LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
SUBMISSION OF DETAILS FOR REQUIREMENT 24 (HIGHWAYS ACCESS MANAGEMENT PLAN) FOR STAGE 5 PART 2 FOR TWO OFFSHORE WIND TURBINE GENERATING STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE DOGGER BANK ZONE AND THE BOROUGH OF REDCAR AND CLEVELAND. THE FULL DESCRIPTION OF THE AUTHORISED DEVELOPMENT IS SPECIFI...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
DOGGERBANK OFFSHORE WIND FARM PROJECT 3 PROJCO LIM
Applicant's Address
- - 1 FORBURY PLACE 43 FORBURY ROAD READING RG1 3JH
Agent
Arcus Consultancy Services
Agent's Address
MR TIM WHEELER SUITE 1C SWINEGATE COURT EAST 3 SWINEGATE YORK YO1 8AJ
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
01/12/2021
Date Valid
01/12/2021
Expiry
26/01/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
25/01/2022
Decision Level
-

Conditions table
# Condition Details
1 (1) No stage of the onshore works may commence until, for that stage, written details of the siting, design, layout and any access management measures for any new permanent or temporary means of access to or from a public highway to be used by vehicular traffic, or any alteration to an existing means of access to or from a public highway used by vehicular traffic, has, after consultation with the highway authority, been submitted to and approved by the relevant planning authority. (2) No stage of the onshore works may commence until, for that stage, written details identifying the routes and accesses for operational maintenance has, following consultation with the highway authority, been submitted to and approved by the relevant planning authority. (3) All highway accesses must be constructed, maintained and removed in accordance with the approved details.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Covering Letter 145 kb 01/12/2021
Application Form 167 kb 01/12/2021
Decision
Compliance Decision Notice R20211018cd 78 kb 25/01/2022
Officer Report
Compliance Officer Report R20211018cd 73 kb 25/01/2022
Superseded
HAMP Appendix 3.1 Cable Preparation Works Part 2 - SUPERSEDED 1380 kb 01/12/2021
Supporting Documentation
Requirement 24 - Highways Access Management Plan (HAMP) 463 kb 01/12/2021
HAMP Appendix 1.1 Cable Preparation Works Part 2 5135 kb 01/12/2021
HAMP Appendix 2.1 Cable Preparation Work Part 2 4009 kb 01/12/2021
HAMP Appendix 2.2 Cable Preparation Works Part2 4122 kb 01/12/2021
HAMP Appendix 2.3 Cable Preparation Works Part 2 6060 kb 01/12/2021
HAMP Appendix 3.2 Cable Preparation Works Part 2 3455 kb 01/12/2021
HAMP Appendix 3.3 Cable Preparation Works Part 2 7206 kb 01/12/2021
HAMP Appendix 4.1 Cable Preparation Works Part 2 8103 kb 01/12/2021
HAMP Appendix 4.2 Cable Preparation Works Part 2 1476 kb 01/12/2021
HAMP Appendix 4.3 Cable Preparation Works Part 2 5871 kb 01/12/2021
HAMP Appendix 5.1 Cable Preparation Works Part 2 325 kb 01/12/2021
HAMP Appendix 4.4 Cable Preparation Works Part 2 6736 kb 01/12/2021
HAMP Appendix 3.1 Cable Preparation Works Part 2 - AMENDED 08 12 2021 2615 kb 08/12/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 02/12/2021 -