Location
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
RESUBMISSION OF DETAILS FOR REQUIREMENT 20 (DETAILED DESIGN APPROVAL ONSHORE) FOR STAGE 5 PART 2 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPEC...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
DOGGERBANK OFFSHORE WIND FARM PROJECT 3 PROJCO LIM
Applicant's Address
- -
1 FORBURY PLACE
43 FORBURY ROAD
READING
RG1 3JH
Agent
Arcus Consultancy Services
Agent's Address
MR TIM WHEELER
SUITE 1C
SWINEGATE COURT EAST
3 SWINEGATE
YORK
YO1 8AJ
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
04/04/2022
Date Valid
05/04/2022
Expiry
31/05/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
12/05/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | Requirement 20 (1) Except where a stage of the onshore works (or part thereof) is/are carried out in accordance with the plans referred to in Requirement 19, no stage of the onshore works may commence until details of the layout, scale, levels and external appearance (in so far as those details are not shown on those plans) for the relevant stage have been submitted to and approved by the relevant planning authority. Where the relevant stage includes all or any part of Work Nos. 4A, 5A, 4B or 5B, this must include a section showing cable depths for Work Nos. 4A, 5A, 4B or 5B as appropriate (2) No building forming part of Work No. 7 may exceed 20 metres in height above the floor level for that location, excluding lightning protection. (3) For the avoidance of doubt (and to the extent that such works are not carried out in accordance with the plans referred to in Requirement 19 and therefore require approval)— (a) in relation to Work No. 7, the relevant planning authority may approve— (i) the detailed design for the Project A converter station works and the Project B converter station works as separate stages (or part thereof); and (ii) the detailed design for the Project A converter station enabling works and the Project B converter station enabling works as either separate stages (or part thereof) or as a single stage (or part thereof) comprising the Work No.7 enabling works; (b) in relation to Work No. 8S, the relevant planning authority may approve the detailed design for the Project A HVAC cable works and the Project B HVAC cable works as either separate stages (or part thereof) or the same stage (or part thereof); (c) in relation to Work No. 9, the relevant planning authority may approve the detailed design for the Project A National Grid substation connection works and the Project B National Grid substation connection works as either separate stages (or part thereof) or the same stage (or part thereof); (d) in relation to Work Nos. 2A, 2B, 3A, 3B, 4A, 4B, 5A, 5B, 6A, 6B, 8A, 8B and 8S the relevant planning authority may approve the detailed design of the cable preparation works as a separate stage (or part thereof); and (4) The details approved under paragraph (1) may cover one or more stages of the onshore works.” |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 220 kb | 04/04/2022 | |
| Covering Letter | 196 kb | 04/04/2022 | |
| Decision | |||
| Compliance Decision Notice R20220322cd | 132 kb | 12/05/2022 | |
| Supporting Documentation | |||
| Requirement 20 - Preliminary Drill Site Arrangement Bs Rev03 Extended Area | 305 kb | 04/04/2022 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 06/04/2022 | - |