Location
FORMER LUKE SENIOR
PARK LANE
GUISBOROUGH
Proposal
DISCHARGE OF CONDITION 5 (BIODIVERSITY), 7 (CEMP), 8 DRAINAGE), 10 (EV CHARGING) & 11 (MATERIALS) OF PLANNING PERMISSION R/2021/0737/FFM FOR RESIDENTIAL DEVELOPMENT COMPRISING 9 NO. SUPPORTED, INDEPENDENT-LIVING APARTMENTS, COMMUNAL HUB (CONVERTIBLE INTO A 1B2P APARTMENT) AND 10 NO. QUARTER HOUSES...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Guisborough CP
Applicant
BEYOND HOUSING
Applicant's Address
MS ELAINE DANCE
14 ENNIS SQUARE
DORMANSTOWN
REDCAR
TS10 5JR
Agent
BSBA Architects
Agent's Address
MR ANDREW MITTON
19 WOODLAND ROAD
DARLINGTON
DL3 7BJ
Agent's work phone
Agent's email
Case Officer
Mr A Miller
Case Officer Telephone
01287 612454
Case Officer Email
Adrian.Miller@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
03/08/2022
Date Valid
03/08/2022
Expiry
28/09/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
01/09/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | No development (except for site preparation works and the formation of a site compound) shall take place until details have been submitted and approved of a biodiversity enhancement plan. The plan shall confirm those measures or design elements to be incorporated in the development which reflect the conclusions of the Preliminary Ecological Appraisal Report and the development shall be completed in accordance with the approved plan. REASON; To mitigate the ecological impacts of the development and to provide for biodiversity enhancement on site consistent with the recommendations of the Preliminary Ecological Appraisal Report. |
| 2 | Prior to commencement of development, a Construction Environment Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide details of the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) Wheel washing facilities; v) Measures to control the emission of noise dust and vibration during the construction period. vi) A scheme for recycling/disposing of waste resulting from demolition and construction works. REASON: To protect the amenity of nearby residents and in the interests of highway safety. |
| 3 | The development shall be implemented in accordance with the drainage scheme contained within the submitted document entitled Proposed Drainage Layout (Dwg No. 001-01) received by the Local Planning Authority on 25/08/21. The drainage scheme shall ensure that foul and surface water flows discharge to the combined sewer at manhole 0132. The surface water discharge rate shall not exceed 3 l/sec. The final surface water discharge rate shall be agreed by the Lead Local Flood Authority. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. |
| 4 | The development shall make provision for at least one EV charging point in one of the parking bays shown on the approved plans REASON; To ensure the provision of an EV charging facility for the use of electric vehicles to promote a sustainable development in accordance with development plan policy. |
| 5 | Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission (including samples) shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 220 kb | 03/08/2022 | |
| Consultee Responses | |||
| Consultee response - Natural Heritage Manager | 448 kb | 04/08/2022 | |
| Consultee response - Environmental Protection (Nuisance) | 13 kb | 12/08/2022 | |
| Consultee response - Engineers (Local Lead Flood Authority) | 453 kb | 19/08/2022 | |
| Decision | |||
| Decision Notice | 460 kb | 01/09/2022 | |
| Officer Report | |||
| Officer Report | 340 kb | 01/09/2022 | |
| Supporting Documentation | |||
| Conidition 11 - Materials | 572 kb | 03/08/2022 | |
| Site Plan | 3948 kb | 03/08/2022 | |
| Condition 8 - Drainage | 846 kb | 03/08/2022 | |
| Condition 7 - Construction Management Plan | 634 kb | 03/08/2022 | |
| Condition 7 - Construction Management Plan | 420 kb | 03/08/2022 | |
| Condition 5 - Biodiversity | 301 kb | 03/08/2022 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Councillor A Hixon (GUISBOROUGH) | 03/08/2022 | - |
| Councillor B Clarke (GUISBOROUGH) | 03/08/2022 | - |
| Councillor S Holyoake (GUISBOROUGH) | 03/08/2022 | - |
| Engineering Team (Highways) | 03/08/2022 | - |
| Engineers (Local Lead Flood Authority) | 03/08/2022 | - |
| Environmental Protection Team | 03/08/2022 | - |
| Natural Heritage Manager | 03/08/2022 | - |
| Northumbrian Water Ltd | 03/08/2022 | - |