Location
CLEVELAND GATE
LAND WEST OF SPRING WOOD ROAD
GUISBOROUGH
Proposal
DISCHARGE OF CONDITIONS 6 (LEVELS), 7 (DRAINAGE) AND 8 (CEMP) OF PLANNING PERMISSION R/2021/0792/FFM FOR ERECTION OF EXTRA CARE LIVING SCHEME COMPRISING OF A 3 STOREY BLOCK OF 71 APARTMENTS WITH COMMUNAL FACILITIES, 12 SEMI-DETACHED BUNGALOWS, FORMATION OF ASSOCIATED ACCESS, LANDSCAPING AND PARKING
Application Type
Condition Discharge
Status
Approved
Parish(es)
Guisborough CP
Applicant
VISTRY PARTNERSHIPS
Applicant's Address
2 ESH PLAZA
SIR BOBBY ROBSON WAY
GREAT PARK
NEWCASTLE UPON TYNE
NE13 9BA
Agent
VISTRY PARTNERSHIPS
Agent's Address
2 ESH PLAZA
SIR BOBBY ROBSON WAY
GREAT PARK
NEWCASTLE UPON TYNE
NE13 9BA
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
06/06/2022
Date Valid
14/06/2022
Expiry
09/08/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
02/08/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | Prior to the commencement of development plans showing the existing and proposed ground levels over the site together with finished floor levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as construction activity and site preparation can change existing levels resulting in increased ground levels which the authority needs to consider. |
| 2 | Development shall not commence until a detailed scheme for the disposal of foul water and surface water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. |
| 3 | Prior to commencement of construction, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) The erection and maintenance of security hoarding including decorative displays; v) Wheel washing facilities; vi) Measures to control the emission of noise dust and vibration during the construction period. vii) A scheme for recycling/disposing of waste resulting from demolition and construction works. REASON: To protect the amenity of nearby residents and in the interests of highway safety. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Councillor A Hixon (GUISBOROUGH) | 15/06/2022 | - |
| Councillor B Clarke (GUISBOROUGH) | 15/06/2022 | - |
| Councillor S Holyoake (GUISBOROUGH) | 15/06/2022 | - |
| Engineering Team (Highways) | 28/06/2022 | - |
| Engineers (Local Lead Flood Authority) | 15/06/2022 | - |
| Environmental Protection Team | 15/06/2022 | - |
| Natural England | 15/06/2022 | - |
| Natural Heritage Manager | 15/06/2022 | - |
| Northumbrian Water Ltd | 15/06/2022 | - |