R/2021/0616/CD

Planning Application Details - Official Consultation has expired.

Location
SITE A CHURCH HILL LAND OFF BOWLAND ROAD SKELTON
Proposal
DISCHARGE OF CONDITIONS 2, 3, 6, 7, 9, 10, 11, 12 AND 13 OF PLANNING APPROVAL R/2021/0110/VC FOR VARIATION OF PLANNING PERMISSION R/2012/0110/FFM TO AMEND LAYOUT AND HOUSE TYPES FOR 140 RESIDENTIAL UNITS AND REMOVAL OF CONDITION 7 (AFFORDABLE HOUSING)
Application Type
Condition Discharge
Status
Approved
Parish(es)
Skelton and Brotton CP
Applicant
BELLWAY HOME (DURHAM) LTD
Applicant's Address
10 PIONEER COURT MORTON PALMS BUSINESS PARK DARLINGTON DL1 4WD
Agent
ENGLAND AND LYLE
Agent's Address
GATEWAY HOUSE 55 CONISCLIFFE ROAD DARLINGTON CO. DURHAM DL3 7EH
Agent's work phone
01325 469236
Agent's email
Joe@elgplanning.co.uk
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
19/07/2021
Date Valid
21/07/2021
Expiry
15/09/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
15/10/2021
Decision Level
-

Conditions table
# Condition Details
1 Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
2 Prior to the construction of the final surface treatment, for any hard surfaced areas, details of the materials to be used shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
3 Prior to the commencement of development, details shall be submitted to and agreed in writing by the Local Planning Authority, of proposals to provide contractors car parking and material storage within the site. The details approved shall be retained for use until completion of the development unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highway safety.
4 Prior to the commencement of development a traffic management plan for the constructaion phase of development shall be submitted to and agreed in writing with the Local Planning Authority. The scheme hereby approved shall then be implemented in accordance with the traffic management plan unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highways safety.
5 The further mitigation requirements identified in both Phase 1 Habitat and Protected Species Surveys for Sites A and B received by the Local Planning Authority on 15 March 2012 (under reference R/2012/0110/FFM) shall be adhered to the and be subject to a detailed scheme that shall have first been agreed in writing with the Local Planning Authority. REASON: In the interests of nature conservation.
6 Details of the bat and nest boxes to be installed at this site shall be submitted to the Local Planning Authority prior to installation on site. The approved details shall be implemented in their entirety. REASON: In the interests of nature conservation interests.
7 Development shall be implemented in line with the drainage scheme contained within the submitted document entitled “Flood Risk Assessment & Drainage Strategy” dated “February 2021”. The drainage scheme shall ensure that foul flows discharge to the foul sewer at manhole 9501 and ensure that surface water discharges to the surface water sewer downstream of manhole 9502. The surface water discharge rate shall not exceed the available capacity of 11l/sec that has been identified in this sewer. The final surface water discharge rate shall be agreed by the Lead Local Flood Authority. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF and policy SD7 of the Redcar and Cleveland Local Plan.
8 Prior to the commencement of development plans showing the existing and proposed ground levels over the site together with finished floor levels and maximum building heights shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory relationship between existing and proposed buildings in accordance with policy SD4 of the Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as construction activity and site preparation can change existing levels resulting in increased ground levels which the authority needs to consider.
9 No development shall take place until details of how the approved development will meet at least 10% of its predicted energy requirements from the fabric first approach, have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details. REASON: In order to achieve a sustainable development in accordance with policy SD4 of the Redcar and Cleveland Local Plan.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 1679 kb 20/07/2021
Consultee Responses
Consultee response - Northumbrian Water 427 kb 29/07/2021
Consultee response - Engineers (Local Lead Flood Authority) 446 kb 12/08/2021
Consultee Response - Natural Heritage Manager 44 kb 07/09/2021
Consultee response - Natural England 159 kb 16/09/2021
Consultee response - Engineering Team (Highways) (1) 457 kb 17/09/2021
Consultee response - Engineering Team (Highways) (2) 635 kb 14/10/2021
Decision
Compliance Decision Notice 459 kb 15/10/2021
Officer Report
Compliance Officer Report 214 kb 15/10/2021
Superseded
Condition No.7 - Traffic Management Plan - SUPERSEDED 156 kb 20/07/2021
Condition No.3 - Surface Finishes & Kerb Layout, Sheet 3 514 kb 20/07/2021
Condition No.3 - Surface Finishes & Kerb Layout, Sheet 1 576 kb 20/07/2021
Condition No.3 - Surface Finishes & Kerb Layout, Sheet 2 507 kb 20/07/2021
Supporting Documentation
Covering Letter 99 kb 19/07/2021
Condition No.6 - Contractors Site Plan 379 kb 20/07/2021
Condition No.9 - Ecology Report 2175 kb 20/07/2021
Condition No.10 - Bird and Bat Boxes - Site Layout 824 kb 20/07/2021
Condition No.12 - Surface Water Engineering Layout, Sheet 3 726 kb 20/07/2021
Condition No.11 & 12 - Surface Water Engineering Layout, Sheet 1 916 kb 20/07/2021
Condition No.12 - Surface Water Engineering Layout, Sheet 2 735 kb 20/07/2021
Condition No.13 - Energy Statement 258 kb 20/07/2021
Condition No.2 - Material Schedule 419 kb 20/07/2021
Site Layout 823 kb 16/09/2021
Condition No. 3 - Surface Finishes & Kerb Layout, Sheet 1 - AMENDED 04 10 2021 794 kb 04/10/2021
Condition No. 3 - Surface Finishes & Kerb Layout, Sheet 2 - AMENDED 04 10 2021 642 kb 04/10/2021
Condition No. 3 - Surface Finishes & Kerb Layout, Sheet 3 - AMENDED 04 10 2021 746 kb 04/10/2021
Condition No.7 - Traffic Management Plan - AMENDED 14 10 2021 259 kb 14/10/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Councillor C Foggo (SKELTON EAST) 22/07/2021 -
Councillor C Holmes (SKELTON WEST) 22/07/2021 -
Councillor J Craig (SKELTON EAST) 22/07/2021 -
Councillor L Holmes (SKELTON WEST) 22/07/2021 -
Engineering Team (Highways) 04/10/2021 -
Engineering Team (Highways) 22/07/2021 -
Engineers (Local Lead Flood Authority) 22/07/2021 -
Natural England 22/07/2021 -
Natural Heritage Manager 22/07/2021 -
Northumbrian Water Ltd 22/07/2021 -