Location
LAND AT LOW GRANGE FARM
SOUTH BANK
Proposal
DISCHARGE OF CONDITONS 20, 22 , 25 AND 30 OF PLANNING PERMISSION R/2014/0372/OOM FOR OUTLINE APPLICATION FOR RESIDENTIAL DEVELOPMENT (UP TO 1250 DWELLINGS) (ALL MATTERS RESERVED)
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
MILLER HOMES LTD
Applicant's Address
MR ANDREW WALL
C/O AGENT
C/O AGENT
C/O AGENT
C/O AGENT
Agent
ELG Planning
Agent's Address
MR STEVEN LONGSTAFF
GATEWAY HOUSE
55 CONISCLIFFE ROAD
DARLINGTON
DL3 7EH
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
24/11/2021
Date Valid
24/11/2021
Expiry
19/01/2022
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
03/03/2022
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | Prior to the commencement of development within each phase of the development linked to the phasing plan referred to in condition 3 a lighting scheme for the site shall be submitted to, and approved by, the local planning authority. The scheme shall be implemented in accordance with the approved scheme. REASON: To reduce lighting impacts on bats and other wildlife and in the interest of highways safety. |
| 2 | The development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) 1037/02r3 (received by the Local Planning Authority on 12.06.2014) and the following mitigation measures detailed within the FRA: 1. Limiting the surface water run-off generated by the impermeable areas of the site to the existing greenfield run off rate so it will not exceed the run-off from the undeveloped site and not increase the risk of flooding off-site. The run off rate has been agreed as 3.5 l/s/ha of the impermeable area of development. Detailed calculations relating to the impermeable areas of each section of development will need to be carried out once finalised and submitted to the Local Planning Authority. 2. Mitigation measures as detailed in section 6.17 shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority. REASON: To prevent flooding by ensuring the satisfactory storage of/disposal of surface water from the site and to reduce the risk of flooding to the proposed development and future occupants. |
| 3 | Development shall not commence until a detailed scheme for the disposal of foul and surface water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Local Lead Flood Authority (LLFA). The detailed surface water drainage scheme shall include the following; • Calculations, incorporating SuDS solutions, for the whole site need to be provided and approved before any development works can progress (30% for climate change is recommended). • Details of adoption of Surface Water pumping station • Details of the adoption of the Surface Water drainage system, including SUDS • A Surface water Drainage Management Plan to include: - Timetable and phasing of construction of the drainage system - Details of any control structures - Measures to control silt levels entering the system and outfalling into any watercourse during the construction process • Submission and approval of a Management and Maintenance Plan prior to the occupation of a dwelling to include; - Plan showing surface water system that is to be adopted - Arrangements for the short and long term maintenance of SuDS elements Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. |
| 4 | Prior to the commencement of development on site full highway construction and layout details shall be submitted to and approved in writing by the local planning authority, to ensure the development is built in accordance with R&C Design Guide and Specification and hence to adoptable standards. The development shall then be completed in accordance with the approved details. REASON: To ensure a satisfactory layout and access in relation to highways safety. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineering Team (Highways) | 25/11/2021 | - |
| Engineers (Local Lead Flood Authority) | 25/11/2021 | - |
| Environment Agency | 25/11/2021 | - |
| Environmental Protection Team | 25/11/2021 | - |
| Northumbrian Water Ltd | 25/11/2021 | - |
| Northumbrian Water Ltd | 13/01/2022 | - |