LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
DISCHARGE OF CONDITION 7 (SURFACE AND FOUL WATER DRAINAGE) OF PLANNING PERMISSION R/2020/0355/FF FOR STAGE TCPA3 PART 1 FOR INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS WITHIN FIVE AREAS TO CONNECT EXISTING APPROVED DOGGER BANK C AND SOFIA WIND OFFSHORE WIND FARMS A...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
PROJCO3 & SOWFL
Applicant's Address
MS VICTORIA RIDYARD 1 FORBURY PLACE 43 FORBURY ROAD READING RG1 3JH
Agent
Royal HaskoningDHV
Agent's Address
CLAIRE DAVIES ROYAL HASKONINGDHV 9TH FLOOR MANCHESTER ONE 53 PORTLAND STREET MANCHESTER M1 3LF
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
28/06/2021
Date Valid
28/06/2021
Expiry
23/08/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
31/08/2021
Decision Level
-

Conditions table
# Condition Details
1 (1) No stage of the onshore works may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the relevant planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (1.62 litres per second) in line with the recommendations of the flood risk assessment (Appendix B to Chapter 24 of the environmental statement). (3) The submitted details must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management)

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Covering Letter 433 kb 28/06/2021
Application Form 168 kb 28/06/2021
Consultee Responses
Consultee response - Environment Agency 38 kb 01/07/2021
Consultee response - Northumbrian Water 376 kb 15/07/2021
Consultee response - Engineers (Local Lead Flood Authority) 449 kb 04/08/2021
Consultee response - Engineering Team (Highways) 449 kb 05/08/2021
Decision
Compliance Decision Notice R20210540cd 167 kb 31/08/2021
Officer Report
Compliance Officer Report R20210540cd 118 kb 31/08/2021
Plans
Condition No. 7 - Surface and Foul Water Drainage 5252 kb 28/06/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 29/06/2021 -
Engineers (Local Lead Flood Authority) 01/07/2021 -
Environment Agency 29/06/2021 -
Northumbrian Water Ltd 29/06/2021 -