R/2022/0313/CD

Planning Application Details - Official Consultation has expired.

Location
LAND SOUTH OF SPENCERBECK FARM NORMANBY ROAD ORMESBY
Proposal
DISCHARGE OF CONDITIONS 01 (RESERVED MATTERS); 03 (LANDSCAPING); 05 (EXTERNAL MATERIALS); 06 (HARD SURFACE MATERIALS); 08(A) & (B) (CONTAMINATION); 09 (CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN); 10 (LEVELS); 11 (SURFACE WATER DRAINAGE); 13 (SURFACE WATER DRAINAGE); & 14 (FOUL WATER DRAINAGE) OF OU...
Application Type
Condition Discharge
Status
Withdrawn
Parish(es)
Applicant
LOVELL PARTNERSHIPS LTD
Applicant's Address
MR DAVID ATKINSON METROPOLITAN HOUSE LONG RIGG ROAD SWALWELL NE16 3AS
Agent
LOVELL PARTNERSHIPS LTD
Agent's Address
MR DAVID ATKINSON METROPOLITAN HOUSE LONG RIGG ROAD SWALWELL NE16 3AS
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
01/04/2022
Date Valid
01/04/2022
Expiry
27/05/2022
Consultation Expiry
-
associated_bldreg
-
Decision
WITHDRAWN
Decision Date
16/05/2024
Decision Level
-

Conditions table
# Condition Details
1 Details of the appearance, landscaping, layout and scale, (hereinafter called "the reserved matters") shall be submitted to and approved in writing by the Local Planning Authority before the expiration of three years from the date of this permission. REASON: To reserve the rights of the Local Planning Authority with regard to these matters and required to be imposed pursuant to Sections 91 and 92 of the Planning & Compulsory Purchase Act 2004.
2 Prior to occupation of the first completed dwelling on the site a landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The details shall include size, type and species and a programme of work. The development shall be completed in accordance with the approved details. REASON: To ensure that the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
3 Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission (including samples) shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
4 Prior to the construction of the final surface treatment, for any hard surfaced areas, details of the materials to be used shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
5 Unless otherwise agreed by the Local Planning Authority in writing, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts (a) to (c) have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until condition (e) has been complied with in relation to that contamination. (a) Site Characterisation An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to: • human health, • property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, • adjoining land, • groundwaters and surface waters, • ecological systems, • archeological sites and ancient monuments; (iii) an appraisal of remedial options, and proposal of the preferred option(s). This must be conducted in accordance with Environment Agency’s Land Contamination Risk Management Guidance (b) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.
6 Prior to construction of foundations on site a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) The erection and maintenance of security hoarding including decorative displays; v) Wheel washing facilities; vi) Measures to control the emission of noise dust and vibration during the construction period. vii) A scheme for recycling/disposing of waste resulting from demolition and construction works. REASON: In the interest of neighbour amenity and highways safety and in accordance with policy SD4 of the Redcar and Cleveland Local Plan.
7 Prior to the commencement of development plans showing the existing and proposed ground levels over the site together with finished floor levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as construction activity and site preparation can change existing levels resulting in increased ground levels which the authority needs to consider.
8 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
9 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
10 Development shall not commence until a detailed scheme for the disposal of foul water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to drainage details which are often the first works on site and relate to site preparation.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 218 kb 01/04/2022
Consultee Responses
Consultee response - Environmental Protection (Contaminated Land) 192 kb 08/04/2022
Consultee response - Environmental Protection (Nuisance) 195 kb 11/04/2022
Consultee response - Engineers (Local Lead Flood Authority) 48 kb 27/05/2022
Consultee response - Engineering Team (Highways) 452 kb 09/06/2022
Supporting Documentation
Condition 5 - Materials External - Celuform Fascias (white) (redacted) 981 kb 01/04/2022
Condition 5 - Materials External - Ibstock Chillingham Blend Brick 29 kb 01/04/2022
Condition 5 - Materials External - Ig Doors (black) 2535 kb 01/04/2022
Condition 5 - Materials External - Munster Joinery Upvc Windows (white) 712 kb 01/04/2022
Condition 5 - Materials External - Russell Tiles Grampian Interlocking Tile (slate Grey) 1415 kb 01/04/2022
Condition 5 - Materials External - Russell Tiles Pennine Cottage Pantile (cottage Red) 2300 kb 01/04/2022
Condition 5 - Materials External - Wavin Squareline Only (black) Product Literature (redacted) 5280 kb 01/04/2022
Condition 8 - Contaminated Land (b) Submission Of Remediation Scheme 1489 kb 01/04/2022
Condition 8 - Contaminated Land (a) Site Characterisation (part 1of2) 9782 kb 01/04/2022
Condition 8 - Contaminated Land (a) Site Characterisation (part 2of2) 8627 kb 01/04/2022
Condition 9 - Project Management Plan (incl CEMP) 2908 kb 01/04/2022
CondItion 11; 13 - LLFA - D204 Flood Routing Plan Rev 1 1082 kb 01/04/2022
Condition 1, 5 - Reserved matters Proposed Site Plan 2451 kb 01/04/2022
Condition 1, 10 - Proposed Levels 556 kb 01/04/2022
Condition 1- Reserved matters - Setting Out 381 kb 01/04/2022
Condition 1, 3 - Landscaping Plan 965 kb 01/04/2022
Condition 6 - Materials Hard Surface - D500 Surfacing Plan Rev 3 409 kb 01/04/2022
Condition 6 - Materials Hard Surface - D700 Road Construction Details Rev 2 324 kb 01/04/2022
Condition 9 - CEMP - Spencerbeck Lovell Compound 1to200(a3) Rev D 789 kb 01/04/2022
Condition 10 - Levels - PRE COMMENCEMENT - D600 Cut & Fill Direct Comparison Rev 2 1306 kb 01/04/2022
Condition 10 - Levels - PRE COMMENCEMENT - House Types Elevations Only 4866 kb 01/04/2022
Condition 10 - Levels - PRE COMMENCEMENT - Topographical Survey Existing Levels 1252 kb 01/04/2022
Condition 11; 13; 14 - LLFA - D001 Engineering Plan Rev 4 1158 kb 01/04/2022
Condition 11; 13; 14 - LLFA - D002 Drainage Strategy Rev 1 731 kb 01/04/2022
Condition 11; 13; 14 - LLFA - D200 Proposed Drainage Rev 3 1091 kb 01/04/2022
Condition 11; 13 - LLFA - D202 Private Storm Manhole Schedule Rev 1 100 kb 01/04/2022
Condition 11; 14 - LLFA - D203 Private Foul Manhole Schedule Rev 2 99 kb 01/04/2022
Condition 11; 14 - LLFA - D701 Drainage Construction Details Rev 1 435 kb 01/04/2022
Condition 11; 13; 14 - LLFA - D801 Section 104 Plan Rev 1 1226 kb 01/04/2022
Document & Drawing List 526 kb 01/04/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor B Ayre (NORMANBY) 01/04/2022 -
Councillor C Foley-McCormack (NORMANBY) 01/04/2022 -
Councillor C Gallacher (NORMANBY) 01/04/2022 -
Engineering Team (Highways) 01/04/2022 -
Engineers (Local Lead Flood Authority) 01/04/2022 -
Environmental Protection Team 01/04/2022 -
Northumbrian Water Ltd 01/04/2022 -