R/2022/0112/CD

Planning Application Details - Official Consultation has expired.

Location
LAND ALONG THE SOFIA OFFSHORE WIND FARM CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
SUBMISSION OF DETAILS FOR REQUIREMENT 24 (HIGHWAYS ACCESS MANAGEMENT PLAN) FOR STAGES 2 & 4 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPECIFIED...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
SOFIA OFFSHORE WIND FARM LIMITED
Applicant's Address
GEMMA GRIMES WINDMILL HILL BUSINESS PARK WHITEHALL WAY SWINDON SN5 6PB
Agent
Royal HaskoningDHV
Agent's Address
SOPHIE BEVAN-THOMPSON 2 GREAT COLLEGE STREET LONDON SW1P 3NL
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
10/02/2022
Date Valid
07/03/2022
Expiry
02/05/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
14/04/2022
Decision Level
-

Conditions table
# Condition Details
1 (Highway accesses 24.—(1) No stage of the onshore works may commence until, for that stage, written details of the siting, design, layout and any access management measures for any new permanent or temporary means of access to or from a public highway to be used by vehicular traffic, or any alteration to an existing means of access to or from a public highway used by vehicular traffic, has, after consultation with the highway authority, been submitted to and approved by the relevant planning authority. (2) No stage of the onshore works may commence until, for that stage, written details identifying the routes and accesses for operational maintenance has, following consultation with the highway authority, been submitted to and approved by the relevant planning authority. (3) All highway accesses must be constructed, maintained and removed in accordance with the approved details. (4) For the avoidance of doubt, each set of submitted details approved under paragraph (1) of this requirement may cover one or more stages of the onshore works. Approved Plans/Documents 1.Highways Access Management Plan (Dogger Bank C Reference: RE-PM763-ARCUS-00016 / Sofia Document Reference: 003757616-01) submitted to the Local Planning Authority on 8 December 2020. 2.Appendix 2.1 - Consent Boundaries – OSC Enabling Works - DB-T-DES-0046-02 Rev 03 Offshore Wind Farms – Consent Boundaries: Onshore Converter Station Enabling Works submitted to the Local Planning Authority on 8 December 2020 3.Appendix 2.2 - OCS Enabling Works Stages - DB-T-DES-0040-04 Rev 01 Dogger Bank C & Sofia Onshore Converter Station Enabling Work Stages submitted to the Local Planning Authority on 8 December 2020 4.Appendix 3.1 - Site Access Location Plan - SCP/190608/SK007 Rev B Sofia Offshore Wind Farm TA: Site Access Location Plan submitted to the Local Planning Authority on 8 December 2020 5.Appendix 3.2 - Layout Details and Constructional Specification - 60617518-ACM-XX-00-DR-CE-3005 Rev C Southern Access Road - Proposed Junction with Existing Access Road submitted to the Local Planning Authority on 8 December 2020 6.Appendix 3.3 - Swept Paths - 60617518-ACM-XX-00-DR-CE-3008 - Southern Access Road - Vehicle Tracking submitted to the Local Planning Authority on 8 December 2020 7.Appendix 4.1 - Directional Signing Strategy Masterplan - 190608-D01 Rev B Draft HCV/AIL Traffic Routing and Management Masterplan submitted to the Local Planning Authority on 8 December 2020 8.Appendix 4.2 - Directional Signing to Access 10I -190608-D04 Rev A HCV/AIL Traffic Routing and Temporary Traffic Management Stages 7, 8 and 10 submitted to the Local Planning Authority on 8 December 2020 9.Appendix 5.1 - Dilapidations Scoping Correspondence submitted to the Local Planning Authority on 8 December 2020

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 610 kb 10/02/2022
Covering Letter 160 kb 10/02/2022
Consultee Responses
Consultee response - Engineering Team (Highways) 446 kb 25/03/2022
Decision
Compliance Decision Notice R20220112cd 129 kb 14/04/2022
Supporting Documentation
Requirement 24 - HAMP Stage 2 + 4 Final 413 kb 10/02/2022
Requirement 24 - HAMP Appendix 1.1 Landfall HDD + HVDC Cable Works Stages 2 + 4 2309 kb 10/02/2022
Requirement 24 - HAMP Appendix 2.1 Landfall HDD + HVDC Cable Works Stages 2 + 4 8893 kb 10/02/2022
Requirement 24 - HAMP Appendix 2.2 Landfall HDD + HVDC Cable Works Stages 2 + 4 2433 kb 10/02/2022
Requirement 24 - HAMP Appendix 3.1 Landfall HDD + HVDC Cable Works Stages 2 + 4 1540 kb 10/02/2022
Requirement 24 - HAMP Appendix 4.1 Landfall HDD + HVDC Cable Works Stages 2 + 4 2455 kb 10/02/2022
Requirement 24 - HAMP Appendix 4.2 Landfall HDD + HVDC Cable Works Stages 2 + 4 1322 kb 10/02/2022
Requirement 24 - HAMP Appendix 4.3 Landfall HDD + HVDC Cable Works Stages 2 + 4 3683 kb 10/02/2022
Requirement 24 - HAMP Appendix 5.1 Landfall HDD + HVDC Cable Works Stages 2 + 4 248 kb 10/02/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 08/03/2022 -