R/2022/0309/CD

Planning Application Details - Official Consultation has expired.

Location
LAND ALONG DOGGER BANK C ONSHORE CONVERTER STATION AND ASSOCIATED WORKS NEAR LACKENBY NATIONAL GRID SUBSTATION
Proposal
SUBMISSION OF DETAILS FOR REQUIREMENT 24 (HIGHWAYS ACCESS MANAGEMENT PLAN) FOR STAGE 9 OF THE ONSHORE WORKS FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPM...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
DOGGER BANK OFFSHORE WIND FARM PROJECT 3 PROJCO LI
Applicant's Address
SOPHIE DICKSON 1 FORBURY PLACE 43 FORBURY ROAD READING RG1 3JH
Agent
Royal HaskoningDHV
Agent's Address
CLAIRE DAVIES ROYAL HASKONING D H V 53 PORTLAND STREET MANCHESTER M1 3LF
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
31/03/2022
Date Valid
31/03/2022
Expiry
26/05/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
10/05/2022
Decision Level
-

Conditions table
# Condition Details
1 (Highway accesses) 24.—(1) No stage of the onshore works may commence until, for that stage, written details of the siting, design, layout and any access management measures for any new permanent or temporary means of access to or from a public highway to be used by vehicular traffic, or any alteration to an existing means of access to or from a public highway used by vehicular traffic, has, after consultation with the highway authority, been submitted to and approved by the relevant planning authority. (2) No stage of the onshore works may commence until, for that stage, written details identifying the routes and accesses for operational maintenance has, following consultation with the highway authority, been submitted to and approved by the relevant planning authority. (3) All highway accesses must be constructed, maintained and removed in accordance with the approved details. (4) For the avoidance of doubt, each set of submitted details approved under paragraph (1) of this requirement may cover one or more stages of the onshore works. Approved Plans/Documents 1.Highways Access Management Plan (Dogger Bank C Reference: RE-PM763-ARCUS-00016 / Sofia Document Reference: 003757616-01) submitted to the Local Planning Authority on 8 December 2020. 2.Appendix 2.1 - Consent Boundaries – OSC Enabling Works - DB-T-DES-0046-02 Rev 03 Offshore Wind Farms – Consent Boundaries: Onshore Converter Station Enabling Works submitted to the Local Planning Authority on 8 December 2020 3.Appendix 2.2 - OCS Enabling Works Stages - DB-T-DES-0040-04 Rev 01 Dogger Bank C & Sofia Onshore Converter Station Enabling Work Stages submitted to the Local Planning Authority on 8 December 2020 4.Appendix 3.1 - Site Access Location Plan - SCP/190608/SK007 Rev B Sofia Offshore Wind Farm TA: Site Access Location Plan submitted to the Local Planning Authority on 8 December 2020 5.Appendix 3.2 - Layout Details and Constructional Specification - 60617518-ACM-XX-00-DR-CE-3005 Rev C Southern Access Road - Proposed Junction with Existing Access Road submitted to the Local Planning Authority on 8 December 2020 6.Appendix 3.3 - Swept Paths - 60617518-ACM-XX-00-DR-CE-3008 - Southern Access Road - Vehicle Tracking submitted to the Local Planning Authority on 8 December 2020 7.Appendix 4.1 - Directional Signing Strategy Masterplan - 190608-D01 Rev B Draft HCV/AIL Traffic Routing and Management Masterplan submitted to the Local Planning Authority on 8 December 2020 8.Appendix 4.2 - Directional Signing to Access 10I -190608-D04 Rev A HCV/AIL Traffic Routing and Temporary Traffic Management Stages 7, 8 and 10 submitted to the Local Planning Authority on 8 December 2020 9.Appendix 5.1 - Dilapidations Scoping Correspondence submitted to the Local Planning Authority on 8 December 2020

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 220 kb 31/03/2022
Consultee Responses
Consultee response - Engineering Team (Highways) 451 kb 28/04/2022
Decision
Compliance Decision Notice R20220309cd 131 kb 10/05/2022
Officer Report
Compliance Officer Report 133 kb 10/05/2022
Supporting Documentation
Requirement 24 - Covering Letter 306 kb 01/04/2022
Requirement 24 - Highways And Access Management Plan (hamp) DCO Stage 9 318 kb 31/03/2022
Requirement 24 - HAMP Appendices - 2.1, 2.2, 3.1, 4.1, 4.2 and 5.1 4462 kb 31/03/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Condition Discharge - David Pedlow 01/04/2022 -
Engineering Team (Highways) 01/04/2022 -