R/2021/0174/CD

Planning Application Details - Official Consultation has expired.

Location
DWELLINGS AND LAND AT CAERNARVON CLOSE, SOMERSET ROAD, CHEDDAR CLOSE, AVONDALE CLOSE, MONMOUTH ROAD, ABERDARE ROAD, BRIDGEND CLOSE, GRANGETOWN
Proposal
DISCHARGE OF CONDITIONS 3, 4, 5, 6, 7, 8 & 9 OF PART A OF PLANNING PERMISSION R/2019/0403/FFM AND DISCHARGE OF CONDITIONS 3, 4, 5, 6, 7, 8 & 9 OF PART B OF OUTLINE PERMISSION R/2019/0403/FFM
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
BEYOND HOUSING
Applicant's Address
MS FRANCES BARLOW 14 ENNIS SQUARE DORMANSTOWN TS10 5JR
Agent
LOGIC ARCHITECTURE
Agent's Address
LOGIC ARCHITECTURE BOHO ONE BRIDGE STREET WEST BOHO ZONE MIDDLESBROUGH TS2 1AE
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
02/03/2021
Date Valid
10/03/2021
Expiry
15/06/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
20/09/2021
Decision Level
-

Conditions table
# Condition Details
1 Prior to any works to the external elevations of the existing dwellings details of the external materials to be used (including samples) shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
2 Prior to the construction of the final surface treatment, for any hard surfaced areas, details of the materials to be used shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
3 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
4 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
5 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
6 Prior to commencement of demolition, construction or refurbishment works, a Consturction Environmental Method Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; i) The parking of vehicles for site operatives and visitors; ii) ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) The erection and maintenance of security hoarding including decorative displays; v) Wheel washing facilities; vi) Methods of demolition; vii) Measures to control the emission of noise dust and vibration during the construction period. viii) A scheme for recycling/disposing of waste resulting from demolition and construction works. REASON: To protect the amenity of nearby residents and in the interests of highway safety. REASON FOR PRE COMMENCMENT: The details required for the CEMP relate to setting up of the site and early construction activities.
7 Within six months of the date of this permission a landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The details shall include size, type and species and a programme of work. The development shall be completed in accordance with the approved details. REASON: To ensure that the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
8 Development shall not commence until a detailed scheme for the disposal of foul water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
9 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
10 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
11 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
12 Prior to commencement of demolition, construction or refurbishment works, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; i) The parking of vehicles for site operatives and visitors; ii) ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) The erection and maintenance of security hoarding including decorative displays; v) Wheel washing facilities; vi) Methods of demolition; vii) Measures to control the emission of noise dust and vibration during the construction period. viii) A scheme for recycling/disposing of waste resulting from demolition and construction works. REASON: To protect the amenity of nearby residents and in the interests of highway safety. REASON FOR PRE COMMENCEMENT: The details required for the CEMP relate to setting up of the site and early construction activities.
13 Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission (including samples) shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
14 Prior to the construction of the final surface treatment, for any hard surfaced areas, details of the materials to be used shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 921 kb 10/03/2021
Consultee Responses
Consultee response - Environmental Protection (Nuisance) 193 kb 31/03/2021
Consultee response - Northumbrian Water 376 kb 19/04/2021
Consultee response - Northumbrian Water 427 kb 25/05/2021
Consultee response - Engineers (Local Lead Flood Authority) 449 kb 23/07/2021
Decision
Decision Notice R 2019 0403 423 kb 02/03/2021
Compliance Decision Notice 470 kb 20/09/2021
Supporting Documentation
Condition No. 5; 6; 7 / 4; 5; 6- Maintenance For Below Ground Drainage February 2021 148 kb 02/03/2021
Condition No. 5; 6; 7 / 4; 5; 6 - Drainage Layout 1 Of 7 583 kb 02/03/2021
Condition No. 5; 6; 7 / 4; 5; 6 - Drainage Layout 5 Of 7 546 kb 02/03/2021
Condition No. 5; 6; 7 / 4; 5; 6 -Drainage Layout 2 Of 7 576 kb 02/03/2021
Condition No. 5; 6; 7 / 4; 5; 6 - Drainage Layout 3 Of 7 623 kb 02/03/2021
Condition No. 5; 6; 7 / 4; 5; 6 - Drainage Layout 4 Of 7 749 kb 02/03/2021
Condition No. 5; 6; 7 / 4; 5; 6 - Drainage Layout 6 Of 7 555 kb 02/03/2021
Condition No. 5; 6; 7 / 4; 5; 6 - Drainage Layout 7 Of 7 622 kb 02/03/2021
Condition No. 8 / 7 - Site Logistics Plan 2401 kb 02/03/2021
Condition No. 8 / 7 Construction Environmental Management Plan 3006 kb 02/03/2021
Condition No. 3; 4 / 8 - Proposed External Works Plan Sheet 1 Of 2 1612 kb 02/03/2021
Condition No. 3; 4 / 8 - Proposed External Works Plan Sheet 2 Of 2 2129 kb 02/03/2021
Condition No. 3 / 8 - External Materials - House Type A 3 Bed 1519 kb 02/03/2021
Condition No. 3 / 8 - External Materials - House Type D 3 Bed 1520 kb 02/03/2021
Condition No. 3 / 8 - External Materials - House Type C 3 Bed 1555 kb 02/03/2021
Condition No. 3 / 8 - External Materials - House Type B 3 Bed 1536 kb 02/03/2021
Condition No. 9 - Softworks Proposals Sheet 5 Of 7 2280 kb 02/03/2021
Condition No. 9 - Softworks Proposals Sheet 1 Of 7 2294 kb 02/03/2021
Condition No. 9 - Softworks Proposals Sheet 3 Of 7 2682 kb 02/03/2021
Condition No. 9 - Softworks Proposals Sheet 2 Of 7 2699 kb 02/03/2021
Condition No. 9 - Softworks Proposals Sheet 4 Of 7 4652 kb 02/03/2021
Condition No. 9 - Softworks Proposals Sheet 6 Of 7 2975 kb 02/03/2021
Condition No. 9 - Softworks Proposals Sheet 7 Of 7 3797 kb 02/03/2021
Condition No. 4 / 9 - Landscape Strategy 6922 kb 02/03/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 12/03/2021 -
Engineers (Local Lead Flood Authority) 12/03/2021 -
Environmental Protection Team 12/03/2021 -
Northumbrian Water Ltd 12/03/2021 -