R/2021/0762/CD

Planning Application Details - Official Consultation has expired.

Location
SALTBURN RIDING SCHOOL MARSKE ROAD SALTBURN BY THE SEA TS12 1PW
Proposal
DISCHARGE OF CONDITIONS 01; 03; 04; 05; 06; 08; 09; 10; 11; 12; 13 ; 14; 15 ;16 OF OUTLINE PLANNING PERMISSION R/2019/0081/OOM FOR DEMOLITION OF EXISTING BUILDINGS TO ALLOW OUTLINE PLANNING PERMISSION WITH SOME MATTERS RESERVED FOR RESIDENTIAL DEVELOPMENT (UP TO 30 DWELLINGS) WITH ASSOCIATED VEHICUL...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
GEFFEN LIMITED
Applicant's Address
SUITE 18 SPRINGBOARD BUSINESS CENTRE 24 ELLERBECK WAY STOKESLEY TS9 5JZ
Agent
GEFFEN LIMITED
Agent's Address
SUITE 18 SPRINGBOARD BUSINESS CENTRE 24 ELLERBECK WAY STOKESLEY TS9 5JZ
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
03/09/2021
Date Valid
08/09/2021
Expiry
03/11/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
25/11/2021
Decision Level
-

Conditions table
# Condition Details
1 Details of the appearance, landscaping, layout and scale, (hereinafter called "the reserved matters") shall be submitted to and approved in writing by the Local Planning Authority before the expiration of three years from the date of this permission. REASON: To reserve the rights of the Local Planning Authority with regard to these matters and required to be imposed pursuant to Sections 91 and 92 of the Planning & Compulsory Purchase Act 2004.
2 Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission (including samples) shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
3 Prior to the construction of the final surface treatment, for any hard surfaced areas, details of the materials to be used shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
4 Prior to the first occupation of the development, hereby approved, boundary walls and fences shall have been erected in accordance with a scheme that has first been submitted to and agreed in writing with the Local Planning Authority. The boundary walls and fences shall thereafter be maintained unless the express consent of the Local Planning Authority is given. REASON: To ensure that any boundary treatments would accord with policy SD4 of the Redcar and Cleveland Local Plan by respecting the character of the site and the surroundings and raising no significant adverse impact on neighbouring occupiers.
5 Prior to occupation of the first completed dwelling on the site a landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The details shall include size, type and species and a programme of work. The development shall be completed in accordance with the approved details. REASON: To ensure that the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
6 Prior to the commencement of development plans showing the existing and proposed ground levels over the site together with finished floor levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as construction activity and site preparation can change existing levels resulting in increased ground levels which the authority needs to consider.
7 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality in accordance with policy SD7 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation
8 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process in accordance with policy SD7 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
9 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality in accordance with policy SD7 of the Local Plan.
10 Development shall not commence until a detailed scheme for the disposal of foul water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to drainage details which are often the first works on site and relate to site preparation.
11 Prior to construction of foundations on site, details shall be submitted to and agreed in writing by the Local Planning Authority, of proposals to provide contractors car parking and material storage within the site. The details approved shall be retained for use until completion of the development unless first agreed in writing with the Local Planning Authority. REASON: To ensure that any parking and storage is provided within the site in the interest of highways safety and in accordance with policy SD4 of the Redcar and Cleveland Local Plan.
12 Prior to the commencement of development, a construction traffic management plan shall be submitted to and agreed in writing with the Local Planning Authority. The scheme hereby approved shall then be implemented in accordance with the construction traffic management plan unless first agreed in writing with the Local Planning Authority. REASON: To ensure that the development does not have an adverse impact on the highway network in accordance with policy SD4 of the Redcar and Cleveland Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as the information relates to construction activity and site preparation.
