
Councillor P Chaney (TEESVILLE) 13/11/2023 -
Councillor R Clark (TEESVILLE) 13/11/2023 -
Engineering Team (Highways) 13/11/2023 -
Engineers (Local Lead Flood Authority) 13/11/2023 -
Engineers (Local Lead Flood Authority) 08/02/2024 -
Environmental Protection Team 08/02/2024 -
Environmental Protection Team 13/11/2023 -
Natural England 16/11/2023 -