Location
FORMER REDCAR STEELWORKS (TEESWORKS)
LAND TO WEST OF WARRENBY
REDCAR
Proposal
DISCHARGE OF CONDITIONS 3 (CEMP) & 6 (LAND CONTAMINATION) OF PLANNING PERMISSION R/2021/1048/FFM FOR ENGINEERING OPERATIONS ASSOCIATED WITH GROUND REMEDIATION AND PREPARATION OF THE SITE
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
SOUTH TEES DEVELOPMENT CORPORATION
Applicant's Address
- - -
CAVENDISH HOUSE
TEESDALE BUSINESS PARK
STOCKTON ON TEES
TS17 6QY
Agent
Lichfields
Agent's Address
MISS RACHEL DODD
THE ST NICHOLAS BUILDING
ST NICHOLAS STREET
NEWCASTLE UPON TYNE
NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
14/09/2022
Date Valid
14/09/2022
Expiry
09/11/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
17/10/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | No phase of development shall take place until a Construction Environmental Management Plan (CEMP) for that phase of the development has been submitted to and approved in writing by the Local Planning Authority. The approved CEMP shall be adhered to throughout the construction period of that phase. The CEMP shall include details of any phasing of the approved works across the site and shall demonstrate how the mitigation measures set out in the Ecological Impact Assessment, INCA, dated November 2021 have been incorporated in the construction methods. The CEMP shall also include the following details: i The method to be used to control the emission of dust, noise and vibration from construction works, including any details of any mitigation measures required; ii Measures to control the deposit of mud and debris on adjoining public highways iii Site fencing and security iv Temporary contractors’ buildings, plant, storage of materials, lighting and parking for site operatives v The use of temporary generators vi The arrangement or turning of vehicles within the site so that they may enter and leave in forward gear vii A risk assessment of construction activities with potentially damaging effects on local ecological receptors including any measures to protect those receptors during construction viii Roles and responsibilities for the implementation of the CEMP requirements and measures. ix Measures to control invasive plant species x Measures to control surface water and other water generated as part of the works REASON: In the interest of neighbour amenity, highways safety and protection of sites of ecological value in accordance with policies SD4 and N4 of the Redcar and Cleveland Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to construction details which are often the first works on site and relate to site preparation. |
| 2 | The development within the application boundary (with the exception of the areas outlined in Blue on the submitted 'Net Zero Data Gaps' plan - Plan Ref. No. 10035117-AUK[1]XX-XX-DR-ZZ-0508-01- Net_Zero_Plot_Data_Gaps) shall be implemented in accordance with the measures set out in the submitted Enabling Earthworks and Remediation Strategy Report (Report Ref: 10035117-AUK-XX-XXRP-ZZ-0417-03). That Remediation Strategy Report shall be subject to independent review through the National Quality Mark Scheme. Should that review result in amendments being necessary, a revised Strategy Report shall be submitted and approved by the local planning authority and development carried out in accordance with it. Reason To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers and other offsite receptors, in accordance with the Local Plan and the National Planning Policy Framework. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 220 kb | 14/09/2022 | |
| Consultee Responses | |||
| Consultee response - Environmental Protection (Contaminated Land) | 14 kb | 04/10/2022 | |
| Consultee response - Environmental Protection (Nuisance) | 14 kb | 04/10/2022 | |
| Consultee response - Engineering Team (Highways) | 687 kb | 17/10/2022 | |
| Decision | |||
| Compliance Decision Notice | 457 kb | 17/10/2022 | |
| Officer Report | |||
| Compliance Officer Report | 323 kb | 17/10/2022 | |
| Supporting Documentation | |||
| Condition 3 - Cemp Site Preparation Remediation Works | 4410 kb | 14/09/2022 | |
| Covering Letter | 207 kb | 14/09/2022 | |
| Condition 6 - Remediation Strategy | 13947 kb | 14/09/2022 | |
| Condition 6 - Contaminated land Quantiative Risk Assessment | 126827 kb | 14/09/2022 | |
| Condition 6 - Environmental Assessment Phase 1 | 106120 kb | 14/09/2022 | |
| Condition 6 - Land Contamination Desk Top Study | 101337 kb | 14/09/2022 | |
| Decision Notice R/2021/1048/FFM | 963 kb | 14/09/2022 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Councillor S Jeffrey (SOUTH BANK) | 14/09/2022 | - |
| Councillor Sandra Smith (SOUTH BANK) | 14/09/2022 | - |
| Engineering Team (Highways) | 14/09/2022 | - |
| Environmental Protection Team | 14/09/2022 | - |