Location
YORK POTASH HARBOUR FACILITIES ORDER 2016 (AS AMENDED)
Proposal
SUBMISSION OF DETAILS FOR DISCHARGE OF REQUIREMENTS 2 (DETAILED DESIGN APPROVAL), 6 (CEMP), 7 (CTMP), 8 (GAS MONITORING), 9 (ECOLOGICAL MANAGEMENT) AND 10 (ARCHAEOLOGY) IN RELATION TO PHASE 1A FOR THE YORK POTASH HARBOUR FACILITIES ORDER 2016 (AS AMENDED)
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
ANGLO AMERICAN WOODSMITH LTD
Applicant's Address
MR ROBERT STANILAND
C/O LICHFIELDS
15 ST PAUL'S STREET
LEEDS
LS1 2JG
Agent
Lichfields
Agent's Address
MR JAMES COX
15 ST PAUL'S STREET
LEEDS
LS1 2JG
Agent's work phone
Agent's email
Case Officer
Mrs C Griffiths
Case Officer Telephone
01287 612629
Case Officer Email
claire.griffiths@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
12/12/2022
Date Valid
12/12/2022
Expiry
21/03/2023
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
21/03/2023
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | (1) No part of phase 1 is to commence until a written scheme setting out all the component parts of phase 1 has been submitted to and approved by the local planning authority. The written scheme must include details of the following unless they have been approved by the MMO under the provisions of Schedule 5 (deemed licence under the 2009 Act)— (a) layout; (b) details of quay structure and related infrastructure (including whether the open quay or solid quay is to be constructed); (c) external appearance and scale of all buildings and structures; (d) parking and storage areas; (e) surface and foul drainage; (f) site levels; (g) permanent fencing and other means of enclosure; and (h) lighting. (2) The phase 1 works must be carried out in accordance with the approved details, whether approved by the local planning authority under sub-paragraph (1) or the MMO under the provisions of Schedule 5. (3) No part of phase 1 is to commence until the design of the external treatment of that part of the conveyor crossing the A1085 has been approved by the local planning authority and that part of the conveyor crossing the A1085 must be constructed in accordance with the approved details. |
| 2 | (1) No phase of the authorised development is to commence, including any preparatory earthworks or site levelling but excluding ecological mitigation works, until a Construction Environmental Management Plan (“CEMP”) for that phase of the development, drafted in accordance with the principles set out in the outline construction environmental management plan and incorporating the mitigation identified in the governance tracker, has been submitted to and approved by the local planning authority in consultation with Natural England. The plan must include details of the following unless they have been approved by the MMO under the provisions of Schedule 5 (deemed licence under the 2009 Act)— (a) a stakeholder communications plan; (b) details of the methods to control noise arising from construction activities (including temporary acoustic fencing); (c) details of the methods to be used to control dust and other emissions from the site including a Dust Management Plan; (d) details of all temporary fencing, temporary buildings, compound areas and parking areas including arrangements for their removal following completion of construction; (e) details of areas to be used for the storage of plant and construction materials and waste; (f) details of the facilities to be provided for the storage of fuel, oil and other chemicals, including measures to prevent pollution; (g) details of any temporary lighting arrangements such detail to incorporate measures described in item 31 of the governance tracker; (h) measures to ensure that construction vehicles do not deposit mud on any highway; (i) details of mitigation measures to protect biodiversity interests within the site and adjacent to it during the construction phases; (j) advisory signage at public access points advising of possible hazards including the potential for sudden noise; (k) asbestos management strategy (if needed); and (l) a materials management plan. (2) The CEMP may be amended in accordance with article 37(2) (approvals pursuant to requirements etc.) provided that such amendment does not diminish the mitigation during construction referred to in the environmental statement. (3) All construction works must be carried out in accordance with the CEMP as approved from time to time. |
| 3 | None of the authorised development is to commence (excluding ecological mitigation or enhancement works referred to in the outline ecological management plan) until a Construction Traffic Management Plan (“CTMP”) drafted in accordance with the principles set out in Appendix 12.3 of the environmental statement has been submitted to and approved by the local planning authority. The provisions of the approved CTMP must be observed at all times during the construction of the authorised development. |
| 4 | 8.—(1) No building comprising part of the authorised development is to be occupied until a flood warning and evacuation plan, which must include details of expected means of evacuation or safe refuge during a tidal flood event with safe refuge areas has been submitted to and approved by the local planning authority. (2) No phase of the authorised development is to commence until a programme for ground gas monitoring has been agreed with the local planning authority and subsequently implemented. If the monitoring in accordance with the approved scheme gives rise to the need to consider gas protection measures within buildings, these must be agreed with the local planning authority and implemented as agreed. |
| 5 | 9.—(1) No phase of the authorised development is to commence until written ecological management plans for any ecological mitigation or enhancement measures included in the environmental statement for that phase (including a marine mammal mitigation plan but not including the lagoon habitat enhancement works which are licensed under the DML), drafted in accordance with the principles set out in the outline ecological management plan, and incorporating the mitigation identified in the governance tracker have been submitted to and approved by the local planning authority and the MMO in consultation with Natural England and the Environment Agency. (2) The ecological management plans must be implemented as approved but may be subject to amendment in accordance with article 37(2) (approvals pursuant to requirements etc.). If amendments to any ecological enhancement or mitigation measures are proposed below the level of high water, the amendments are to be approved by the local planning authority and the MMO in consultation with Natural England and the Environment Agency. (3) Prior to the decommissioning phase of the authorised development, terrestrial ecological surveys are to be undertaken to verify whether any protected species could be impacted by the decommissioning phase, and to identify any requirement for mitigation to be implemented in order to avoid any adverse impacts. The scope of terrestrial ecological surveys is to be agreed with the local planning authority in consultation with Natural England prior to any ecological surveys being undertaken and, following the surveys, the scope of mitigation including an implementation timetable is to be agreed by the local planning authority in consultation with Natural England. The agreed mitigation must be carried out as agreed. |
| 6 | 10.—(1) No development is to take place until a programme of archaeological work including a written scheme of investigation has been submitted to and approved by the local planning authority. The scheme must provide for monitoring in the vicinity of the “Deserted Medieval Village of West Coatham”. The scheme must include an assessment of significance and research questions and— (a) the programme and methodology of site investigation and recording; 33 (b) the programme for post investigation assessment; (c) provision to be made for analysis of the site investigation and recording; (d) provision to be made for publication and dissemination of the analysis and records of the site investigation; (e) provision to be made for archive deposition of the analysis and records of the site investigation; and (f) nomination of a competent person or organisation to undertake the works set out within the written scheme of investigation. (2) No development is to take place other than in accordance with the written scheme of investigation approved under sub-paragraph (1). (3) The authorised development must not be occupied until the site investigation and postinvestigation assessment has been completed in accordance with the programme set out in the written scheme of investigation approved under sub-paragraph (1) and the provision made for analysis, publication and dissemination of results and archive deposition has been secured. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineering Team (Highways) | 13/12/2022 | - |
| Environment Agency | 31/01/2023 | - |
| Environmental Protection Team | 13/12/2022 | - |
| Marine Management Organisation | 06/01/2023 | - |
| Natural England | 13/12/2022 | - |
| Natural Heritage Manager | 13/12/2022 | - |
| NEAR Ltd (Archaeological Services) | 13/12/2022 | - |