R/2022/0108/CD

Planning Application Details - Official Consultation has expired.

Location
LAND ALONG THE SOFIA OFFSHORE WIND FARM CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
DISCHARGE OF CONDITION 7 (SURFACE AND FOUL WATER DRAINAGE SCHEME) FOR STAGE TCPA2 OF PLANNING PERMISSON R/2020/0355/FFM FOR INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS WITHIN FIVE AREAS TO CONNECT EXISTING APPROVED DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS AND LA...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
SOFIA OFFSHORE WIND FARM LIMITED
Applicant's Address
GEMMA GRIMES WINDMILL HILL BUSINESS PARK WHITEHALL WAY SWINDON SN5 6PB
Agent
Royal HaskoningDHV
Agent's Address
SOPHIE BEVAN-THOMPSON 2 GREAT COLLEGE STREET LONDON SW1P 3NL
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
10/02/2022
Date Valid
07/03/2022
Expiry
01/06/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
01/06/2022
Decision Level
-

Conditions table
# Condition Details
1 (1) No stage may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the local planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (16.2 litres per second). (3) The submitted details for each stage must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management). (4) The surface and foul water drainage systems must be constructed, managed and maintained in accordance with the approved details. (5) For the avoidance of doubt, each set of submitted details approved under paragraph (1) of this condition may cover one or more stages. REASON: To ensure the development is supported by a suitably designed surface/foul water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to drainage details which are often the first works on site and relate to site preparation.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 251 kb 10/02/2022
Covering Letter 160 kb 10/02/2022
Consultee Responses
Consultee response - Northumbrian Water 635 kb 23/03/2022
Consultee response - Environment Agency 92 kb 29/03/2022
Consultee response - Engineers (Local Lead Flood Authority) 456 kb 13/04/2022
Consultee response - Environment Agency 92 kb 14/04/2022
Decision
Compliance Decision Notice R20220108cd 129 kb 01/06/2022
Supporting Documentation
Condition 7 - Surface and Foul Water Drainage - Appendix 1.2 2420 kb 10/02/2022
Condition 7 - Surface and Foul Water Drainage - Appendix 2.1 1406 kb 10/02/2022
Condition 7 - Surface and Foul Water Draiange - Appendix 1.1 8880 kb 10/02/2022
R 2020 0355 FFM Decision Notice 4325 kb 10/02/2022
Condition 7 - Surface and Foul Water Drainage Scheme 1177 kb 07/03/2022
Condition 7 - Foul & Surface Water Drainage - Updated 613 kb 30/03/2022
Condition 7 - Foul & Surface Water Drainage - Updated with Tracked Changes 1344 kb 30/03/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Condition Discharge - David Pedlow 08/03/2022 -
Condition Discharge - David Pedlow 30/03/2022 -
Engineers (Local Lead Flood Authority) 30/03/2022 -
Engineers (Local Lead Flood Authority) 08/03/2022 -
Environment Agency 30/03/2022 -
Environment Agency 08/03/2022 -
Northumbrian Water Ltd 08/03/2022 -
Northumbrian Water Ltd 30/03/2022 -