Location
LAND ALONG THE SOFIA OFFSHORE WIND FARM CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
SUBMISSION OF DETAILS FOR REQUIREMENT 25 (FOUL & SURFACE WATER DRAINAGE SCHEME) FOR STAGES 2 & 4 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPEC...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
SOFIA OFFSHORE WIND FARM LIMITED
Applicant's Address
GEMMA GRIMES
WINDMILL HILL BUSINESS PARK
WHITEHALL WAY
SWINDON
SN5 6PB
Agent
Royal HaskoningDHV
Agent's Address
SOPHIE BEVAN-THOMPSON
2 GREAT COLLEGE STREET
LONDON
SW1P 3NL
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
10/02/2022
Date Valid
07/03/2022
Expiry
01/06/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
01/06/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | (1) No stage of the onshore works may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the relevant planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (1.62 litres per second) in line with the recommendations of the flood risk assessment (Appendix B to Chapter 24 of the environmental statement). (3) The submitted details must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management) |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 30/03/2022 | - |
| Engineers (Local Lead Flood Authority) | 30/03/2022 | - |
| Engineers (Local Lead Flood Authority) | 08/03/2022 | - |
| Environment Agency | 30/03/2022 | - |
| Environment Agency | 08/03/2022 | - |
| Northumbrian Water Ltd | 08/03/2022 | - |
| Northumbrian Water Ltd | 30/03/2022 | - |