Location
DOGGER BANK WIND FARM C
ONSHORE CONVERTER STATION (OCS) AND ASSOCIATED WORKS NEAR LACKENBY NATIONAL GRID SUBSTATION
Proposal
SUBMISSION OF DETAILS FOR REQUIREMENT 25 (SURFACE AND FOUL WATER DRAINAGE) IN RELATION TO STAGE 9 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPE...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
DOGGER BANK OFFSHORE WIND FARM PROJECT 3 PROJCO LI
Applicant's Address
SOPHIE DICKSON
1 FORBURY PLACE
43 FORBURY ROAD
READING
RG1 3JH
Agent
Royal HaskoningDHV
Agent's Address
CLAIRE DAVIES
ROYAL HASKONING D H V
53 PORTLAND STREET
MANCHESTER
M1 3LF
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
30/03/2022
Date Valid
30/03/2022
Expiry
01/06/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
01/06/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | (1) No stage of the onshore works may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the relevant planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (1.62 litres per second) in line with the recommendations of the flood risk assessment (Appendix B to Chapter 24 of the environmental statement). (3) The submitted details must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management) |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 221 kb | 30/03/2022 | |
| Covering Letter - Drainage Scheme Stage 9 | 127 kb | 30/03/2022 | |
| Consultee Responses | |||
| Consultee response - Environment Agency | 94 kb | 14/04/2022 | |
| Consultee response - Engineers (Local Lead Flood Authority) | 452 kb | 16/05/2022 | |
| Decision | |||
| Compliance Decision Notice R20220303cd | 130 kb | 01/06/2022 | |
| Supporting Documentation | |||
| Requirement 25 - Drainage Scheme Stage 9 | 476 kb | 30/03/2022 | |
| Requirement 25 - Drainage Scheme Stage 9 Appendix A | 1666 kb | 30/03/2022 | |
| Requirement 25 - Drainage Scheme Stage 9 Appendix B | 4637 kb | 30/03/2022 | |
| Requirement 25 - Drainage Scheme Stage 9 Appendix C | 8384 kb | 30/03/2022 | |
| Requirement 25 - Drainage Scheme Stage 9 Appendix D | 7748 kb | 30/03/2022 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineers (Local Lead Flood Authority) | 31/03/2022 | - |
| Environment Agency | 31/03/2022 | - |