R/2022/0261/FF

Planning Application Details - Official Consultation has expired.

Location
SM THOMPSON LTD DORMOR WAY SOUTH BANK MIDDLESBROUGH TS6 6XH
Proposal
PORTAL FRAMED BUILDING TO HOUSE A LASER PROFILE CUTTING MACHINE
Application Type
Full
Status
Approved
Parish(es)
Applicant
SM THOMPSON LTD
Applicant's Address
MR HARVEVY THOMPSON DORMOR WAY SOUTH BANK MIDDLESBROUGH TS6 6XH
Agent
Simon Hall Architectural Design Ltd.
Agent's Address
MR SIMON HALL 11 THE LAURELS NORTHALLERTON DL6 1SA
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
22/03/2022
Weekly List Expiry Date
-
Date Received
17/03/2022
Date Valid
22/03/2022
Expiry
17/05/2022
Consultation Expiry
14/04/2022
associated_bldreg
R/2022/0247/SB
Decision
GRANT PLANNING PERMISSION
Decision Date
12/05/2022
Decision Level
-

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: - Location plan received by the Local Planning Authority on 17/03/2022 - Site plan as proposed received by the Local Planning Authority on 17/03/2022 - Car parking plan received by the Local Planning Authority on 22/03/2022 - Floor layout plans as proposed received by the Local Planning Authority on 17/03/2022 - Northern and eastern elevations as proposed received by the Local Planning Authority on 17/03/2022 - Southern and Western elevations as proposed received by the Local Planning Authority on 17/03/2022 REASON: To accord with the terms of the planning application.
3 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
4 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
5 The external elevations of the extension(s) hereby approved shall be built in materials to match in type, style and colour the external elevations of the existing dwelling/building. REASON: To ensure that the appearance of the development matches the existing property and would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
6 n the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken, and where remediation is necessary a remediation scheme must be prepared which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. Following completion of the development a report must be submitted confirming that unexpected contamination was not encountered during the development. Reason : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
7 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 272 kb 17/03/2022
Consultee Responses
Consultee response - Environmental Protection (Nuisance) 236 kb 23/03/2022
Consultee response - Environmental Protection (Contaminated Land) 204 kb 07/04/2022
Consultee response - Engineers (Local Lead Flood Authority) 451 kb 13/04/2022
Consultee response - Engineering Team (Highways) 46 kb 11/05/2022
Decision
Decision Notice 422 kb 12/05/2022
Location Plan
Location Plan 60 kb 17/03/2022
Officer Report
Officer Report 428 kb 12/05/2022
Plans
Site Plan as Existing 268 kb 17/03/2022
Site Layout Plan as Existing 270 kb 17/03/2022
Elevations as Existing 257 kb 17/03/2022
Floor Layout Plans as Proposed 358 kb 17/03/2022
Southern and Western Elevations as Proposed 295 kb 17/03/2022
Northern and Eastern Elevations as Proposed 292 kb 17/03/2022
Site Plan as Proposed 278 kb 17/03/2022
Car Parking Plan 329 kb 22/03/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor S Jeffrey (SOUTH BANK) 22/03/2022 -
Councillor Sandra Smith (SOUTH BANK) 22/03/2022 -
Engineering Team (Highways) 22/03/2022 -
Engineers (Local Lead Flood Authority) 22/03/2022 -
Environmental Protection Team 22/03/2022 -
Environmental Protection Team 22/03/2022 -
Health & Safety-Food (Food Team) 22/03/2022 -
Address Date Sent Date Reconsulted Expiry Date
REDCAR AND CLEVELAND B C SOUTH TEES MOTOR SPORT PARK DORMOR WAY SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
TRAIN TO RIDE SOUTH TEES MOTOR SPORT PARK DORMOR WAY SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
ARENA QUADS SOUTH TEES MOTOR SPORT PARK DORMOR WAY SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
TEESSIDE KARTING SOUTH TEES MOTOR SPORT PARK DORMOR WAY SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 1 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 6 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 7B CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
THE COFFEE SHOP CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 5C CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 2-2A CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
COMMUNITY TRADE UNION SUITE 3 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 4 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 5A CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 5B CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
THE HERITAGE GALLERY CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
CORY BROTHERS SUITE 10 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 8 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 12 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 15 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 17 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
ARDMORE CRAIG LTD SUITE 18-19 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
HERTEL UK SUITE 22-24 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 9A CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 9B CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 11 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
VACANT OFFICES CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
CARE VISIONS AT HOME CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 16 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 14 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
RAG AND DOLL SUITE 7A CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 17B CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 15A CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
OFFICE B5 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
DRINK DRIVE NORTH OFFICE B6 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
OFFICE B7 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
OFFICE B8 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
OFFICE B9 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
OFFICE B1 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
OFFICE B2 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
AMAZONA ENTERPRISE LTD OFFICE B3 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
OFFICE B4 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
OFFICE B10 CARGO FLEET BUSINESS CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XJ 22/03/2022 - 12/04/2022
SUITE 1 THE ANNEXE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 2-5 AND 8 THE ANNEXE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 6 THE ANNEXE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
SUITE 7 THE ANNEXE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
DORMOR MACHINE AND ENGINEERING COMPANY LTD DORMOR WAY SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
FIRST CLASS CARS DORMOR WAY SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
THE OFF ROAD CENTRE MIDDLESBROUGH ROAD SOUTH BANK MIDDLESBROUGH TS6 6XH 22/03/2022 - 12/04/2022
Site or Press Description Display Date Expiry Date
S SITE NOTICE ONLY 24/03/2022 14/04/2022