R/2021/1038/CD

Planning Application Details - Official Consultation has expired.

Location
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
DISCHARGE OF CONDITION 7 (SURFACE AND FOUL WATER DRAINAGE) OF PLANNING PERMISSION R/2020/0355/FFM FOR STAGE TCPA3 PART 2 FOR INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS WITHIN FIVE AREAS TO CONNECT EXISTING APPROVED DOGGER BANK C AND SOFIA WIND OFFSHORE WIND FARMS ...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
DOGGERBANK OFFSHORE WIND FARM PROJECT 3 PROJCO LIM
Applicant's Address
1 FORBURY PLACE 43 FORBURY ROAD READING RG1 3JH
Agent
Arcus Consultancy Services Ltd
Agent's Address
MR TIM WHEELER SUITE 1C SWINEGATE COURT EAST 3 SWINEGATE YORK YO1 8AJ
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
06/12/2021
Date Valid
06/12/2021
Expiry
09/02/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
10/03/2022
Decision Level
-

Conditions table
# Condition Details
1 (1) No stage may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the local planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (16.2 litres per second). (3) The submitted details for each stage must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management). (4) The surface and foul water drainage systems must be constructed, managed and maintained in accordance with the approved details. (5) For the avoidance of doubt, each set of submitted details approved under paragraph (1) of this condition may cover one or more stages. REASON: To ensure the development is supported by a suitably designed surface/foul water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to drainage details which are often the first works on site and relate to site preparation.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Covering Letter 289 kb 06/12/2021
Application Form 167 kb 06/12/2021
Consultee Responses
Consultee response - Engineers (Local Lead Flood Authority) 452 kb 14/12/2021
Consultee response - Northumbrian Water 75 kb 21/12/2021
Consultee response - Engineering Team (Highways) 47 kb 19/01/2022
Decision
Compliance Decision Notice R20211038cd cond 7 129 kb 10/03/2022
Officer Report
Compliance Officer Report R20211038cd cond 7 80 kb 10/03/2022
Supporting Documentation
Condition No. 7 - Surface and Foul Water Drainage 1634 kb 06/12/2021
Condition No. 7 - Appendix 2.1 334 kb 06/12/2021
Condition No. 7 - Appendix 2.2 1065 kb 06/12/2021
Condition No. 7 - Appendix 1.1 4003 kb 06/12/2021
Condition No. 7 - Appendix 1.2 4108 kb 06/12/2021
Condition No. 7 - Appendix 1.3 6054 kb 06/12/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 09/12/2021 -
Engineers (Local Lead Flood Authority) 09/12/2021 -
Environment Agency 09/12/2021 -
Northumbrian Water Ltd 09/12/2021 -