R/2021/0999/CD

Planning Application Details - Official Consultation has expired.

Location
LAND AT LOW GRANGE FARM SOUTH BANK
Proposal
DISCHARGE OF CONDITONS 20, 22 , 25 AND 30 OF PLANNING PERMISSION R/2014/0372/OOM FOR OUTLINE APPLICATION FOR RESIDENTIAL DEVELOPMENT (UP TO 1250 DWELLINGS) (ALL MATTERS RESERVED)
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
MILLER HOMES LTD
Applicant's Address
MR ANDREW WALL C/O AGENT C/O AGENT C/O AGENT C/O AGENT
Agent
ELG Planning
Agent's Address
MR STEVEN LONGSTAFF GATEWAY HOUSE 55 CONISCLIFFE ROAD DARLINGTON DL3 7EH
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
24/11/2021
Date Valid
24/11/2021
Expiry
19/01/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
03/03/2022
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of development within each phase of the development linked to the phasing plan referred to in condition 3 a lighting scheme for the site shall be submitted to, and approved by, the local planning authority. The scheme shall be implemented in accordance with the approved scheme. REASON: To reduce lighting impacts on bats and other wildlife and in the interest of highways safety.
2 The development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) 1037/02r3 (received by the Local Planning Authority on 12.06.2014) and the following mitigation measures detailed within the FRA: 1. Limiting the surface water run-off generated by the impermeable areas of the site to the existing greenfield run off rate so it will not exceed the run-off from the undeveloped site and not increase the risk of flooding off-site. The run off rate has been agreed as 3.5 l/s/ha of the impermeable area of development. Detailed calculations relating to the impermeable areas of each section of development will need to be carried out once finalised and submitted to the Local Planning Authority. 2. Mitigation measures as detailed in section 6.17 shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority. REASON: To prevent flooding by ensuring the satisfactory storage of/disposal of surface water from the site and to reduce the risk of flooding to the proposed development and future occupants.
3 Development shall not commence until a detailed scheme for the disposal of foul and surface water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Local Lead Flood Authority (LLFA). The detailed surface water drainage scheme shall include the following; • Calculations, incorporating SuDS solutions, for the whole site need to be provided and approved before any development works can progress (30% for climate change is recommended). • Details of adoption of Surface Water pumping station • Details of the adoption of the Surface Water drainage system, including SUDS • A Surface water Drainage Management Plan to include: - Timetable and phasing of construction of the drainage system - Details of any control structures - Measures to control silt levels entering the system and outfalling into any watercourse during the construction process • Submission and approval of a Management and Maintenance Plan prior to the occupation of a dwelling to include; - Plan showing surface water system that is to be adopted - Arrangements for the short and long term maintenance of SuDS elements Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF.
4 Prior to the commencement of development on site full highway construction and layout details shall be submitted to and approved in writing by the local planning authority, to ensure the development is built in accordance with R&C Design Guide and Specification and hence to adoptable standards. The development shall then be completed in accordance with the approved details. REASON: To ensure a satisfactory layout and access in relation to highways safety.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 167 kb 24/11/2021
Consultee Responses
Consultee response - Environment Agency 27 kb 25/11/2021
