Location
LAND SOUTH OF REDCAR ROAD
NORTH OF 21-77 SOUTH TERRACE
SOUTH BANK
Proposal
DISCHARGE OF CONDITIONS 5 (PARTS A&B) & 7 OF PLANNING PERMISSION R/2020/0489/FFM FOR RESIDENTIAL DEVELOPMENT OF 28 DWELLINGS COMPRISING 25 BUNGALOWS AND 3 1.5 STOREY HOUSES WITH ASSOCIATED HIGHWAY WORKS; NEW VEHICULAR AND PEDESTRIAN ACCESSES AND LANDSCAPING.
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
THIRTEEN GROUP
Applicant's Address
MR STUART HUTCHINSON
2 HUDSON QUAY
2 WINDWARD WAY
MIDDLESBROUGH
TS2 1QG
Agent
HMH Architects
Agent's Address
MR DAVID MCKELLAR
26 ENTERPRISE HOUSE
TEAM VALLEY
GATESHEAD
NE11 0SR
Agent's work phone
Agent's email
Case Officer
Mrs C Griffiths
Case Officer Telephone
01287 612629
Case Officer Email
claire.griffiths@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
01/03/2021
Date Valid
01/03/2021
Expiry
26/04/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
23/03/2021
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | (A) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (B) Implementation of Approved Remediation Scheme The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. (C) Reporting of Unexpected Contamination In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. REASON : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 2 | No development (except for site preparation works) shall take place until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) The erection and maintenance of security hoarding including decorative displays; v) Wheel washing facilities; vi) Measures to control the emission of noise dust and vibration during the construction period. vii) A scheme for recycling/disposing of waste resulting from demolition and construction works. REASON: To protect the amenity of nearby residents and in the interests of highway safety in accordance with policy SD4 of the Redcar and Cleveland Local Plan. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 167 kb | 01/03/2021 | |
| Consultee Responses | |||
| Consultee response - Engineering Team (Highways) | 445 kb | 09/03/2021 | |
| Consultee response - Environmental Protection (Nuisance) | 241 kb | 18/03/2021 | |
| Consultee response - Environmental Protection (Contaminated Land) | 192 kb | 18/03/2021 | |
| Decision | |||
| Decision Notice R20200489 | 118 kb | 01/03/2021 | |
| Decision Notice | 457 kb | 23/03/2021 | |
| Officer Report | |||
| Officer Report | 369 kb | 23/03/2021 | |
| Supporting Documentation | |||
| Condition No 7 - Construction Management Plan | 628 kb | 01/03/2021 | |
| Condition No 5 - Phase 3 Remediation Statement | 6271 kb | 01/03/2021 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineering Team (Highways) | 03/03/2021 | - |
| Environmental Protection Team | 03/03/2021 | - |