R/2021/0067/CD

Planning Application Details - Official Consultation has expired.

Location
LAND AT METALS RECOVERY AREA NORTH WEST OF PD PORTS; NORTH EAST OF SEMBCORP PIPELINE CORRIDOR AND TEES DOCK ROAD SOUTH EAST OF FORMER SLEM WASTE MANAGEMENT FACILITY AND SOUTH WEST OF HIGHFIELD ENVIRONMENTAL FACILITY SOUTH BANK
Proposal
DISCHARGE OF CONDITION 3 OF PLANNING PERMISSION R/2020/0465/FFM FOR DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED WITH GROUND REMEDIATION AND PREPARATION OF LAND FOR DEVELOPMENT
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
TEESWORKS
Applicant's Address
C/O AGENT
Agent
LICHFIELDS
Agent's Address
MISS KATHERINE SIMPSON THE ST NICHOLAS BUILDING ST NICHOLAS STREET NEWCASTLE UPON TYNE NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
27/01/2021
Date Valid
27/01/2021
Expiry
24/03/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
29/03/2021
Decision Level
-

Conditions table
# Condition Details
1 No phase of development shall take place until a Construction Environmental Management Plan (CEMP) for that phase of the development has been submitted to and approved in writing by the Local Planning Authority. The approved CEMP shall be adhered to throughout the construction period of that phase. The CEMP shall include details of any phasing of the approved works across the site and shall demonstrate how the mitigation measures set out in the submitted Habitats Regulations Assessment, Arup, dated 14 August 2020 have been incorporated in to the construction methods and how they will be implemented. The CEMP shall also include the following details: • The method to be used to control the emission of dust, noise and vibration from construction works, including any details of any mitigation measures required; • Measures to control the deposit of mud and debris on adjoining public highways; • Site fencing and security; • Temporary contractors’ buildings, plant, storage of materials, lighting and parking for site operatives; • The use of temporary generators; • The arrangement or turning of vehicles within the site so that they may enter and leave in forward gear; • A risk assessment of construction activities with potentially damaging effects on local ecological receptors including any measures to protect those receptors during construction; • Roles and responsibilities for the implementation of the CEMP requirements and measures; and • Measures to control invasive plant species. REASON: In the interest of neighbour amenity, highways safety and protection of sites of ecological value in accordance with policies SD4 and N4 of the Redcar and Cleveland Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to construction details which are often the first works on site and relate to site preparation.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 167 kb 27/01/2021
Consultee Responses
Consultee response - Environmental Protection (Nuisance) 14 kb 16/02/2021
Consultee response - Engineering Team (Highways) 46 kb 12/03/2021
Decision
Compliance Decision Notice 237 kb 29/03/2021
Officer Report
Compliance Officer Report 62 kb 29/03/2021
Plans
Condition No. 3 - CEMP 5094 kb 27/01/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 28/01/2021 -
Environmental Protection Team 28/01/2021 -
Natural England 16/03/2021 -