R/2021/1037/CD

Planning Application Details - Official Consultation has expired.

Location
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
SUBMISSION OF DETAILS FOR REQUIREMENT 25 (SURFACE AND FOUL WATER DRAINAGE) STAGE 5 PART 2 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPECIFIED I...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
DOGGERBANK OFFSHORE WIND FARM PROJECT 3 PROJCO LIM
Applicant's Address
1 FORBURY PLACE 43 FORBURY ROAD READING RG1 3JH
Agent
Arcus Consultancy Services Ltd
Agent's Address
MR TIM WHEELER SUITE 1C SWINEGATE COURT EAST 3 SWINEGATE YORK YO1 8AJ
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
06/12/2021
Date Valid
06/12/2021
Expiry
31/01/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
31/01/2022
Decision Level
-

Conditions table
# Condition Details
1 (1) No stage of the onshore works may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the relevant planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (1.62 litres per second) in line with the recommendations of the flood risk assessment (Appendix B to Chapter 24 of the environmental statement). (3) The submitted details must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management)

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Covering Letter 645 kb 06/12/2021
Application Form 167 kb 06/12/2021
Consultee Responses
Consultee response - Environment Agency 37 kb 09/12/2021
Consultee response - Engineers (Local Lead Flood Authority) 47 kb 15/12/2021
Consultee response - Northumbrian Water 75 kb 20/12/2021
Consultee response - Engineering Team (Highways) 47 kb 19/01/2022
Decision
Compliance Decision Notice R20211037cd 131 kb 31/01/2022
Supporting Documentation
Requirement 25 - Foul and Surface Water Drainage Scheme 1635 kb 06/12/2021
Requirement 25 - Drainage Appendix 2.1 Cable Preparation Works Part 2 334 kb 06/12/2021
Requirement 25 - Drainage Appendix 2.2 Cable Preparation Works Part 2 1065 kb 06/12/2021
Requirement 25 - Drainage Appendix 1.1 Cable Preparation Work Part 2 4003 kb 06/12/2021
Requirement 25 - Drainage Appendix 1.2 Cable Preparation Works Part2 4108 kb 06/12/2021
Requirement 25 - Drainage Appendix 1.3 Cable Preparation Works Part 2 6054 kb 06/12/2021
Application Documents
Officer Report 154 kb 27/01/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 07/12/2021 -
Engineers (Local Lead Flood Authority) 07/12/2021 -
Environment Agency 07/12/2021 -
Northumbrian Water Ltd 07/12/2021 -