R/2022/0150/FFM

Planning Application Details - Official Consultation has expired.

Location
BRITISH STEEL (SPECIAL PROFILES) BEACH ROAD SKINNINGROVE
Proposal
ERECTION OF TWO STOREY OFFICE BLOCK, 2 SINGLE STOREY INDUSTRIAL BUILDINGS AND EXTENSION TO EXISTING WAREHOUSE INCLUDING TRAILER/LORRY PARKS, LANDSCAPING AND 2.4M HIGH PERIMETERE FENCING
Application Type
Major Application
Status
Approved
Parish(es)
Loftus CP Skelton and Brotton CP
Applicant
BRITISH STEEL LIMITED
Applicant's Address
HEAD OFFICE BRIGG ROAD SCUNTHORPE DN16 1BP
Agent
MAZE Planning Solutions
Agent's Address
ANDREW WATT EUROPA HOUSE BARCROFT STREET BURY BL9 5BT
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
24/02/2022
Weekly List Expiry Date
-
Date Received
17/02/2022
Date Valid
23/02/2022
Expiry
07/06/2022
Consultation Expiry
07/05/2022
associated_bldreg
R/2022/0152/SB
Decision
GRANT PLANNING PERMISSION
Decision Date
07/06/2022
Decision Level
-

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan (Dwg No. S2958-BDN-XX-XX-DR-A-0001 Rev P1) received by the Local Planning Authority on 17/02/22 Proposed Site Plan (Dwg No. S2958-BDN-ZZ-XX-DR-A-0004 Rev P2) received by the Local Planning Authority on 23/02/22 Proposed Floor Plans (Dwg No. S2958-BDN-ZZ-ZZ-DR-A-0005 Rev P1) received by the Local Planning Authority on 17/02/22 Proposed Elevations (Dwg No. S2958-BDN-ZZ-XX-DR-A-0006 Rev P1) received by the Local Planning Authority on 17/02/22 Proposed Zoning Plan (Dwg No. S2958-BDN-ZZ-XX-DR-A-0003 Rev P1) received by the Local Planning Authority on 17/02/22 REASON: To accord with the terms of the planning application.
3 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
4 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
5 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
6 The working hours for all construction activities on this site are limited to between 08:00 and 18:00 Mondays to Friday and 08:00 to 13:00 Saturdays and not at all on a Sunday or Public Holiday. REASON: To ensure that the any activity during the construction development would not have a significant adverse impact in relation to noise and disturbance in accordance with policy SD4 of the Local Plan.
7 Prior to the development being brought into permitted end use, the developer must submit an asbestos mitigation plan to reduce risks to potential workers, neighbours and other offsite receptors. Reason : To ensure that risks from asbestos to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
8 In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken, and where remediation is necessary a remediation scheme must be prepared which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority Following completion of the development a report must be submitted confirming that unexpected contamination was not encountered during the development Reason : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors
9 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 348 kb 22/02/2022
Consultee Responses
Consultee response - Natural England 839 kb 07/03/2022
Consultee response - Northumbrian Water 92 kb 09/03/2022
Consultee response - Loftus Town Council 45 kb 09/03/2022
Consultee response - National Highways 253 kb 10/03/2022
Consultee response - Environmental Protection (Nuisance) 15 kb 11/03/2022
Consultee response - Cleveland Police 51 kb 15/03/2022
Consultee response - Environmental Protection (Contaminated Land) 209 kb 23/03/2022
Consultee response - Engineering Team (Highways) 446 kb 25/03/2022
Consultee response - Environment Agency 138 kb 12/04/2022
Consultee response - Engineers (Local Lead Flood Authority) 452 kb 13/04/2022
Decision
Decision Notice 218 kb 07/06/2022
Location Plan
Location Plan 475 kb 17/02/2022
Officer Report
Officer Report 379 kb 07/06/2022
Plans
Site Plan as Existing 75 kb 17/02/2022
Zoning Plan 93 kb 17/02/2022
Elevations 218 kb 17/02/2022
Floor Plans 650 kb 17/02/2022
Site Plan and Fencing Elevations as Proposed 1486 kb 23/02/2022
Supporting Documentation
Design and Access Statement 4667 kb 17/02/2022
Drainage Strategy 2004 kb 17/02/2022
Bat Appraisal 2455 kb 17/02/2022
Planning Statement 881 kb 17/02/2022
Flood Risk Assessment 4848 kb 17/02/2022
Ecological Impact Assessment 2784 kb 17/02/2022
Site Investigation Report Phase 2 3575 kb 17/02/2022
Transport Assessment 8416 kb 17/02/2022
Ground Gas Risk Assessment Results 1446 kb 21/03/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Business Growth Team 24/02/2022 -
Cleveland Police ALO - Steve Cranston 24/02/2022 -
Councillor B Hunt (BROTTON) 24/02/2022 -
Councillor G Cutler (BROTTON) 24/02/2022 -
Councillor M Fletcher (BROTTON) 24/02/2022 -
Engineering Team (Highways) 24/02/2022 -
Engineers (Local Lead Flood Authority) 24/02/2022 -
Environment Agency 22/03/2022 -
Environmental Protection Team 24/02/2022 -
Environmental Protection Team 24/02/2022 -
Health & Safety-Food (Food Team) 24/02/2022 -
Loftus Town Council 24/02/2022 -
National Highways 24/02/2022 -
Natural England 24/02/2022 -
Natural Heritage Manager 24/02/2022 -
Northumbrian Water Ltd 24/02/2022 -
Place Investment Team 24/02/2022 -
Skelton and Brotton Parish Council 24/02/2022 -
Address Date Sent Date Reconsulted Expiry Date
CARLIN HOW METHODIST CHURCH BEACH ROAD CARLIN HOW SALTBURN BY THE SEA TS13 4EG 24/02/2022 - 17/03/2022
ESKDALE BEACH ROAD CARLIN HOW SALTBURN BY THE SEA TS13 4EQ 24/02/2022 - 17/03/2022
FACTORY T C INDUSTRIES MILL LANE SKINNINGROVE SALTBURN BY THE SEA TS13 4EE 24/02/2022 - 17/03/2022
OVERDEEN BEACH ROAD CARLIN HOW SALTBURN BY THE SEA TS13 4EQ 24/02/2022 - 17/03/2022
T C INDUSTRIES MILL LANE SKINNINGROVE SALTBURN BY THE SEA TS13 4EE 24/02/2022 - 17/03/2022
Site or Press Description Display Date Expiry Date
P ARTICLE 15 11/03/2022 01/04/2022
S ARTICLE 15 13/04/2022 07/05/2022