Location
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR FROM THE SOFIA ONSHORE CONVERTER STATION SOUTH OF WILTON INTERNATIONAL INCLUDING THE CABLE CORRIDOR AND UP TO LACKENBY NATIONAL GRID SUBSTATION
Proposal
SUBMISSION OF DETAILS FOR REQUIREMENT 25 (FOUL & SURFACE WATER DRAINAGE SCHEME) FOR STAGE 5 PART 3 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SP...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
DOGGERBANK OFFSHORE WIND FARM PROJECT 3 PROJCO LIM
Applicant's Address
1 FORBURY PLACE
43 FORBURY ROAD
READING
RG1 3JH
Agent
Arcus Consultancy Services Ltd
Agent's Address
MR TIM WHEELER
SUITE 1C
SWINEGATE COURT EAST
3 SWINEGATE
YORK
YO1 8AJ
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
04/02/2022
Date Valid
04/02/2022
Expiry
26/05/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
25/05/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | (1) No stage of the onshore works may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the relevant planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (1.62 litres per second) in line with the recommendations of the flood risk assessment (Appendix B to Chapter 24 of the environmental statement). (3) The submitted details must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management) |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 253 kb | 04/02/2022 | |
| Covering Letter | 668 kb | 04/02/2022 | |
| Consultee Responses | |||
| Consultee response - Environment Agency | 210 kb | 09/02/2022 | |
| Consultee response - Northumbrian Water | 376 kb | 24/02/2022 | |
| Consultee response - Engineers (Local Lead Flood Authority) | 48 kb | 30/03/2022 | |
| Decision | |||
| Complaince Decision Notice | 286 kb | 27/05/2022 | |
| Officer Report | |||
| Compliance Officer Report | 237 kb | 25/05/2022 | |
| Supporting Documentation | |||
| Requirement 25 - Foul and Surface Water Drainage Scheme | 912 kb | 04/02/2022 | |
| Requirement 25 - Drainage Appendix 2.1 Greenfield Runoff Rate Estimation | 305 kb | 04/02/2022 | |
| Requirement 25 - Sofia And Dogger Bank Consent Boundaries | 1030 kb | 04/02/2022 | |
| Requirement 25 - Staging Plan | 5520 kb | 04/02/2022 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 08/02/2022 | - |
| Engineers (Local Lead Flood Authority) | 08/02/2022 | - |
| Environment Agency | 08/02/2022 | - |
| Northumbrian Water Ltd | 08/02/2022 | - |