Location
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR FROM THE SOFIA ONSHORE CONVERTER STATION SOUTH OF WILTON INTERNATIONAL INCLUDING THE CABLE CORRIDOR AND UP TO LACKENBY NATIONAL GRID SUBSTATION
Proposal
DISCHARGE OF CONDITION 7 (SURFACE & FOUL WATER DRAINAGE SCHEME) FOR STAGE TCPA3 PART 3 OF TCPA#1 OF THE APPROVED DEVELOPMENT OF PLANNING PERMISSON R/2020/0355/FFM FOR THE INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS WITHIN FIVE AREAS TO CONNECT EXISTING APPROVED DOG...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
PROJCO 3 & SOWFL
Applicant's Address
1 FORBURY PLACE
43 FORBURY ROAD
READING
RG1 3JH
Agent
Arcus Consultancy Services Ltd
Agent's Address
MR TIM WHEELER
SUITE 1C
SWINEGATE COURT EAST
3 SWINEGATE
YORK
YO1 8AJ
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
04/02/2022
Date Valid
04/02/2022
Expiry
26/05/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
25/05/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | (1) No stage may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the local planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (16.2 litres per second). (3) The submitted details for each stage must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management). (4) The surface and foul water drainage systems must be constructed, managed and maintained in accordance with the approved details. (5) For the avoidance of doubt, each set of submitted details approved under paragraph (1) of this condition may cover one or more stages. REASON: To ensure the development is supported by a suitably designed surface/foul water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to drainage details which are often the first works on site and relate to site preparation. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 254 kb | 04/02/2022 | |
| Covering Letter | 277 kb | 04/02/2022 | |
| Consultee Responses | |||
| Consultee response - Environment Agency | 211 kb | 09/02/2022 | |
| Consultee response - Northumbrian Water | 130 kb | 24/02/2022 | |
| Consultee response - Engineers (Local Lead Flood Authority) | 47 kb | 30/03/2022 | |
| Decision | |||
| Compliance Decision Notice | 459 kb | 25/05/2022 | |
| Officer Report | |||
| Compliance Officer Report | 241 kb | 25/05/2022 | |
| Supporting Documentation | |||
| Condition No. 7 - Foul and Surface Water Drainage Scheme | 912 kb | 04/02/2022 | |
| Condition No. 7 - Appendix 2.1 Greenfield Runoff Rates | 305 kb | 04/02/2022 | |
| Condition No. 7 - Consent Boundaries | 1030 kb | 04/02/2022 | |
| Condition No. 7 - Staging Plans | 5520 kb | 04/02/2022 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 08/02/2022 | - |
| Engineers (Local Lead Flood Authority) | 08/02/2022 | - |
| Environment Agency | 08/02/2022 | - |
| Northumbrian Water Ltd | 08/02/2022 | - |