Consultee response - Environmental Protection (Nuisance) 14 kb 15/12/2021
Consultee response - Northumbrian Water 75 kb 15/12/2021
Consultee response - Engineers (Local Lead Flood Authority) 458 kb 17/12/2021
Consultee response - Engineering Team (Highways) 47 kb 08/02/2022
Consultee response - Engineers (Local Lead Flood Authority) 453 kb 15/02/2022
Decision
Compliance Decision Notice 262 kb 03/03/2022
Officer Report
Compliance Officer Report 199 kb 03/03/2022
Superseded
Condition No. 22 - Proposed Drainage Arrangement Overview P4 3095 kb 06/01/2022
Condition No. 22 - Proposed Drainage Arrangement Reserved Matters Overview T6 3301 kb 06/01/2022
Supporting Documentation
Condition no.20 - Street Lighting Layout Sheet 1 Of 3 720 kb 24/11/2021
Condition no.20 - Street Lighting Layout Sheet 2 Of 3 574 kb 24/11/2021
Condition no.20 - Street Lighting Layout Sheet 3 Of 3 641 kb 24/11/2021
Condition no.20 - Outdoor Lighting Report 1299 kb 24/11/2021
Condition no.22 - Proposed Drainage Arrangement 2437 kb 24/11/2021
Condition no.22 - Microdrainage Calculations 402 kb 24/11/2021
Condition no.22 - Proposed Drainage Arrangement Overview 3066 kb 24/11/2021
Condition no.25 - Pollution Prevention Plan Contacts 568 kb 24/11/2021
Condition no.25 - Pollution Prevention Plan Eston 1808 kb 24/11/2021
Condition no.22 - Drainage Plan Marked up 2343 kb 24/11/2021
Condition no.30 - Hardstanding Construction Details Sheet 2 223 kb 24/11/2021
Condition no.30 - External Works Arrangement Sheet 4 876 kb 24/11/2021
Condition no.30 - External Works Arrangement Sheet 5 717 kb 24/11/2021
Condition no.30 - External Works Arrangement Sheet 1 724 kb 24/11/2021
Condition no.30 - External Works Arrangement Sheet 2 828 kb 24/11/2021
Condition no.30 - External Works Arrangement Overview 1432 kb 24/11/2021
Condition no.30 - Hardstanding Construction Details Sheet 1 426 kb 24/11/2021
Condition no.30 - Carriageway Horizontal Alignment Setting Out Tables 219 kb 24/11/2021
Condition no.30 - External Works Arrangement Sheet 3 719 kb 24/11/2021
Condition no.30 - Carriageway Horizontal Alignment Sheet 4 594 kb 24/11/2021
Condition no.30 - Carriageway Horizontal Alignment Sheet 1 510 kb 24/11/2021
Condition no.30 - Carriageway Horizontal Alignment Overview 901 kb 24/11/2021
Condition no.30 - Carriageway Horizontal Alignment Sheet 2 568 kb 24/11/2021
Condition no.30 - Carriageway Horizontal Alignment Sheet 5 506 kb 24/11/2021
Condition no.30 - Carriageway Horizontal Alignment Sheet 3 503 kb 24/11/2021
Condition no.30 - Culvert Details 468 kb 24/11/2021
Condition no.30 - Surface Finishes And Kerbing Arrangement Sheet 2 897 kb 24/11/2021
Condition no.30 - Surface Finishes And Kerbing Arrangement Sheet 1 795 kb 24/11/2021
Condition no.30 - Surface Finishes And Kerbing Arrangement Sheet 3 873 kb 24/11/2021
Condition no.30 - Section 38 And 278 Agreement Sheet 3 887 kb 24/11/2021
Condition no.30 - Section 38 And 278 Agreement Sheet 2 910 kb 24/11/2021
Condition no.30 - Section 38 And 278 Agreement Sheet 1 812 kb 24/11/2021
Condition No. 22 - Drainage Arrangement Overview P4 - AMENDED 18 01 2022 3095 kb 18/01/2022
Condition No. 22 - Proposed Drainage Arrangement Reserved Matters Overview T6 - AMENDED 18 01 2022 3301 kb 18/01/2022
Condition No. 22 & 25 - Proposed Drainage Arrangement Reserved Matters Overview T7 3292 kb 11/01/2022
Condition No. 22 & 25 - Proposed Drainage Arrangement Overview P5 4138 kb 11/01/2022
Condition No. 22 & 25 - Eston Microdrainage Calculations 384 kb 11/01/2022
Condition No. 22 & 25 - LLFA Comments 59 kb 11/01/2022
Condition No. 22 & 25 - Drainage Strategy Report 12921 kb 11/01/2022
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 25/11/2021 -
Engineers (Local Lead Flood Authority) 25/11/2021 -
Environment Agency 25/11/2021 -
Environmental Protection Team 25/11/2021 -
Northumbrian Water Ltd 25/11/2021 -
Northumbrian Water Ltd 13/01/2022 -