Location
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR FROM THE SOFIA ONSHORE CONVERTER STATION SOUTH OF WILTON INTERNATIONAL INCLUDING THE CABLE CORRIDOR AND UP TO LACKENBY NATIONAL GRID SUBSTATION
Proposal
DISCHARGE OF CONDITION 7 (FOUL & SURFACE WATER DRAINAGE SCHEME) FOR STAGE TCPA7 OF TCPA#1 OF THE APPROVED DEVELOPMENT OF PLANNING PERMISSON R/2020/0355/FFM FOR THE INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS WITHIN FIVE AREAS TO CONNECT EXISTING APPROVED DOGGER BA...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
SOFIA OFFSHORE WIND FARM LIMITED
Applicant's Address
MS KIM GAULD CLARK
WINDMILL HILL BUSINESS PARK
WHITEHILL WAY
SWINDON
SN5 6PB
Agent
CLARE RUSSELL
Agent's Address
CLARE RUSSELL
20 WESTERN AVENUE
MILTON PARK
MILTON
ABINGDON
OX14 4SH
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
02/02/2022
Date Valid
15/02/2022
Expiry
01/06/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
01/06/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | (1) No stage may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the local planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (16.2 litres per second). (3) The submitted details for each stage must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management). (4) The surface and foul water drainage systems must be constructed, managed and maintained in accordance with the approved details. (5) For the avoidance of doubt, each set of submitted details approved under paragraph (1) of this condition may cover one or more stages. REASON: To ensure the development is supported by a suitably designed surface/foul water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to drainage details which are often the first works on site and relate to site preparation. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Condition 7 - Covering Letter | 122 kb | 02/02/2022 | |
| Application Form | 261 kb | 15/02/2022 | |
| Consultee Responses | |||
| Consultee response - Northumbrian Water | 376 kb | 07/03/2022 | |
| Consultee response - Engineers (Local Lead Flood Authority) | 446 kb | 28/03/2022 | |
| Consultee response - Environment Agency | 94 kb | 14/04/2022 | |
| Decision | |||
| Compliance Decision Notice R20220077cd | 130 kb | 01/06/2022 | |
| Officer Report | |||
| Compliance Officer report | 125 kb | 17/11/2022 | |
| Supporting Documentation | |||
| Condition 7 - Appendix 1.1 Consent Bounday Plan | 1030 kb | 02/02/2022 | |
| Condition 7 - Appendix 1.2 Staging Plan | 5520 kb | 02/02/2022 | |
| Condition 7 - Appendix 2.1 Greenfield Runoff Rate Calculations | 305 kb | 02/02/2022 | |
| Condition 7 - Foul And Surface Water Drainage Scheme | 912 kb | 02/02/2022 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 16/02/2022 | - |
| Councillor A D Brown (DORMANSTOWN) | 16/02/2022 | - |
| Councillor A Turner (LONGBECK) | 16/02/2022 | - |
| Councillor C Brady (KIRKLEATHAM) | 16/02/2022 | - |
| Councillor C Cawley (DORMANSTOWN) | 16/02/2022 | - |
| Councillor C Massey (ESTON) | 16/02/2022 | - |
| Councillor D Rees (ESTON) | 16/02/2022 | - |
| Councillor G Williams (ESTON) | 16/02/2022 | - |
| Councillor L Quartermain (KIRKLEATHAM) | 16/02/2022 | - |
| Councillor M Lockwood (KIRKLEATHAM) | 16/02/2022 | - |
| Councillor Vera Rider (LONGBECK) | 16/02/2022 | - |
| Engineers (Local Lead Flood Authority) | 16/02/2022 | - |
| Environment Agency | 16/02/2022 | - |
| Northumbrian Water Ltd | 16/02/2022 | - |