DISCHARGE OF CONDITIONS 3 (LEVELS), 4 (NWL DRAINAGE), 5 (LLFA 1), 6 (LLFA 2) & 8 (CEMP) OF PLANNING PERMISSION R/2022/0670/FFM FOR A DETACHED TWO STOREY CARE HOME (20 UNITS) WITH ATTACHED SINGLE STOREY NURSING HOME (3 UNITS) WITH NEW VEHICULAR ACCESS AND ASSOCIATED PARKING AND LANDSCAPING
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
PRESTIGE GROUP LIMITED
Applicant's Address
YEW TREE CARE CENTRE YEW TREE AVENUE REDCAR
Agent
emBARKARCHITECTURE
Agent's Address
KENILWORTH ROAD MONKSEATON WHITLEY BAY NE25 8BD
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
11/04/2023
Date Valid
11/04/2023
Expiry
07/06/2023
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
07/06/2023
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of development plans showing the existing and proposed ground levels over the site together with finished floor levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as construction activity and site preparation can change existing levels resulting in increased ground levels which the authority needs to consider.
2 Development shall not commence until a detailed scheme for the disposal of foul and surface water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
3 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
4 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
5 Prior to commencement of construction, a CEMP shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) The erection and maintenance of security hoarding including decorative displays; v) Wheel washing facilities; vi) Measures to control the emission of noise dust and vibration during the construction period. vii) A scheme for recycling/disposing of waste resulting from construction works. REASON: To protect the amenity of nearby residents and in the interests of highway safety REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to site preparation.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 1322 kb 11/04/2023
Consultee Responses
Consultee response - Environmental Protection (Nuisance) 240 kb 24/04/2023
Consultee response - Environmental Protection (Contaminated Land) 15 kb 02/05/2023
Consultee response - Northumbrian Water 52 kb 16/05/2023
Consultee response - Engineers (Local Lead Flood Authority) (1) 459 kb 17/05/2023
Consultee response - Engineers (Local Lead Flood Authority) (2) 49 kb 02/06/2023
Consultee response - Engineering Team (Highways) 633 kb 07/06/2023
Decision
Compliance Decision Notice 263 kb 07/06/2023
Officer Report
Compliance Officer Report 342 kb 07/06/2023
Supporting Documentation
Condition 8 - CEMP Construction Environmental Management Plan 1509 kb 11/04/2023
Condition 3 - Levels - E031 Site Levels 381 kb 11/04/2023
Condition 3 - Levels - Building Sections Sheet 1 181 kb 11/04/2023
Condition 3 - Levels - Building Sections Sheet 2 179 kb 11/04/2023
Condition 4, 5 & 6 - Drainage - Drainage Strategy 1061 kb 11/04/2023
Condition 4, 5 & 6 - Drainage - Sewerage Pre Planning Enquiry Response Yew Tree Care Home 304736 213 kb 11/04/2023
Condition 4, 5 & 6 - Drainage - Design Drawing 313 kb 11/04/2023
Condition 4, 5 & 6 - Drainage Hydraulic Characteristics 180 kb 11/04/2023
Condition 4, 5 & 6 -Surface Water Design Calculations 756 kb 11/04/2023
Decision Notice R/2022/0670/FFM 280 kb 11/04/2023
Yew Tree Maintenance Schedule 289 kb 30/05/2023
Hydrobrake Design Details 180 kb 30/05/2023
Hydrobrake Design Drawing 313 kb 30/05/2023
Polystorm R Modular Cell Data Sheet 680 kb 30/05/2023
Polystorm Water Management Systems 247 kb 30/05/2023
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor C Brady (KIRKLEATHAM) 12/04/2023 -
Councillor L Quartermain (KIRKLEATHAM) 12/04/2023 -
Councillor M Lockwood (KIRKLEATHAM) 12/04/2023 -
Engineering Team (Highways) 12/04/2023 -
Engineers (Local Lead Flood Authority) 12/04/2023 -
Engineers (Local Lead Flood Authority) 30/05/2023 -
Environmental Protection Team 12/04/2023 -
Environmental Protection Team 12/04/2023 -
Northumbrian Water Ltd 12/04/2023 -