13 Before any development is commenced a noise and vibration assessment shall be carried out to assess the likelihood of adverse impacts on nearby noise sensitive properties. Where adverse impacts are identified then a scheme of works detailing how the impacts will be reduced to acceptable levels shall be submitted for the prior approval in writing of the local planning authority. The assessment should have due regard to the advice and guidance contained in British Standard BS5228:2009 Code of practice for noise and vibration control on construction and open sites and the development shall be carried out in accordance with any approved scheme of works. REASON: In the interest of neighbour amenity in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to details which are often the first works on site and relate to site preparation.
14 Prior to the commencement of development on site an Ecological Mitigation and Compensation Strategy shall be submitted to and approved in writing by the Local Planning Authority. The development shall then be carried out in accordance with the approved strategy. REASON: To ensure the development does not have an adverse impact with regard to ecological matters in accordance with policy N4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to details which are often the first works on site and relate to site preparation and clearance.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 3894 kb 03/09/2021
Consultee Responses
Consultee response - Natural Heritage Manager 447 kb 21/09/2021
Consultee response - Northumbrian Water 430 kb 22/09/2021
Consultee response - Natural England 737 kb 24/09/2021
Consultee response - Environmental Protection (Nuisance) 191 kb 27/09/2021
Consultee response - Engineers (Local Lead Flood Authority) (1) 453 kb 27/10/2021
Consultee response - Engineering Team (Highways) 47 kb 03/11/2021
Consultee response - Engineers (Local Lead Flood Authority) (2) 804 kb 23/11/2021
Decision
Decision Notice R20190081 71 kb 06/09/2021
Compliance Decision Notice 324 kb 25/11/2021
Officer Report
Officer Report 225 kb 25/11/2021
Supporting Documentation
Planning Discharge Information Letter (002) 85 kb 03/09/2021
Condition No. 09; 10; 11 & 12 - Ste 20 14 22 Flood Routing Exceedance Plan 646 kb 03/09/2021
Condition No. 09; 10; 11 & 12 - Ste 20 14 09d Section 104 Foul & Surface Water 2545 kb 03/09/2021
Condition No. 08 - Ste 20 14 03 02a Levels & Heights Sheet 2 1294 kb 03/09/2021
Condition No. 08 - Ste 20 14 03 01a Levels & Heights Sheet 1 2022 kb 03/09/2021
Condition No. 09; 10; 11 & 12 - Ste 20 14 02d Catchment Plan Impermeable Areas 957 kb 03/09/2021
Condition No. 08 - Site Levels And Building Heights Information 30 Aug 2021 41 kb 03/09/2021
Condition No. 15 - Site Layout Proximity To Nearby Properties 1212 kb 03/09/2021
Condition No. 15 - Noise And Vibration Assesment 30 Aug 2021 53 kb 03/09/2021
Condition No. 09; 10; 11 & 12 - Foul And Surface Water Drainage Scheme Management And Maintenance 131 kb 03/09/2021
Condition No. 13 & 14 - Construction Traffic Car Parking And Materials Storage 67 kb 03/09/2021
Condition No. 01: 03; 04; 05; 06 & 16 - Site Layout, Ecology, Landscaping And Materials 1489 kb 03/09/2021
Condition No. 13 & 14 - 1774.43 Site Operations Plan 30 Aug 2021 2467 kb 03/09/2021
Condition No. 16 - 21 09 02 Bat Survey & Ecological Mitigation & Compensation Strategy E3 Ecology Report R03 1332 kb 03/09/2021
Condition No. 09; 10; 11 & 12 - 21 07 06 Section 104 Sewer Adoption Schedule Re Dwg Ste 20 14 09 110 kb 03/09/2021
Condition No. 09; 10; 11 & 12 - 21 04 30 Saltburn Riding School S104 Approval Letter From Ss At Nwl 35 kb 03/09/2021
Condition No. 09; 10; 11 & 12 - Surface Water Causeway Design Calculations 864 kb 03/09/2021
Condition No. 09; 10; 11 - Flow Control Manhole D 983 kb 10/11/2021
Condition No. 09; 10; 11 - Section 104 Layout D 1737 kb 10/11/2021
Condition No. 09; 10; 11 - Manhole Schedules F 1242 kb 10/11/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 09/09/2021 -
Engineers (Local Lead Flood Authority) 09/09/2021 -
Environmental Protection Team 09/09/2021 -
Natural England 09/09/2021 -
Natural Heritage Manager 09/09/2021 -
Natural Heritage Manager 09/09/2021 -
Northumbrian Water Ltd 09/09/2021 -