R/2021/0125/CD

Planning Application Details - Official Consultation has expired.

Location
LAND NORTH WEST OF GURNEY STREET NEW MARSKE TS11 8EG
Proposal
DISCHARGE OF CONDITIONS 3; 4; 5; 6 ; 7; 9 (PART 6) OF PLANNING PERMISSION R/2020/0245/FFM FOR ERECTION OF 23 DWELLINGS WITH ASSOCIATED PARKING AND LANDSCAPING
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
BEYOND HOUSING
Applicant's Address
4 GLADSTONE ROAD SCARBROUGH YO12 7BH
Agent
NORR CONSULTANTS LTD
Agent's Address
PERCY HOUSE PERCY STREET NEWCASTLE UPON TYNE TYNE & WEAR NE1 4PW
Agent's work phone
Agent's email
Case Officer
Mrs C Griffiths
Case Officer Telephone
01287 612629
Case Officer Email
claire.griffiths@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
15/02/2021
Date Valid
23/02/2021
Expiry
25/05/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
25/05/2021
Decision Level
Delegated

Conditions table
# Condition Details
1 Development shall be implemented in line with the drainage scheme contained within the submitted document entitled “Flood Risk Assessment and Drainage Strategy – Appendix H” dated “25/07/2020”. The drainage scheme shall ensure that foul flows discharge to the combined sewer downstream of manhole 1101 and ensure that surface water discharges to the surface water sewer downstream of manhole 1104. The surface water discharge rate shall not exceed the available capacity of 5.0 l/sec that has been identified in this sewer. The final surface water discharge rate shall be agreed by the Lead Local Flood Authority. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF.
2 Prior to the construction of the final surface treatment, for any hard surfaced areas, details of the materials to be used shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
3 Prior to any development above damp proof course details of the external materials to be used in the carrying out of this permission (including samples) shall have first been submitted to, and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure that the appearance of the development would respect the site and the surroundings in accordance with policy SD4 of the Local Plan.
4 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
5 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
6 Prior to commencement of construction, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the development; iv) The erection and maintenance of security hoarding including decorative displays; v) Wheel washing facilities; vi) Measures to control the emission of noise dust and vibration during the construction period. vii) A scheme for recycling/disposing of waste resulting from construction works. REASON: To protect the amenity of nearby residents and in the interests of highway safety. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to construction details which are often the first works on site and relate to site preparation.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 1837 kb 16/02/2021
Consultee Responses
Consultee response - Environmental Protection (Nuisance) 16 kb 12/03/2021
Consultee response - Engineers (Local Lead Flood Authority) 454 kb 19/05/2021
Decision
Compliance Decision Notice 461 kb 25/05/2021
Officer Report
Compliance Officer Report 324 kb 25/05/2021
Plans
Flood Exceedance Plan 564 kb 30/04/2021
Supporting Documentation
Condition No.3, 6, 7, 9 - Letter For Discharge Of Conditions 46 kb 15/02/2021
Condition No.7 - Detention Basin Details SUPEREDED 523 kb 15/02/2021
Condition No.6 - Drainage Layout 746 kb 15/02/2021
Condition No.3 & 4 - Materials Specification 131 kb 15/02/2021
Condition No.5; 6 & 7 - Flood Risk Assessment 25964 kb 08/04/2021
Condition No.5; 6 & 7 - Road And Drainage Longsections 396 kb 08/04/2021
Condition No.6 & 7 - External Works Layout SUPERSEDED 765 kb 08/04/2021
Condition No.5; 6 & 7 - Drainage Construction Details 470 kb 08/04/2021
Condition No.5; 6 & 7 - Hydrobrake MH Details 309 kb 08/04/2021
Condition No. 5; 6 & 7 - External Works Layout Amended 26.4.2021 766 kb 29/04/2021
Condition No.7 - Detention Basin Details Amended 26.4.2021 530 kb 29/04/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineers (Local Lead Flood Authority) 25/02/2021 -
Engineers (Local Lead Flood Authority) 08/04/2021 -
Environmental Protection Team 25/02/2021 -