Location
LAND AT SOUTH TEES DEVELOPMENT CORPORATION
EAST OF SMITHS DOCK ROAD AND WEST OF TEES DOCK ROAD
SOUTH BANK
Proposal
PARTIAL DISCHARGE OF CONDITIONS 12 (DRAINAGE), 13 (FOUL AND SURFACE WATER) AND 32 (LEVELS) OF PLANNING PERMISSION R/2020/0357/OOM FOR OUTLINE PLANNING APPLICATION FOR DEMOLITION OF EXISTING STRUCTURES ON SITE AND THE DEVELOPMENT OF UP TO 418,000 SQM (GROSS) OF GENERAL INDUSTRY (USE CLASS B2) AND ...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
SOUTH TEES DEVELOPMENT CORPORATION
Applicant's Address
MR JOHN MCNICHOLAS
CAVENDISH HOUSE
TEESDALE BUSINESS PARK
STOCKTON ON TEES
TS17 6QY
Agent
Lichfields
Agent's Address
MRS JUSTINE MATCHETT
ST NICHOLAS BUILDING
ST NICHOLAS STREET
NEWCASTLE UPON TYNE
NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
19/04/2022
Date Valid
19/04/2022
Expiry
14/06/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
14/06/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | Prior to the commencement of the development, or in accordance with the phasing plan agreed through discharge of condition 4, details shall be submitted to and approved in writing by the Local Planning Authority of the Surface Water Management and Maintenance Plan, unless otherwise agreed in writing Thereafter it shall be implemented in accordance with the approved details. REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme which is appropriately maintained and to minimise the risk flooding and contamination of the system during the construction process and in the locality minimise.” REASON FOR PRE-COMMENCEMENT: A pre-commencement condition is required to ensure that excavations and groundworks do not compromise the installation of the approved surface water drainage infrastructure. |
| 2 | Prior to the commencement of the development, or in accordance with the phasing plan agreed through discharge of condition 4, a detailed scheme for the disposal of foul and surface water from the development hereby approved shall be submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. REASON FOR PRE-COMMENCEMENT: A pre-commencement condition is required to ensure that excavations and groundworks do not compromise the installation of the approved surface water or foul drainage infrastructure. |
| 3 | Prior to the commencement of development or in accordance with the phasing plan agreed through the discharge of condition 4 final details shall be agreed of the finished floor levels of the development and the development completed in accordance with the approved details. REASON: To confirm the finished floor level of the development in the light of any necessary groundworks to meet the requirement of other planning conditions and confirm the overall height of the final scheme in the context of the information provided in the Environmental Statement. REASON FOR PRE-COMMENCEMENT: A pre-commencement condition is required so that the final agreed levels for the site are not compromised by the start of groundworks. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 218 kb | 19/04/2022 | |
| Covering Letter | 152 kb | 19/04/2022 | |
| Consultee Responses | |||
| Consultee response - Northumbrian Water | 52 kb | 11/05/2022 | |
| Consultee response - Engineers (Local Lead Flood Authority) | 49 kb | 27/05/2022 | |
| Decision | |||
| Decision Notice | 539 kb | 14/06/2022 | |
| Officer Report | |||
| Officer Report | 403 kb | 14/06/2022 | |
| Plans | |||
| Condition No. 32 - Contours and Levels Overview | 4620 kb | 19/04/2022 | |
| Condition No.12 - Drainage Strategy Layout | 2837 kb | 19/04/2022 | |
| Supporting Documentation | |||
| Condition No.12 - Drainage Strategy | 9867 kb | 19/04/2022 | |
| Condition No.13 - Surface Water and Foul Water Operation And Maintenance Manual | 3832 kb | 19/04/2022 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Councillor S Jeffrey (SOUTH BANK) | 26/04/2022 | - |
| Councillor Sandra Smith (SOUTH BANK) | 26/04/2022 | - |
| Engineers (Local Lead Flood Authority) | 26/04/2022 | - |
| Northumbrian Water Ltd | 26/04/2022 | - |