R/2022/0857/CD

Planning Application Details - Official Consultation has expired.

Location
BRITISH STEEL (SPECIAL PROFILES) BEACH ROAD SKINNINGROVE
Proposal
DISCHARGE OF CONDITIONS 3 (LLFA1 - PRE COMMENCEMENT), 5 (LLFA3) AND 7 (ASBESTOS) OF PLANNING PERMISSION R/2022/0150/FFM FOR THE ERECTION OF TWO STOREY OFFICE BLOCK, 2 SINGLE STOREY INDUSTRIAL BUILDINGS AND EXTENSION TO EXISTING WAREHOUSE INCLUDING TRAILER/LORRY PARKS, LANDSCAPING AND 2.4M HIGH PERIM...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Loftus CP Skelton and Brotton CP
Applicant
BRITISH STEEL - SPECIAL PROFILES
Applicant's Address
MR STUART WEBSTER BRITISH STEEL (SPECIAL PROFILES) BEACH ROAD SKINNINGROVE SR4 6DR
Agent
Building Design Northern
Agent's Address
MR JOE WARNER THE OLD SCHOOL HOUSE SUNDERLAND SR4 6DR
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
27/10/2022
Date Valid
27/10/2022
Expiry
31/03/2023
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
09/03/2023
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
2 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
3 Prior to the development being brought into permitted end use, the developer must submit an asbestos mitigation plan to reduce risks to potential workers, neighbours and other offsite receptors. Reason : To ensure that risks from asbestos to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 221 kb 27/10/2022
Consultee Responses
Consultee response - Parish/Town Council 651 kb 16/11/2022
Consultee response - Environmental Protection (Contaminated Land) 15 kb 17/11/2022
Consultee response - Engineers (Local Lead Flood Authority) 454 kb 24/11/2022
Consultee response - Northumbrian Water 51 kb 14/12/2022
Consultee response - Engineers (Local Lead Flood Authority) 804 kb 20/02/2023
Decision
Decision Notice 633 kb 09/03/2023
Officer Report
Officer Report 555 kb 09/03/2023
Supporting Documentation
Condition 3 - Proposed Drainage Arrangement 955 kb 27/10/2022
Condition 5 - Suds Management And Maintenance Plan 4918 kb 27/10/2022
Condition 5 - Suds Surface Water Drainage Management Plan 252 kb 27/10/2022
Condition 7 - Asbestos Management Plan 1182 kb 27/10/2022
Condition 7 - Asbestos: Procedure for Management of Asbestos Containing Materials 456 kb 27/10/2022
Location Plan 475 kb 27/10/2022
Proposed Site Plan 1182 kb 27/10/2022
Condition 3 - Culvert Map 1201 kb 26/01/2023
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor B Hunt (BROTTON) 27/10/2022 -
Councillor G Cutler (BROTTON) 27/10/2022 -
Councillor M Fletcher (BROTTON) 27/10/2022 -
Engineers (Local Lead Flood Authority) 26/01/2023 -
Engineers (Local Lead Flood Authority) 27/10/2022 -
Environmental Protection Team 27/10/2022 -