Location
LAND ADJACENT TO SOUTH BANK QUAY
TEES DOCK ROAD
GRANGETOWN
Proposal
ERECTION OF AN INDUSTRIAL UNIT WITH ANCILLARY OFFICE SPACE
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
SOUTH TEES DEVELOPMENTS LIMITED
Applicant's Address
Agent
Lichfields
Agent's Address
MISS RACHEL DODD
THE ST NICHOLAS BUILDING
ST NICHOLAS STREET
NEWCASTLE UPON TYNE
NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
11/05/2023
Weekly List Expiry Date
-
Date Received
03/05/2023
Date Valid
10/05/2023
Expiry
23/10/2023
Consultation Expiry
14/06/2023
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
23/10/2023
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2 | The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan received by the Local Planning Authority on 03/05/23 Proposed Site Plan (Dwg No. SD-10.01 Rev A) received by the Local Planning Authority on 06/09/23 Proposed Floor Plans (Dwg No. SD-20.01 Rev B) received by the Local Planning Authority on 06/09/23 Proposed Elevations (Dwg No. SD -30.01 Rev B) received by the Local Planning Authority on 06/09/23 REASON: To accord with the terms of the planning application. |
| 3 | Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan. |
| 4 | Prior to the first occupation of the development, hereby approved, (where they are to be installed) details of any boundary walls and fences shall first be submitted to and agreed in writing with the Local Planning Authority. The boundary walls and fences shall thereafter be maintained unless the express consent of the Local Planning Authority is given. REASON: To ensure that any boundary treatments would accord with policy SD4 of the Redcar and Cleveland Local Plan by respecting the character of the site and the surroundings and raising no significant adverse impact on neighbouring occupiers. |
| 5 | The development hereby approved shall not be occupied until the development approved under application R/2023/0594/RM has been completed in accordance with those drawings approved by the Local Planning Authority (or as subsequently amended). REASON: To ensure suitable highway access and parking are provided to serve the development in accordance with policy SD4 of the Local Plan. |
| 6 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation. |
| 7 | Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation. |
| 8 | The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality. |
| 9 | In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where remediation is necessary a remediation scheme must be prepared, which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with this condition. REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 10 | Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Business Growth Team | 11/05/2023 | - |
| Cleveland Police ALO - Steve Cranston | 11/05/2023 | - |
| Councillor I Attwood (SOUTH BANK) | 11/05/2023 | - |
| Councillor N Bendelow (SOUTH BANK) | 11/05/2023 | - |
| Engineering Team (Highways) | 11/05/2023 | - |
| Engineers (Local Lead Flood Authority) | 11/05/2023 | - |
| Environmental Protection Team | 11/05/2023 | - |
| Greener Future - Climate Change | 11/05/2023 | - |
| Health & Safety-Food (Food Team) | 11/05/2023 | - |
| Health and Safety Executive | 11/05/2023 | - |
| Income and Funding Officer | 11/05/2023 | - |
| Northumbrian Water Ltd | 11/05/2023 | - |
| Place Investment Team | 11/05/2023 | - |
| Strategic Planning Team (Policy) | 11/05/2023 | - |
| Address | Date Sent | Date Reconsulted | Expiry Date |
|---|---|---|---|
| HANSON CEMENT TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6UF | 11/05/2023 | - | 02/06/2023 |
| Site or Press | Description | Display Date | Expiry Date |
|---|---|---|---|
| S | ARTICLE 15 | 23/05/2023 | 14/06/2023 |
| P | ARTICLE 15 | 19/05/2023 | 10/06/2023 |