R/2022/0659/CD

Planning Application Details - Official Consultation has expired.

Location
PICKERINGS PLANT LTD JOHN BOYLE ROAD SOUTH BANK MIDDLESBROUGH TS6 6TY
Proposal
DISCHARGE OF CONDITIONS 3 (SURFACE WATER DRAINAGE SCHEME); 5 (REMEDIATION SCHEME) & 6 (IMPLEMENTATION OF REMEDIATION SCHEME) OF PLANNING PERMISSION R/2022/0243/FF FOR DETACHED STORAGE FACILITY BUILDING; DETACHED MODULAR OFFICE BUILDING WITH ASSOCIATED CAR PARKING AND CONCRETE LOADING PAD (PART RETR...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
PICKERINGS HIRE LTD
Applicant's Address
MR HARVINDER HAYER PICKERINGS HIRE LTD ASHBY ROAD MEASHAM SWADLINCOTE DE12 7JW
Agent
STOAS Architects Ltd
Agent's Address
MR OMAR SHARIFF THE LODGE COSEHILL MANOR SOUTH DRIVE BIRMINGHAM B46 1DL
Agent's work phone
Agent's email
Case Officer
Mr K Robinson
Case Officer Telephone
01287 612445
Case Officer Email
kevin.robinson@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
10/08/2022
Date Valid
10/08/2022
Expiry
13/10/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
12/10/2022
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
2 Prior to the erection of the storage facility building or siting of the modular office a detailed remediation scheme including hydrocarbon resistant gas membrane, to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. Reason : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
3 The approved remediation must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. Reason : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 218 kb 10/08/2022
Consultee Responses
Consultee response - Engineers (Local Lead Flood Authority) 455 kb 19/08/2022
Consultee response - Environmental Protection (Contaminated Land) 16 kb 01/09/2022
Consultee response - Environmental Protection (Contaminated Land) 194 kb 03/10/2022
Decision
Decision Notice 460 kb 12/10/2022
Officer Report
Officer Report 327 kb 12/10/2022
Supporting Documentation
Condition 3 - Exceedance Flow Routing 297 kb 10/08/2022
Condition 3 - SW Design Existing Network 26 05 2022 806 kb 10/08/2022
Condition 3 - SW Design Proposed Network 26 05 2022 1019 kb 10/08/2022
Condition 3 - 1 - 2 Year 30 Year and 100 Year Microdrainage Calcs 86 kb 10/08/2022
Condition 3 - 1 - 100 Year And 20percent Calcs 63 kb 10/08/2022
Condition 3 - Site Layout (final Construction Issue) 180 kb 10/08/2022
Condition 3 - External Works (final Construction Issue) 699 kb 10/08/2022
Condition 3 - Existing and Proposed Drainage Strategy 374 kb 10/08/2022
Condition 5 & 6 - Verification Plan 850 kb 10/08/2022
Condition 3 - Drainage Design Email 148 kb 10/08/2022
R/2022/0243/FF Decision Notice 212 kb 10/08/2022
Condition 5 - Proposed Ground Gas Membrane Details 336 kb 12/09/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor S Jeffrey (SOUTH BANK) 11/08/2022 -
Councillor Sandra Smith (SOUTH BANK) 11/08/2022 -
Engineers (Local Lead Flood Authority) 11/08/2022 -
Environmental Protection Team 11/08/2022 -
Environmental Protection Team 12/09/2022 -
South Tees Development Company 11/08/2022 -